Bim research methods Samenvattingen, Aantekeningen en Examens

Op zoek naar een samenvatting over Bim research methods? Op deze pagina vind je 9 samenvattingen over Bim research methods.

Alle 9 resultaten

Sorteer op

Summary -  BIM Research Methods (BM06BIM) - GRADE 8.2 Populair
  • Summary - BIM Research Methods (BM06BIM) - GRADE 8.2

  • Samenvatting • 29 pagina's • 2023
  • Summary: BIM Research Methods RSM Erasmus University Rotterdam: BM06BIM This summary contains lectures for Session 1-6 for the end term of BRM 2023 taught by Dominik Gutt.
    (0)
  • €6,49
  • 7x verkocht
  • + meer info
BIM Research Methods (BM06BIM) 2021-2022 Summary FULL slides/notes
  • BIM Research Methods (BM06BIM) 2021-2022 Summary FULL slides/notes

  • Samenvatting • 55 pagina's • 2021
  • Ook in voordeelbundel
  • Contains everything from the BIM Research Methods course. No information is left out, and I've added extra notes next to some of the more complex topics. In short: all the relevant info made available in a singular file with all it's searchable content (ctrl+F). Post-exam, I added yellow stars next to topics covered in the examination.
    (9)
  • €4,49
  • 36x verkocht
  • + meer info
BIM Research Clinic (BMRM1BIM) 2021-2022 Summary FULL slides/notes
  • BIM Research Clinic (BMRM1BIM) 2021-2022 Summary FULL slides/notes

  • Samenvatting • 36 pagina's • 2022
  • Contains everything from the BIM Thesis Clinic (also called Research Methods II) course. Contains all PDF content, extra notes/colors, and some quiz questions & answers. In short: all the relevant info, condensed and made available in a singular file with all it's searchable content (ctrl+F).
    (0)
  • €2,99
  • 7x verkocht
  • + meer info
Test Bank For Construction Project Administration 10th Edition By Fisk
  • Test Bank For Construction Project Administration 10th Edition By Fisk

  • Tentamen (uitwerkingen) • 50 pagina's • 2023
  • CHAPTER 1 ANSWERS 1. Project time, cost, and quality 2. Professional Construction Manager (under direct contract with the Owner as the Owner’s representative) 3. Either the planning or the conceptual phase 4. Any of the listed alternatives 5. True (This usually means between the Resident Project Representative and the Contractor’s Superintendent or Project Manager at the site) 6. Working relationships among the parties through a mutually-developed, formal strategy of commitment and co...
    (0)
  • €24,83
  • + meer info
CCM Exam Study Guide – HPM 327 Questions with Verified Answers,100% CORRECT
  • CCM Exam Study Guide – HPM 327 Questions with Verified Answers,100% CORRECT

  • Tentamen (uitwerkingen) • 71 pagina's • 2024
  • CCM Exam Study Guide – HPM 327 Questions with Verified Answers What Is a pre-solicitation notice? - CORRECT ANSWER The pre-solicitation notice helps government agencies determine if there are qualified vendors to perform the work scope. It provides a "heads up" that the solicitation will be released and solicits capability responses from responsible vendors. The pre-solicitation notice also helps the government determine if the requirement can be set-aside for a small business if capable ...
    (0)
  • €12,30
  • + meer info
CCM Exam Study Guide – HPM 327 Questions with Verified Answers,100% CORRECT
  • CCM Exam Study Guide – HPM 327 Questions with Verified Answers,100% CORRECT

  • Tentamen (uitwerkingen) • 71 pagina's • 2024
  • CCM Exam Study Guide – HPM 327 Questions with Verified Answers What Is a pre-solicitation notice? - CORRECT ANSWER The pre-solicitation notice helps government agencies determine if there are qualified vendors to perform the work scope. It provides a "heads up" that the solicitation will be released and solicits capability responses from responsible vendors. The pre-solicitation notice also helps the government determine if the requirement can be set-aside for a small business if capable ...
    (0)
  • €12,30
  • + meer info
System Analysis and Design Chapter 1 and 2 Study Guide| QUESTIONS AND CORRECT ANSWERS |UPDATED
  • System Analysis and Design Chapter 1 and 2 Study Guide| QUESTIONS AND CORRECT ANSWERS |UPDATED

  • Tentamen (uitwerkingen) • 58 pagina's • 2024
  • • Question 1 Determining the means defining the specific boundaries, or extent, of a project. 1 out of 1 points Answers : a. project table b. project matrix c. project index d. project scope • Question 2 1 out of 1 points In a systems development life cycle (SDLC) model, the purpose of the is to create a physical model that will satisfy all documented requirements for the system. Answers : a. systems planning phase b. systems design phase ...
    (0)
  • €16,08
  • + meer info
D058 Health Literacy for the Client and Family  2024  Questions And Answers
  • D058 Health Literacy for the Client and Family 2024 Questions And Answers

  • Tentamen (uitwerkingen) • 40 pagina's • 2024
  • D058 Health Literacy for the Client and Family 2024 Assessment of one's ability to repeat and recall information; administered by a social worker - ANS BIMS BIMS, or the Brief Interview for Mental Status, is an assessment of one's ability to repeat and recall information; administered by a social worker. Assessment for determining alcohol addiction/dependence; may be self-administered or as part of a clinical interview - ANS CAGE The CAGE assessment for alcoholism is...
    (0)
  • €11,73
  • + meer info