Samenvattingen, Aantekeningen en Examens

Op zoek naar een samenvatting over ? Op deze pagina vind je 68 samenvattingen over .

Alle 68 resultaten

Sorteer op

PJM Generation Dispatcher Exam Practice Questions and Answers
  • PJM Generation Dispatcher Exam Practice Questions and Answers

  • Tentamen (uitwerkingen) • 7 pagina's • 2024
  • PJM Generation Dispatcher Exam Practice Questions and Answers An EXCITER on a traditional generator does what? - Correct Answer ️️ -Voltage regulation (AVR) if you change the excitation current, you change the voltage. ECO Min, ECO Max, and EMERG Max are genrator _________________. - Correct Answer ️️ -Limits When synchronizing to the interconnection, what needs to be synchronized? - Correct Answer ️️ -Frequency, Voltage, and phase angle. GMD (GeoMagnetic Disturbance) procedu...
    (0)
  • €10,94
  • + meer info
PJM Exam Questions and Answers
  • PJM Exam Questions and Answers

  • Tentamen (uitwerkingen) • 16 pagina's • 2024
  • PJM Exam Questions and Answers What is the threshold for having a satellite phone? - Correct Answer ️️ -500 MW How often is reactive testing completed? - Correct Answer ️️ -5 years Which of the following would NOT be a cause for a sudden deviation in the balancing area ACE? 1) Incorrect interchange number 2) Loss of a tie-line RTU 3) Loss of internal load 4) Loss of adjacent control area generation - Correct Answer ️️ -Loss of adjacent control area generation PJM should be ...
    (0)
  • €11,90
  • + meer info
PJM Test Questions with 100% Correct Solutions
  • PJM Test Questions with 100% Correct Solutions

  • Tentamen (uitwerkingen) • 40 pagina's • 2024
  • PJM Test Questions with 100% Correct Solutions Which of the following balancing control modes is used by PJM under normal operations? - Correct Answer ️️ -Tie-Line Bias Which of the following influences does PJM consider when performing their system load forecast? - Correct Answer ️️ -Weather Conditions & Day of the Week All of the following are limits that must be submitted to PJM for generating units EXCEPT: 1. Eco Min 2. Eco Max 3. Emergency Max 4. Dynamic Instability - Corr...
    (0)
  • €12,85
  • + meer info
PJM Generator Exam Questions and Answers
  • PJM Generator Exam Questions and Answers

  • Tentamen (uitwerkingen) • 7 pagina's • 2024
  • PJM Generator Exam Questions and Answers The purpose of the Deploy All Resources Action is to instruct all generating resources to be on line and at full output _________ - Correct Answer ️️ -immediately upon receipt of dispatch instruction A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO. Generation Operators should: - Correct Answer ️️ -Ensure all unit voltage regulators are in service PJM can issue the Deploy All Resources Action for________ - Correct Answe...
    (0)
  • €10,94
  • + meer info
PJM Practice Exam 2024 Questions and Answers
  • PJM Practice Exam 2024 Questions and Answers

  • Tentamen (uitwerkingen) • 9 pagina's • 2024
  • PJM Practice Exam 2024 Questions and Answers Real time transmission constraints or contingencies may be alleviated with generators operating________. A. below 60 Hz. B. on a new price curve. C. on a new cost curve. D. off cost (out of merit). - Correct Answer ️️ -off cost (out of merit) What is the minimum size for a solar park to be required to have real and reactive power telemetry? A. 1 MW. B. 3 MW C. 5 MW D. 7 MW - Correct Answer ️️ -3 MW PJM calls for which of the following t...
    (0)
  • €11,90
  • + meer info
PJM Generation Operation Exam 2024 Questions and Answers
  • PJM Generation Operation Exam 2024 Questions and Answers

  • Tentamen (uitwerkingen) • 8 pagina's • 2024
    (0)
  • €11,90
  • + meer info
PJM Generation Dispatch Exam Questions and Answers
  • PJM Generation Dispatch Exam Questions and Answers

  • Tentamen (uitwerkingen) • 74 pagina's • 2024
  • PJM Generation Dispatch Exam Questions and Answers Which of the following statements is correct concerning PJM assuming frequency control of the restoration process? A) PJM assumes control once an external transmission tie has been established. B) Once an Area Control Error can be calculated, PJM will assume control. C) Whenever it becomes too much of a burden for any one Transmission Owner within the RTO D) Whenever the Transmission Owners within the RTO agree to let PJM control the pro...
    (0)
  • €12,85
  • + meer info
PJM Generation Dispatcher Sample Exam Questions and Answers
  • PJM Generation Dispatcher Sample Exam Questions and Answers

  • Tentamen (uitwerkingen) • 0 pagina's • 2024
  • PJM Generation Dispatcher Sample Exam Questions and Answers Real time transmission constraints or contingencies may be alleviated with generators operating : A. below 60 hertz B. on a new price curve C. on a new cost curve D. off cost ( out of merit) - Correct Answer ️️ -D. off cost ( out of merit ) Monitoring LMP may give insights into : A. system constraints B. system voltage C. system frefuency D. time error - Correct Answer ️️ -A. system constraints PJM calls for which o...
    (0)
  • €11,90
  • + meer info
PJM Sample Test Review 2024 Questions and Answers
  • PJM Sample Test Review 2024 Questions and Answers

  • Tentamen (uitwerkingen) • 17 pagina's • 2024
  • PJM Sample Test Review 2024 Questions and Answers Real time transmission constraints or contingencies may be alleviated with generators operating ______________ - Correct Answer ️️ -off cost out of merit. Monitoring ___________ may give insights into system constraints. - Correct Answer ️️ -Monitoring LMP's PJM calls for _____________ reserves to recover ace so that tie line schedules are maintained. - Correct Answer ️️ -PJM calls on synchronized reserves If not cancelled by...
    (0)
  • €11,90
  • + meer info