Codewest Test -API 650 & 653 Questions with 100% Correct Answers
Codewest Test -API 650 & 653 Questions with 100% Correct Answers The measurements for internal bottom settlement shall have a maximum of _______ feet spacing between elevation points across the diameter? - Correct Answer ️️ -10 completed welds of stress relieved assemblies shall be examined by ____ ,after stress relieving, but before hydrotest - Correct Answer ️️ -MT or PT vertical shell joints for new replacement shell plates to existing shell plates or repaired joints in the existing shell plates shall have ____ additional radiograph (s) taken in each joint - Correct Answer ️️ -1 the name plate for a reconstructed tank shell have: - Correct Answer ️️ -design conditions listed the Min. length of readable RT film according to API 653 is? - Correct Answer ️️ -6" when the corrosion rate of a tank is known the interval between taking UT thickness measurements shall be the smaller of RCA/2N or - Correct Answer ️️ -15 years if the corrosion rate is not known , what is the in-service UT interval ? - Correct Answer ️️ -5 years general inspection reports shall include - Correct Answer ️️ -metal thicknes measurements, conditions found, repairs,any settlement measurements,and recommendations
Written for
- Institution
- Api 653
- Course
- Api 653
Document information
- Uploaded on
- May 31, 2024
- Number of pages
- 3
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
codewest test api 650 653 questions with 100 c
Also available in package deal