API-653 – TEMPERATURES EXAM QUESTIONS AND ANSWERS 100% PASS
  • API-653 – TEMPERATURES EXAM QUESTIONS AND ANSWERS 100% PASS

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • API-653 – TEMPERATURES EXAM QUESTIONS AND ANSWERS 100% PASS Reconstruction -Base metal temp where welding is not allowed - Correct Answer ️️ -< 0 F --- ref. (653: 10.4 .2.3 ) Reconstruction -Base metal temp when hand-warm pre-heat is required - Correct Answer ️️ -0-32 F --- ref. (653: 10.4.2.3 ) Linings -Minimum temp when performing abrasive blasting - Correct Answer ️️ -5 of above dew point --- ref. (0.) Linings -Minimum temp when installing tank bottom linings - Correc...
    (0)
  • $10.49
  • + learn more
API 653 FORMULAS EXAM QUESTIONS AND ANSWERS 100% PASS
  • API 653 FORMULAS EXAM QUESTIONS AND ANSWERS 100% PASS

  • Exam (elaborations) • 0 pages • 2024
  • Available in package deal
  • API 653 FORMULAS EXAM QUESTIONS AND ANSWERS 100% PASS Linings- Typically anchor profile of steel surface required for the installation of a tank bottom lining 652: 7.5 - Correct Answer ️️ -1.5-4.0 mils Welds- Maximum undercut of a vertical weld & nozzle weld 650: 8.5.2.b - Correct Answer ️️ -1/64" Welds- Maximum undercut of a horizontal weld 650: 8.5.2.b - Correct Answer ️️ -1/32" Welds- Maximum diameter of a surface porosity cluster 650: 8.5.2.c - Correct Answer ️️ -3/...
    (0)
  • $12.49
  • + learn more
API 653 Certification - Practice Exam - Open Book Questions and Answers 100% Pass
  • API 653 Certification - Practice Exam - Open Book Questions and Answers 100% Pass

  • Exam (elaborations) • 26 pages • 2024
  • Available in package deal
  • API 653 Certification - Practice Exam - Open Book Questions and Answers 100% Pass An insert plate is required for a new 4 NPS nozzle (4.5" O.D.) in the shell. What is the minimum diameter for this insert? A. 4.5" B. 9" C. 12" D. 16.5" - Correct Answer ️️ -D. 16.5" A welder is qualified on a plate in the 3G position. The welder is qualified for what fillet weld position(s)? A. None B. F, H C. F, H, V D. All fillets - Correct Answer ️️ -C. F, H, V When must a shim be pl...
    (0)
  • $12.49
  • + learn more
API 653 preparation Exam Questions and Answers 100% Pass
  • API 653 preparation Exam Questions and Answers 100% Pass

  • Exam (elaborations) • 58 pages • 2024
  • Available in package deal
  • API 653 preparation Exam Questions and Answers 100% Pass Owner API 653 1.2 - Correct Answer ️️ -Overall responsibility for compliance with API 653? Engineer API 653 4.3.1.2 - Correct Answer ️️ -Responsibility - evaluate deterioration of existing shell material? Steel storage tanks built to API 650 and its predecessor API 12c (API 653 1.1.1) - Correct Answer ️️ -What does api 653 cover? Minimum requirements for maintaining the integrity of tanks after they have been placed in...
    (0)
  • $13.49
  • + learn more
Review of API-653 Questions and Answers 100% Pass
  • Review of API-653 Questions and Answers 100% Pass

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • Review of API-653 Questions and Answers 100% Pass Replacement shell plate may be circular,oblong,square with rounded corners or rectangular with rounded corners except when: - Correct Answer ️️ -an entire shell plate is replaced Shell replacement patch plates shall be welded with butt joints with complete penetration and complete fusion, except as: - Correct Answer ️️ -permitted for lapped patch shell repairs Joints in lap-welded shell tanks: - Correct Answer ️️ -may be repair...
    (0)
  • $12.49
  • + learn more
API 653 Data Sheets Exam Questions and Answers 100% Pass
  • API 653 Data Sheets Exam Questions and Answers 100% Pass

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • API 653 Data Sheets Exam Questions and Answers 100% Pass Fitness For Service - Correct Answer ️️ -API 579 Low Pressure Storage Tanks - Correct Answer ️️ -API 620 Risked Based Inspection - Correct Answer ️️ -API 580 Cathodic Protection - Correct Answer ️️ -API 651 Tank Bottom Linings - Correct Answer ️️ -API 652 Welding on in service equipment containing flammables - Correct Answer ️️ -API 2201 NDE Procedure Guidlines - Correct Answer ️️ -ASME Section V Accept...
    (0)
  • $12.49
  • + learn more
Codewest Test -API 650 & 653 Questions with 100% Correct Answers
  • Codewest Test -API 650 & 653 Questions with 100% Correct Answers

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • Codewest Test -API 650 & 653 Questions with 100% Correct Answers The measurements for internal bottom settlement shall have a maximum of _______ feet spacing between elevation points across the diameter? - Correct Answer ️️ -10 completed welds of stress relieved assemblies shall be examined by ____ ,after stress relieving, but before hydrotest - Correct Answer ️️ -MT or PT vertical shell joints for new replacement shell plates to existing shell plates or repaired joints in the exi...
    (0)
  • $10.49
  • + learn more
API 653 TOP Exam Guide Questions and  CORRECT Answers
  • API 653 TOP Exam Guide Questions and CORRECT Answers

  • Exam (elaborations) • 21 pages • 2024
  • Who Determines to use RBI methodologies? - Owner/Operator RBI Document - API Code? - API 580 What are the two factors of Risk? - Consequence of failure and Likelihood of Failure RBI Assessments must be thoroughly___________? - Documented Who conducts an RBI Assessment? - Team of Knowledgeable of RBI Principles RBI Assessments shall be repeated at least every ______ Years? - 10 years
    (0)
  • $8.99
  • + learn more
API 653 - (9.10) Repair of Tank Bottoms Quizzes & Ans 100% Correct!!
  • API 653 - (9.10) Repair of Tank Bottoms Quizzes & Ans 100% Correct!!

  • Exam (elaborations) • 21 pages • 2024
  • API 653 - (9.10) Repair of Tank Bottoms Quizzes & Ans 100% Correct!!
    (0)
  • $7.99
  • + learn more
API-653 – TEMPERATURES QUESTIONS AND ANSWERS 100% PASS
  • API-653 – TEMPERATURES QUESTIONS AND ANSWERS 100% PASS

  • Exam (elaborations) • 4 pages • 2024
  • Reconstruction -Base metal temp where welding is not allowed < 0 F --- ref. (653: 10.4 .2.3 ) Reconstruction -Base metal temp when hand-warm pre-heat is required 0-32 F --- ref. (653: 10.4.2.3 ) Linings -Minimum temp when performing abrasive blasting 5 of above dew point --- ref. (0.) Linings -Minimum temp when installing tank bottom linings 5 of above dew point --- ref. (0.)