Slump test Study guides, Revision notes & Summaries

Looking for the best study guides, study notes and summaries about Slump test? On this page you'll find 646 study documents about Slump test.

Page 3 out of 646 results

Sort by

Concrete ACI Certification Exam - Questions and Answers
  • Concrete ACI Certification Exam - Questions and Answers

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • Concrete ACI Certification Exam - Questions and Answers What must be done if the concrete drops below the top of the Slump mold while the top layer is being rodded? Add additional concrete to keep an excess of concrete above the top of the mold at all times Rod each layer ___ times uniformly over the cross section with the rounded end of the rod. 25 The slump mold is filled in _____ layers. 3 layers True or false the slump mold should be in a dry condition before beginning the test? False. For...
    (0)
  • £14.89
  • + learn more
ACI Concrete Field Testing Technician – Grade I - Q & A
  • ACI Concrete Field Testing Technician – Grade I - Q & A

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • ACI Concrete Field Testing Technician – Grade I - Q & A The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete. 3 in. [75 mm] The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. 1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C] The temperature measuring device shall be calibrated _____, or whene...
    (0)
  • £14.49
  • + learn more
ACI CONCRETE FIELD TESTING TECHNICIAN EXAM QUESTIONS AND ANSWERS LATEST UPDATED 2024/2025 | RATED A+.
  • ACI CONCRETE FIELD TESTING TECHNICIAN EXAM QUESTIONS AND ANSWERS LATEST UPDATED 2024/2025 | RATED A+.

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • ACI CONCRETE FIELD TESTING TECHNICIAN EXAM QUESTIONS AND ANSWERS LATEST UPDATED 2024/2025 | RATED A+. The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - Correct Answer - 1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C] The temperature measuring device shall be calibrated _____, or whenever there is a question of _____. - Correct Answer - Annually, accuracy The temp...
    (0)
  • £11.27
  • + learn more
ACI Concrete Field Testing Technician - Grade 1 (18) Exam Questions and Answers 2024 Correctly done
  • ACI Concrete Field Testing Technician - Grade 1 (18) Exam Questions and Answers 2024 Correctly done

  • Exam (elaborations) • 29 pages • 2024
  • Available in package deal
  • ASTM C1064 - Answer-Standard Test Method For Temperature of Freshly Mixed Hydraulic-Cement Concrete The end of the temperature sensing portion of the temperature measuring device shall be submerged a minimum of ____ into the freshly mixed concrete. - Answer-3 inches [75 mm] C1064, Sec. 8.1 The temperature measuring device shall have a capacity of measuring the temperature of freshly mixed concrete to ± ____ °F (± ____ °C) throughout a range of ____ °F ( ____ °C). - Answer-±1 °F (±...
    (0)
  • £6.76
  • + learn more
ACI Certification Exam Questions With Verified Answers, Latest UPDATED 2024/2025 | Scored A+
  • ACI Certification Exam Questions With Verified Answers, Latest UPDATED 2024/2025 | Scored A+

  • Exam (elaborations) • 19 pages • 2024
  • - Standard Test Method For Temperature of Freshly Mixed Hydraulic-Cement Concrete The sensor of the temperature measuring device shall be submerged a minimum of ______ inches into the freshly mixed concrete. Answer - 3" The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to ± ______ °F throughout a range of ____________. Answer - 1 degree, 30 degrees to 120 degrees The temperature measuring device shall be calibrated ______ , or whe...
    (0)
  • £12.47
  • + learn more
ACI Concrete Field-Testing Technician- Grade I Questions and Answers Fully solved 2024
  • ACI Concrete Field-Testing Technician- Grade I Questions and Answers Fully solved 2024

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • ACI Concrete Field-Testing Technician- Grade I Questions and Answers Fully solved 2024 The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete. 3 in. [75 mm] The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. 1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C] The temperature measurin...
    (0)
  • £14.49
  • + learn more
ACI Concrete Testing Questions and Answers Graded A+
  • ACI Concrete Testing Questions and Answers Graded A+

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • ACI Concrete Testing Questions and Answers Graded A+ ASTM C31 Making and curing concrete test specimens in the field ASTM C231 Concrete Air Content Test - Pressure Method ASTM C173 Concrete Air Content Test - Volume Method ASTM C172 Sampling Fresh Concrete ASTM C143 Standard Test Method for Slump of Hydraulic-Cement Concrete ASTM C138 Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete ASTM C1064 Stand...
    (0)
  • £14.49
  • + learn more
ACI Certification Concrete Field Testing Tech Grade 1 Questions and Answers 100% Verified
  • ACI Certification Concrete Field Testing Tech Grade 1 Questions and Answers 100% Verified

  • Exam (elaborations) • 14 pages • 2024
  • Available in package deal
  • ACI Certification Concrete Field Testing Tech Grade 1 Questions and Answers 100% Verified The end of the temperature sensing portion of the temperature measuring device is submerged a minimum of ___________ into FRESHLY mixed concrete. - Answer- 75 mm (3 in) The temperature measuring device shall be capable of accurately measuring the temperature of freshly mixed concrete to _______________ throughout a range of ____________ C to _____________ C and _____________ F to ___________ F. - An...
    (0)
  • £10.86
  • + learn more
CMT FINAL TEST- QUESTIONS AND ANSWERS
  • CMT FINAL TEST- QUESTIONS AND ANSWERS

  • Exam (elaborations) • 18 pages • 2023
  • List the sequence of tasks from start of house to frame for a mono slab. - Answer- bench and balance / accurate stake / set forms / form board survey / plumbing underslab / plumbing inspection / prep slab and finish form boards / electrical underslab / soil test / county inspection/ white book in line inspection/ pour slab / rough grade. What does B&B stand for? - Answer- Bench and balance what is the psf of the soils have to be in the footing of a mono slab? - Answer- 2000 What is the ...
    (0)
  • £10.06
  • + learn more
ACI Test Questions and Answers Guaranteed A+
  • ACI Test Questions and Answers Guaranteed A+

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • ACI Test Questions and Answers Guaranteed A+ The total time allowed between obtaining the first and final portions of a composite sample is 15 minutes When it is necessary to wet sieve the concrete sample, wet sieving should be performed after the individual samples are remixed into a composite sample (T or F) F Tests for slump, temperature, and air content must begin within ______ minutes after obtaining the composite sample 5 minutes Begin molding test specimens within...
    (0)
  • £14.89
  • + learn more