Transformers Study guides, Revision notes & Summaries

Looking for the best study guides, study notes and summaries about Transformers? On this page you'll find 962 study documents about Transformers.

Page 2 out of 962 results

Sort by

NERC Prep - Bal, Int, & Trans Exam Questions and Answers 2023-2024 Graded A+
  • NERC Prep - Bal, Int, & Trans Exam Questions and Answers 2023-2024 Graded A+

  • Exam (elaborations) • 22 pages • 2023
  • Available in package deal
  • NERC Prep - Bal, Int, & Trans Exam Questions and Answers Graded A+. What group can approve a change in the Disturbance Recovery Period for an Interconnection? a. NERC Interconnection Working Group b. NERC Operating Committee c. NERC Regional Council d. NERC Disturbance Analysis Working Group c. Check targets and equipment - What is the first thing an operator should do after a relay operation? a. Check power system stabilizers b. Notify adjacent Transmission and Balancing areas c. Che...
    (0)
  • £12.55
  • 1x sold
  • + learn more
TPC TRANSFORMERS AND AC CURCUITS.
  • TPC TRANSFORMERS AND AC CURCUITS.

  • Exam (elaborations) • 4 pages • 2023
  • Available in package deal
  • Heat and ____________ are the main problem areas in transformers. Dirt Transformer gauges indicate the correct oil level at a temperature of 25 Degrees Celsius You should periodically test the air above the liquid in a transformer for TCG, which stands for transformer Combustible Gas Inductance is represented in equations by the letter L XL = 2πfL is the equation for the ____________ reactance of a coil. Inductive Four inductors with values of 25 h, 5 h, ...
    (0)
  • £11.74
  • + learn more
APT4801 ASSIGNMENT 6 2023 (TEST NO 6)
  • APT4801 ASSIGNMENT 6 2023 (TEST NO 6)

  • Exam (elaborations) • 13 pages • 2023
  • APT4801 Assignment 6 2023 (TEST NO 6) 100% TRUSTED workings, explanations and solutions. For assistance call or whatsapp us on +25479 811 9845 . QUESTION 1 [22] Three-zone mho relays are used for transmission line protection of the power system shown in figure 1 The line impedances are Line 1 – 2: j60  Line 2 – 3: j40  Line 2 – 4: j70  The rated voltage for the HV buses is 400 kV. The CT and VT ratios at B12 are 2 000/1 and 3 600/1, respectively. Figure 1 power netwo...
    (0)
  • £2.28
  • 1x sold
  • + learn more
BOMA – HVAC QUESTIONS AND  ANSWERS 100% PASS
  • BOMA – HVAC QUESTIONS AND ANSWERS 100% PASS

  • Exam (elaborations) • 14 pages • 2024
  • Available in package deal
  • BOMA – HVAC QUESTIONS AND ANSWERS 100% PASS Two basic categories of chillers are the compression cycle and absorption The five requirements for comfort are proper temperature, humidity, filtration, and ventilation circulation The primary function of an expansion device is to produce a reduction in the pressure on the liquid refrigerant, regulate the flow of refrigerant into the evaporator, lower the boiling point of the refrigerant far enough below the temperature of the load to g...
    (0)
  • £8.09
  • 1x sold
  • + learn more
NERC Final Assessment Exam Correct answers (Already GRADED A)
  • NERC Final Assessment Exam Correct answers (Already GRADED A)

  • Exam (elaborations) • 98 pages • 2023
  • Available in package deal
  • When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. A. 100 MW B. 10% C. 50 MW D. 25% B. 10% Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? A. Nuclear generators B. Combustion turbine generators C. Geothermal generators D. Hydroelectric generators C. Geothermal generators...
    (1)
  • £9.72
  • 1x sold
  • + learn more
NETA 3 Exam 2023 with 100%Correct Answers.
  • NETA 3 Exam 2023 with 100%Correct Answers.

  • Exam (elaborations) • 3 pages • 2023
  • Available in package deal
  • NETA 3 Exam 2023 with 100%Correct Answers. Power-factor or dissipation-factor tip-up tests on large dry-type transformers that exceed ______ percent should be investigated correct answer1 A switch or circuit breaker enclosure may be used as a raceway if the conductor fill does not exceed % correct answer40 The Ferranti effect is experienced on a long overhead transmission line when it is correct answerLightly loaded In fiber optic cables, a 50% reduction in signal strength is a loss of dB...
    (0)
  • £8.09
  • 1x sold
  • + learn more
Fire Alarm TFM12 Questions And Answers
  • Fire Alarm TFM12 Questions And Answers

  • Exam (elaborations) • 7 pages • 2023
  • Available in package deal
  • What does PLFA stand for? - Answer- Power Limited Fire Alarm What does NPLFA stand for? - Answer- Non Power Limited Fire Alarm What material must NPLFA circuit conductors be made from - Answer- Only solid or stranded copper is permitted What is a single station detector? - Answer- Battery powered smoke detectors that do not communicate off premises. What is a multiple station detector? - Answer- Mains powered smoke detectors with battery backup that are linked together, so that if on...
    (0)
  • £8.91
  • 1x sold
  • + learn more
NERC Transmission Practice Test, Exam Q&As, A+ Guide
  • NERC Transmission Practice Test, Exam Q&As, A+ Guide

  • Exam (elaborations) • 18 pages • 2023
  • Available in package deal
  • NERC Transmission Practice Test, Exam Q&As, A+ Guide-Station #1 is at 539KV and station #2 is at 534 KV. Which direction will the MVAR typically flow? A. From station #1 to station #2 B. From station #2 to station #1 C. Downhill based on power angle D. Uphill based on power angle - A. From station #1 to station #2 Each transmission operator shall arrange for supply of _____ resources within its boundaries to protect the voltage levels under contingency conditions A. Transmission B. Gene...
    (0)
  • £10.57
  • 1x sold
  • + learn more
LML4806 PORTFOLIO MEMO - MAY/JUNE 2023 - SEMESTER 1 - UNISA (DETAILED MEMO - DISTINCTION GUARANTEED!)
  • LML4806 PORTFOLIO MEMO - MAY/JUNE 2023 - SEMESTER 1 - UNISA (DETAILED MEMO - DISTINCTION GUARANTEED!)

  • Exam (elaborations) • 10 pages • 2023
  • LML4806 PORTFOLIO MEMO - MAY/JUNE 2023 - SEMESTER 1 - UNISA (DETAILED MEMO - DISTINCTION GUARANTEED!) QUESTION 1 1.1 The Memorandum of Incorporation of Generators Unlimited (Pty) Ltd provides that only the board of directors, or any director authorised by the board, has the power to conclude contracts on behalf of the company. It also states that any transaction that exceeds R10 million must first be authorised by the company’s shareholders at a general meeting by way of an ordinary reso...
    (0)
  • £11.14
  • 4x sold
  • + learn more
WA UST Site Assessor Exam
  • WA UST Site Assessor Exam

  • Exam (elaborations) • 6 pages • 2023
  • Available in package deal
  • What is the hold time for soil and preserved GW GRO samples? - Answer- 14 days Is an ICC certification needed to install an AST? - Answer- No Flammability limits of gasoline - Answer- 1.4 to 7.6% How many days do you have from a tank closure to report/provide the UST checklist to ECY? - Answer- 30 days MTCA Method A lead CUL, soil - Answer- 250 mg/kg MTCA Method A lead CUL, GW - Answer- 15 ug/L Is the vadose zone saturated or unsaturated? - Answer- Unsaturated List in order ...
    (0)
  • £8.91
  • 1x sold
  • + learn more