CYB 210 (CYB-210)

Southern New Hampshire University

Here are the best resources to pass CYB 210 (CYB-210). Find CYB 210 (CYB-210) study guides, notes, assignments, and much more.

Page 2 out of 40 results

Sort by

CYB-210 Module 7 Project Two
  • CYB-210 Module 7 Project Two

  • Exam (elaborations) • 17 pages • 2023
  • CYB-210 Module 7 Project Two.
    (0)
  • $25.49
  • + learn more
CYB-210 Project Two Network Design Rationale
  • CYB-210 Project Two Network Design Rationale

  • Exam (elaborations) • 3 pages • 2023
  • CYB-210 Project Two Network Design Rationale. The first requirement is to create a new IP config that combines both Subnet1 and Subnet2 into a new network, NetworkA; which must be a Class C network. To do this, we removed the switch for Subnet2 and connected all those devices to the switch for Subnet1. The switch was renamed to NetworkA_Switch and is now accommodating all devices previously on Subnet1 and Subnet2, which have also been renamed accordingly. The IP Address for NetworkA
    (0)
  • $14.49
  • + learn more
CYB-210 Project One Computer Network Modification Brief
  • CYB-210 Project One Computer Network Modification Brief

  • Exam (elaborations) • 11 pages • 2023
  • CYB-210 Project One Computer Network Modification. Add free guest wireless internet for the customers  Install cameras that monitor the front desk and the waiting area.  Reconfigure the current network to support the new hardware. The needed hardware is already in the office, so the cameras and wireless router were harvested from the equipment closet. To get the network ready for the new hardware, the existing switch was reconfigured first. After selecting the switch and clicking on ...
    (0)
  • $19.49
  • + learn more
CYB-210 Project One Computer Network Modification Brief
  • CYB-210 Project One Computer Network Modification Brief

  • Exam (elaborations) • 13 pages • 2023
  • CYB-210 Project One Computer Network Modification Brief. On the LAN option under the config tab of he router, the IP address is set to 192.168.70.10 (see Figure 3). Verified that the IPconfiguration was set to DHCP on the internet option under the config tab of the router (see Figure 4). Verified that the IP configuration was set to DHCP on the internet option under the config tab of the router (see Figure 5). Configuration is continued in the wireless section under the config tab. The SSID...
    (0)
  • $18.49
  • + learn more
CYB-210 Project Two: Network Diagram and Rationale
  • CYB-210 Project Two: Network Diagram and Rationale

  • Exam (elaborations) • 12 pages • 2023
  • CYB-210 Project Two: Network Diagram and Rationale. CYB-210 Project Two: Network Diagram and Rationale
    (0)
  • $28.49
  • + learn more
CYB-210 Project Two Network Design Rationale
  • CYB-210 Project Two Network Design Rationale

  • Exam (elaborations) • 3 pages • 2023
  • Available in package deal
  • CYB-210 Project Two Network Design Rationale. The pre-existing network was separated into two segments, being Subnet1 and Subnet2. Once the acquires company came aboard and a new network was added, Network3, some changes and requirements to a new network were necessary. Since the addition of the hardware of the new company can not be fully trusted, they need to remain on their own network but still be able to communicate with the current pre-existing network. Once new hardware arrives it ca...
    (0)
  • $14.49
  • + learn more
CYB-210 Project One Computer Network Modification Brief
  • CYB-210 Project One Computer Network Modification Brief

  • Exam (elaborations) • 11 pages • 2023
  • Available in package deal
  • CYB-210 Project One Computer Network Modification Brief. This brief will explain the steps that were taken to configure new devices and the network. Screenshots are included for each step for better understanding. Completed the following:  Add free guest wireless internet for the customers  Install cameras that monitor the front desk and the waiting area.  Reconfigure the current network to support the new hardware. The needed hardware is already in the office, so the cameras and ...
    (0)
  • $21.99
  • + learn more
CYB-210 week 6 Project One: Computer Networking Modification Brief
  • CYB-210 week 6 Project One: Computer Networking Modification Brief

  • Exam (elaborations) • 11 pages • 2023
  • Available in package deal
  • CYB-210 week 6 Project One: Computer Networking Modification Brief. This project consists of multiple items that need to be added as well as configured:  Add free guest wireless internet for the customers  Add tablet and smart phone to guest area  Install cameras that monitor the front desk and the waiting area.  Reconfigure the current network to support the new hardware. The needed hardware is already in the office, so the cameras and wireless router as well as the tablet an...
    (0)
  • $18.49
  • + learn more
CYB-210 Project Two: Network Diagram and Rationale
  • CYB-210 Project Two: Network Diagram and Rationale

  • Exam (elaborations) • 12 pages • 2023
  • Available in package deal
  • CYB-210 Project Two: Network Diagram and Rationale. In this scenario we are tasked with combining Subnet1 and Subnet2 into NetworkA, configure static routing between NetworkA and Network3 configure DHCP and DNS services, and NAT configuration for ping capabilities and communication between the networks. To start I decide to delete Subnet2 and shut down the unused port FA0/1 on the Subnet_Router for better security. I than moved all the computers and printers from Subnet2 to Subnet1 and reco...
    (0)
  • $22.49
  • + learn more
CYB-210 Module 7 Project Two
  • CYB-210 Module 7 Project Two

  • Exam (elaborations) • 17 pages • 2023
  • Available in package deal
  • CYB-210 Module 7 Project Two. This project was a little more tricker than the other one. With this project we were given 3 networks. Networks A and B needed to be connected into one with a new network scheme. Network 3 and the new network needed to be connected together. With this being said I added a third switch to account for future expansion. I kept the two switches we were given for subnet 1 and 2 and added a third to connect the networks to that switch and then into the router. Doing ...
    (0)
  • $24.49
  • + learn more