Slump test Study guides, Revision notes & Summaries
Looking for the best study guides, study notes and summaries about Slump test? On this page you'll find 624 study documents about Slump test.
Page 4 out of 624 results
Sort by
-
ACI Certification Exam 2024 with 100% correct answers
- Exam (elaborations) • 6 pages • 2024
-
- £12.53
- + learn more
2. T/F: When the concrete contains large aggregate, the testing technician should wet-sieve the sample before making unit weight tests for use in yield computations.Answer - False 
 
4. T/F: Samples smaller than 28L (1 .) are allowed on routine air content, temperature, and slump tests.Answer - True 
 
7. How do you regulate the rate of discharge of the batch from the revolving truck drum mixer or agitator?Answer - By the rate of revolution of the drum 
 
10. While the technician is checking ...
-
ACI Certification Exam Questions With Correct Answers Latest Updated 2024/2025 | Scored A+
- Exam (elaborations) • 7 pages • 2024
- Available in package deal
-
- £10.10
- + learn more
ACI Certification Exam Questions With Correct Answers Latest Updated 2024/2025 | Scored A+. When the concrete contains large aggregate, the testing technician should wet-sieve the sample 
before making unit weight tests for use in yield computations.Answer - False 
4. T/F: Samples smaller than 28L (1 .) are allowed on routine air content, temperature, and slump 
tests.Answer - True 
7. How do you regulate the rate of discharge of the batch from the revolving truck drum mixer or 
agitator?Answe...
-
ACI- Concrete Field-Testing Technician - Grade 1 (Working knowledge of seven basic field tests) latest update 2024
- Exam (elaborations) • 29 pages • 2024
-
- £13.34
- + learn more
ACI- Concrete Field-Testing Technician - 
Grade 1 (Working knowledge of seven 
basic field tests) latest update 2024 
Q1. Start molding specimens for strength tests within 30 minutes after fabricating the 
composite sample. 
A. True 
B. False - CORRECT ANSWER-B. False 
ASTM C172 -Para (4.1.2) - Start molding. 
specimens for strength tests within 15 min after fabricating the 
composite sample. 
Q2. The maximum allowable time between obtaining the first and last portions of the 
composite samp...
-
CMT FINAL TEST-2023-2024 QUESTIONS AND ANSWERS 100% CORRECT
- Exam (elaborations) • 19 pages • 2023
- Available in package deal
-
- £9.29
- + learn more
CMT FINAL TEST-2023-2024 QUESTIONS AND ANSWERS 100% CORRECTCMT FINAL TEST-2023-2024 QUESTIONS AND ANSWERS 100% CORRECTCMT FINAL TEST-2023-2024 QUESTIONS AND ANSWERS 100% CORRECTCMT FINAL TEST-2023-2024 QUESTIONS AND ANSWERS 100% CORRECT 
List the sequence of tasks from start of house to frame for a mono slab. - ANSWER-bench and balance / accurate stake / set forms / form board survey / plumbing underslab / plumbing inspection / prep slab and finish form boards / electrical underslab / soil test ...
-
ACI Concrete Field Testing Technician- Grade I Questions & Answers Solved 100% Correct!!
- Exam (elaborations) • 14 pages • 2024
- Available in package deal
-
- £5.65
- + learn more
The sensor of the temperature measuring device shall be submerged a minimum of _____ in. 
[_____mm] into the freshly mixed concrete. - Answer-3 in. [75 mm] 
The temperature measuring device shall have a capacity of measuring temperature of freshly mixed 
concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - Answer-1 degree F [0.5 C], 30 
degrees F to 120 F [0 C to 50 C] 
The temperature measuring device shall be calibrated _____, or whenever there is a question of _____. - 
...
-
ACI Certification Concrete Field Testing Tech Grade 1 Questions & 100% Verified Answers | Latest Update | Already Graded A+
- Exam (elaborations) • 24 pages • 2024
- Available in package deal
-
- £10.10
- + learn more
The end of the temperature sensing portion of the temperature measuring device is 
submerged a minimum of ___________ into FRESHLY mixed concrete. ☑: 75 mm (3 in) 
The temperature measuring device shall be capable of accurately measuring the 
temperature of freshly mixed concrete to _______________ throughout a range of 
____________ C to _____________ C and _____________ F to ___________ F. ☑: 0.5 C (1 F), 0-50 C (30-120 F) 
The temperature measuring device shall be verified ____________...
-
ACI Concrete Field Testing Technician Questions and Correct Answers, With Complete Verified Solution 2024/2025.
- Exam (elaborations) • 10 pages • 2024
-
- £10.50
- + learn more
ACI Concrete Field Testing Technician Questions and Correct Answers, With Complete Verified Solution 2024/2025. 
 
The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete. 
3 in. [75 mm] 
The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. 
1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C] 
The tempe...
-
ACI Test Questions With Answers Graded A 2024
- Exam (elaborations) • 6 pages • 2024
- Available in package deal
-
- £8.89
- + learn more
The total time allowed between obtaining the first and final portions of a composite sample is - 15 minutes 
 
When it is necessary to wet sieve the concrete sample, wet sieving should be performed after the individual samples are remixed into a composite sample (T or F) - F 
 
Tests for slump, temperature, and air content must begin within ______ minutes after obtaining the composite sample - 5 minutes 
 
Begin molding test specimens within ______ minutes after obtaining the composite sample - ...
-
ACI Concrete Field Testing Technician- Grade I Questions and Correct Answers, With Complete Solution 2024/2025.
- Exam (elaborations) • 10 pages • 2024
-
- £10.82
- + learn more
ACI Concrete Field Testing Technician- Grade I Questions and Correct Answers, With Complete Solution 2024/2025. 
 
The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete. 
3 in. [75 mm] 
The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. 
1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C] 
The tempe...
-
ACI Concrete Field Testing Technician- Grade I Graded A Q&A Complete
- Exam (elaborations) • 14 pages • 2024
- Available in package deal
-
- £6.46
- + learn more
Section 1: Temperature of Freshly Mixed Hydraulic-Cement Concrete - C1064 
The end of the temperature sensing portion of the temperature measuring device is submerged a 
minimum of _____ into the freshly mixed concrete. - 3 inches 
The temperature measuring device shall be capable of accurately measuring temperature of freshly 
mixed concrete to _____, throughout a range of _____. - +/- 1 °F 
30 °F to 120 °F 
The temperature measuring device shall be verified _____, or whenever there is a que...