Dmaic Samenvattingen, Aantekeningen en Examens

Op zoek naar een samenvatting over Dmaic? Op deze pagina vind je 505 samenvattingen over Dmaic.

Pagina 4 van de 505 resultaten

Sorteer op

Skoledo samenvatting Lean Six Sigma, Wat is Lean Six Sigma?
  • Skoledo samenvatting Lean Six Sigma, Wat is Lean Six Sigma?

  • Samenvatting • 11 pagina's • 2022
  • Ook in voordeelbundel
  • Lean Six Sigma is één van de populairste procesverbetermethoden van deze tijd. Maar wat is Lean Six Sigma en hoe is het ontstaan? Dit is dé samenvatting van de module 'Wat is Lean Six Sigma' uit de Lean Six Sigma Yellow Belt van Skoledo. Je leert wat Lean en Six Sigma is en kent de DMAIC-methode.
    (1)
  • €3,49
  • 1x verkocht
  • + meer info
CPHQ PRACTICE TEST 1 Q&A
  • CPHQ PRACTICE TEST 1 Q&A

  • Tentamen (uitwerkingen) • 15 pagina's • 2023
  • According to the Institute of Medicine which of the following is NOT one of the domains of quality care? a. Government regulation b. Customization c. Safety d. Interventions consistent with the latest medical change - Answer- a. government regulation Which of the following is NOT one of the types of quality problems identified by the Institute of Medicine's National Roundtable on Health Care Quality? a. Misuse b. Abuse c. Overuse d. Underuse - Answer- B. Abuse A doctor fails to ad...
    (0)
  • €11,82
  • + meer info
Six Sigma Green Belt-Value of Six Sigma (100% Verified)
  • Six Sigma Green Belt-Value of Six Sigma (100% Verified)

  • Tentamen (uitwerkingen) • 61 pagina's • 2023
  • What does DMAIC stand for correct answers Define, Measure, Analyze, Improve, Control Define correct answers Covers the project Charter, customer needs and requirements and process mapping measure correct answers describes how to identify the right thing to measure, how to create a plan to collect that data, and how to baseline the process analyze correct answers explain how to come up with a long list of possible root causes to a problem, narrow that list down to a short list and then ...
    (0)
  • €15,14
  • + meer info
IASSC Green Belt Questions and Answers Already Passed
  • IASSC Green Belt Questions and Answers Already Passed

  • Tentamen (uitwerkingen) • 18 pagina's • 2024
  • IASSC Green Belt Questions and Answers Already Passed Six Sigma equals to ____ 3.4 defects per million opportunities 3 Interpretations of Six Sigma are: 1. As a performance measure 2. As a problem solving methodology 3. As a management philosophy DMAIC stands for -Define - Identify the project objective and define the problem to be solved -Measure - Collect necessary data regarding the problem and establish current performance - Analyze - Use the data collected to analyze and scr...
    (0)
  • €9,46
  • + meer info
LSSGB - Introduction Phase (Grade:  80%) Rated A+
  • LSSGB - Introduction Phase (Grade: 80%) Rated A+

  • Tentamen (uitwerkingen) • 4 pagina's • 2024
  • LSSGB - Introduction Phase (Grade: 80%) Rated A+ Overview/Background of LEAN Taiicho Ohno developed LEAN in the 1940's for Toyota's production line. Known as TPS (Toyota Production System). Overview/Background of 6 SIGMA Bill Smith developed in the 1980's for Motorola. 1988: Malcom Bridge Quality Award 1990: Mikel Harry starts 6 SIGMA Academy The more variation in a system... the more likely the process will fail to meet the customers expectations. 8 Wastes (aka Muda) Defec...
    (0)
  • €8,51
  • + meer info
IASSC LSSGB EXAM QUESTIONS AND ANSWERS GRADED A 2024
  • IASSC LSSGB EXAM QUESTIONS AND ANSWERS GRADED A 2024

  • Tentamen (uitwerkingen) • 28 pagina's • 2024
  • If the chance that any one of five telephone lines is busy at any instant is 0.01, then what is the probability that all the lines are busy? A. (0.01)^4 B. (0.01)^5 C. (0.01)^6 D. (0.01)^10 - B. (0.01)^5 N = 5, p = 0.01, x = 5 Apply Standard formula for Binomial Distribution. Thus, option b is the correct answer. Who should complete the control phase after the successful completion and implementation of the first four phases of DMAIC? A. The green belt alone; the project has...
    (0)
  • €10,88
  • + meer info
CBIC CIC Practice Exam questions with correct answers
  • CBIC CIC Practice Exam questions with correct answers

  • Tentamen (uitwerkingen) • 17 pagina's • 2023
  • Medical intervention factors that affect risk of infection CORRECT ANSWER-indwelling devices, staffing ratio, lengths of stay, duration of invasive procedures, medications, # of exams by providers, type of institution, and knowledge/experience of providers environmental intervention factors that affect risk of infection CORRECT ANSWER-disinfectant type used, contact with animals, hand hygiene anatomical/phys factors that affect risk of infection CORRECT ANSWER-preexisting diseases, trauma,...
    (0)
  • €15,61
  • + meer info
Lean Six Sigma Green Belt (LSSGB)  Latest Update Rated A+
  • Lean Six Sigma Green Belt (LSSGB) Latest Update Rated A+

  • Tentamen (uitwerkingen) • 9 pagina's • 2024
  • Lean Six Sigma Green Belt (LSSGB) Latest Update Rated A+ The Journey of Quality Meanings of Six Sigma Benefits of Six Sigma -Eliminates the root cause. -Creates robust products and services. -Reduces process variation and waste. -Ensures customer satisfaction. -Achieves process standardization. -Reduces rework by getting it right the first time. -Addresses the key business requirement. -Helps gain competitive advantage. -Achieves the organizational goals. DMAIC Define M...
    (0)
  • €9,46
  • + meer info
6 Sigma Green Belt Certification Exam Review questions with correct answers
  • 6 Sigma Green Belt Certification Exam Review questions with correct answers

  • Tentamen (uitwerkingen) • 53 pagina's • 2023
  • ________ survey questions allow for quantitative analysis Correct Answer-closed ended Value stream maps help identify all of the following Correct Answer-sources of waste, bottlenecks, material & information flow, improvement opportunities The Fishbone diagram is part of the ________ phase of the Define, Measure, Analyze, Improve, and Control (DMAIC) cycle. Correct Answer-analyze When creating a control plan, you should consider which of the following items? Correct Answer-process maps,...
    (0)
  • €13,24
  • + meer info
Green Belt (A+ Graded)
  • Green Belt (A+ Graded)

  • Tentamen (uitwerkingen) • 75 pagina's • 2023
  • Which factor should be considered when selecting improvement projects? A. Order of project submittal B. The impact on the Human Resources department C. Alignment with business strategy and goals D. How success will be rewarded correct answers C. Alignment with business strategy and goals Which term describes the Six Sigma Methodology used for process improvement? A. Process Problem Improvement (PPI) B. Define, Measure, Analyze, Improve, Control (DMAIC) C. Process Quality Management...
    (0)
  • €14,66
  • + meer info