logo-home

Charlene's Scholastic Emporium.

Your Actual and Virtual Exam Tests Excellent Tutor.

Bijlesdocent EmilyCharlene helpt jou met studeren door samenvattingen te schrijven van studiemateriaal

EmilyCharlene helpt met

Meer zien

Community

  • Volgers
  • Volgend

18 Ontvangen beoordelingen

13 items

PJM Exam Questions and Answers 100% Correct

(0)
€11,90
0x  verkocht

PJM Exam Questions and Answers 100% Correct During reactive testing, which entity must give approval to change an approved voltage schedule? PJM, TOP, MOC, GO - Correct Answer ️️ -TO Generation available within 10 minutes for offline reserve units: Quick-start (hydro), manual, operating, supplemental - Correct Answer ️️ -Quick-start (hydro) Minimum MVARs for an individual generator that is required to do reactive testing? - Correct Answer ️️ -20 MVA Minimum MVARs for an aggr...

i x
  •  Voordeelbundel
  • Tentamen (uitwerkingen)
  •  • 16 pagina's • 
  • door EmilyCharlene • 
  • geupload  23-04-2024
Snel bekijken
i x

PJM Generation Cert Questions and Answers 100% Correct

(0)
€11,90
0x  verkocht

PJM Generation Cert Questions and Answers 100% Correct Actions in low voltage alert? - Correct Answer ️️ -Review transmission & generation outages Request reactive reserve check Heavy load voltage schedule warning purpose is to have members prepare far max support of voltages on the? - Correct Answer ️️ -Bulk Power System Manual load dump warning & reduction of Non-critical plant load issued when? - Correct Answer ️️ -Primary reserve is less the the largest generating unit. L...

i x
  •  Voordeelbundel
  • Tentamen (uitwerkingen)
  •  • 23 pagina's • 
  • door EmilyCharlene • 
  • geupload  23-04-2024
Snel bekijken
i x

PJM Exam Questions and Answers

(0)
€11,90
0x  verkocht

PJM Exam Questions and Answers What is the threshold for having a satellite phone? - Correct Answer ️️ -500 MW How often is reactive testing completed? - Correct Answer ️️ -5 years Which of the following would NOT be a cause for a sudden deviation in the balancing area ACE? 1) Incorrect interchange number 2) Loss of a tie-line RTU 3) Loss of internal load 4) Loss of adjacent control area generation - Correct Answer ️️ -Loss of adjacent control area generation PJM should be ...

i x
  •  Voordeelbundel
  • Tentamen (uitwerkingen)
  •  • 16 pagina's • 
  • door EmilyCharlene • 
  • geupload  23-04-2024
Snel bekijken
i x