Transformers Study guides, Revision notes & Summaries
Looking for the best study guides, study notes and summaries about Transformers? On this page you'll find 962 study documents about Transformers.
Page 2 out of 962 results
Sort by
-
NERC Prep - Bal, Int, & Trans Exam Questions and Answers 2023-2024 Graded A+
- Exam (elaborations) • 22 pages • 2023
- Available in package deal
-
- £12.55
- 1x sold
- + learn more
NERC Prep - Bal, Int, & Trans Exam Questions and Answers Graded A+. What group can approve a change in the 
Disturbance Recovery Period for an Interconnection? 
a. NERC Interconnection Working Group 
b. NERC Operating Committee 
c. NERC Regional Council 
d. NERC Disturbance Analysis Working Group 
c. Check targets and equipment - What is the first thing an operator should do after 
a relay operation? 
a. Check power system stabilizers 
b. Notify adjacent Transmission and Balancing areas 
c. Che...
-
TPC TRANSFORMERS AND AC CURCUITS.
- Exam (elaborations) • 4 pages • 2023
- Available in package deal
-
- £11.74
- + learn more
Heat and ____________ are the main problem areas in transformers. 
Dirt 
 
 
 
Transformer gauges indicate the correct oil level at a temperature of 
25 Degrees Celsius 
 
 
 
You should periodically test the air above the liquid in a transformer for TCG, which stands for transformer 
Combustible Gas 
 
 
 
Inductance is represented in equations by the letter 
L 
 
 
 
XL = 2πfL is the equation for the ____________ reactance of a coil. 
Inductive 
 
 
 
Four inductors with values of 25 h, 5 h, ...
-
APT4801 ASSIGNMENT 6 2023 (TEST NO 6)
- Exam (elaborations) • 13 pages • 2023
-
- £2.28
- 1x sold
- + learn more
APT4801 Assignment 6 2023 (TEST NO 6) 100% TRUSTED workings, explanations and solutions. For assistance call or whatsapp us on +25479 811 9845 . 
QUESTION 1 [22] 
Three-zone mho relays are used for transmission line protection of the power system shown in figure 1 
The line impedances are 
Line 1 – 2: j60 
Line 2 – 3: j40 
Line 2 – 4: j70 
The rated voltage for the HV buses is 400 kV. The CT and VT ratios at B12 are 2 000/1 and 3 600/1, 
respectively. 
Figure 1 power netwo...
-
BOMA – HVAC QUESTIONS AND ANSWERS 100% PASS
- Exam (elaborations) • 14 pages • 2024
- Available in package deal
-
- £8.09
- 1x sold
- + learn more
BOMA – HVAC QUESTIONS AND 
 
ANSWERS 100% PASS 
 
Two basic categories of chillers are the 
compression cycle and absorption 
The five requirements for comfort are proper temperature, humidity, filtration, and ventilation 
circulation 
The primary function of an expansion device is to 
produce a reduction in the pressure on the liquid refrigerant, regulate the flow of refrigerant into 
the evaporator, lower the boiling point of the refrigerant far enough below the temperature of the 
load to g...
-
NERC Final Assessment Exam Correct answers (Already GRADED A)
- Exam (elaborations) • 98 pages • 2023
- Available in package deal
-
- £9.72
- 1x sold
- + learn more
When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. 
A. 100 MW 
B. 10% 
C. 50 MW 
D. 25% 
B. 10% 
 
 
Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? 
A. Nuclear generators 
B. Combustion turbine generators 
C. Geothermal generators 
D. Hydroelectric generators 
C. Geothermal generators...
-
NETA 3 Exam 2023 with 100%Correct Answers.
- Exam (elaborations) • 3 pages • 2023
- Available in package deal
-
- £8.09
- 1x sold
- + learn more
NETA 3 Exam 2023 with 100%Correct Answers. 
Power-factor or dissipation-factor tip-up tests on large dry-type transformers that exceed ______ 
percent should be investigated correct answer1 
A switch or circuit breaker enclosure may be used as a raceway if the conductor fill does not exceed % 
correct answer40 
The Ferranti effect is experienced on a long overhead transmission line when it is correct answerLightly 
loaded 
In fiber optic cables, a 50% reduction in signal strength is a loss of dB...
-
Fire Alarm TFM12 Questions And Answers
- Exam (elaborations) • 7 pages • 2023
- Available in package deal
-
- £8.91
- 1x sold
- + learn more
What does PLFA stand for? - Answer- Power Limited Fire Alarm 
 
What does NPLFA stand for? - Answer- Non Power Limited Fire Alarm 
 
What material must NPLFA circuit conductors be made from - Answer- Only solid or stranded copper is permitted 
 
What is a single station detector? - Answer- Battery powered smoke detectors that do not communicate off premises. 
 
What is a multiple station detector? - Answer- Mains powered smoke detectors with battery backup that are linked together, so that if on...
-
NERC Transmission Practice Test, Exam Q&As, A+ Guide
- Exam (elaborations) • 18 pages • 2023
- Available in package deal
-
- £10.57
- 1x sold
- + learn more
NERC Transmission Practice Test, Exam Q&As, A+ Guide-Station #1 is at 539KV and station #2 is at 534 KV. Which direction will the MVAR typically flow? 
A. From station #1 to station #2 
B. From station #2 to station #1 
C. Downhill based on power angle 
D. Uphill based on power angle - A. From station #1 to station #2 
 
Each transmission operator shall arrange for supply of _____ resources within its boundaries to protect the voltage levels under contingency conditions 
A. Transmission 
B. Gene...
-
LML4806 PORTFOLIO MEMO - MAY/JUNE 2023 - SEMESTER 1 - UNISA (DETAILED MEMO - DISTINCTION GUARANTEED!)
- Exam (elaborations) • 10 pages • 2023
-
- £11.14
- 4x sold
- + learn more
LML4806 PORTFOLIO MEMO - MAY/JUNE 2023 - SEMESTER 1 - UNISA (DETAILED MEMO - DISTINCTION GUARANTEED!) 
 
QUESTION 1 
 
1.1	The Memorandum of Incorporation of Generators Unlimited (Pty) Ltd provides that only the board of directors, or any director authorised by the board, has the power to conclude contracts on behalf of the company. It also states that any transaction that exceeds R10 million must first be authorised by the company’s shareholders at a general meeting by way of an ordinary reso...
-
WA UST Site Assessor Exam
- Exam (elaborations) • 6 pages • 2023
- Available in package deal
-
- £8.91
- 1x sold
- + learn more
What is the hold time for soil and preserved GW GRO samples? - Answer- 14 days 
 
Is an ICC certification needed to install an AST? - Answer- No 
 
Flammability limits of gasoline - Answer- 1.4 to 7.6% 
 
How many days do you have from a tank closure to report/provide the UST checklist to ECY? - Answer- 30 days 
 
MTCA Method A lead CUL, soil - Answer- 250 mg/kg 
 
MTCA Method A lead CUL, GW - Answer- 15 ug/L 
 
Is the vadose zone saturated or unsaturated? - Answer- Unsaturated 
 
List in order ...