Elevator mechanic Study guides, Revision notes & Summaries

Looking for the best study guides, study notes and summaries about Elevator mechanic? On this page you'll find 918 study documents about Elevator mechanic.

Page 2 out of 918 results

Sort by

Elevator Mechanic Exam Review Elevator Mechanic  Study Questions with COMPLETE SOLUTIONS  (LATEST)
  • Elevator Mechanic Exam Review Elevator Mechanic Study Questions with COMPLETE SOLUTIONS (LATEST)

  • Exam (elaborations) • 126 pages • 2024
  • Elevator Mechanic Exam Review Elevator Mechanic Study Questions with COMPLETE SOLUTIONS (LATEST) If rigging gear is roped 3:1 and a BEAM CLAMP is used to lift a 6,000lb load. What is the beam capacity? - CORRECT ANSWER 18,000lbs. Beam capacity is cut in half with use of clamp, when rigging all blocks, rope, and clamps will be Equal to the lowest load rating What are the consequences of misaligned joints on a Rack and Pinion? - CORRECT ANSWER Broken Gear teeth. CWT derailment. Excess...
    (0)
  • $12.49
  • + learn more
Elevator Mechanic Exam Review Elevator Mechanic  Study Questions with COMPLETE SOLUTIONS  (LATEST)
  • Elevator Mechanic Exam Review Elevator Mechanic Study Questions with COMPLETE SOLUTIONS (LATEST)

  • Exam (elaborations) • 98 pages • 2024
  • Elevator Mechanic Exam Review Elevator Mechanic Study Questions with COMPLETE SOLUTIONS (LATEST) If rigging gear is roped 3:1 and a BEAM CLAMP is used to lift a 6,000lb load. What is the beam capacity? - CORRECT ANSWER 18,000lbs. Beam capacity is cut in half with use of clamp, when rigging all blocks, rope, and clamps will be Equal to the lowest load rating What are the consequences of misaligned joints on a Rack and Pinion? - CORRECT ANSWER Broken Gear teeth. CWT derailment. Excess...
    (0)
  • $12.49
  • + learn more
Elevator Mechanic Study Exam| 225 QUESTIONS| WITH COMPLETE ANSWERS
  • Elevator Mechanic Study Exam| 225 QUESTIONS| WITH COMPLETE ANSWERS

  • Exam (elaborations) • 22 pages • 2022
  • Available in package deal
  • ASME Correct Answer: American Society of Mechanical Engineers DOSH Correct Answer: Division of Occupational Safety and Health LADBS Correct Answer: Los Angeles Department of Building and Safety Alteration made to conveyance shall comply with ASME A17.1-204 Section Correct Answer: 8.7 The seismic section of ASME A17.1-2004 and alterations made to conveyances must also comply with this section Correct Answer: 8.4 What must be submitted to the applicable Division Elevator office...
    (0)
  • $12.49
  • 1x sold
  • + learn more
NEIEP 200 Final Exam Version 2 (Latest 2023/ 2024 Update) Questions and Verified Answers| 100% Correct| Grade A
  • NEIEP 200 Final Exam Version 2 (Latest 2023/ 2024 Update) Questions and Verified Answers| 100% Correct| Grade A

  • Exam (elaborations) • 22 pages • 2023
  • Available in package deal
  • NEIEP 200 Final Exam Version 2 (Latest 2023/ 2024 Update) Questions and Verified Answers| 100% Correct| Grade A Q: a mechanic attaches a chainfall to a hoisting beam with a beam clamp. what happens to the capacity of the hoisting beam? Answer: it is reduced to 50% of original capacity Q: you are rigging elevator equipment with a sling angle of 60 degrees. you are using a shouldered eye bolt with a tapped 1/2" diameter hole. once the shoulder is seated, what is the minimum threa...
    (1)
  • $10.99
  • 1x sold
  • + learn more
Elevator Mechanic Exam Review Questions and answers 2023 With Complete Solution Graded and Already Passed.
  • Elevator Mechanic Exam Review Questions and answers 2023 With Complete Solution Graded and Already Passed.

  • Exam (elaborations) • 11 pages • 2023
  • A contractor wants to raise the car speed from 100fpm to 125fpm, it currently has a 12" sheave. What sheave is required? - CORRECT ANS Diam=12" 12/4=3" 25fpm=3" 100fpm + 25fpm= 12"+3"= 15" sheave A MOV (Metal Oxide Varistor) burns out. You replace it, but cannot read voltage or resistance. What should you do? - CORRECT ANS Replace it with a larger MOV On a Ward-Leonard circuit the break is set, but the motor is trying to slip through the break. What is the issue? - CORRECT ANS Suici...
    (0)
  • $11.49
  • 2x sold
  • + learn more
Elevator Mechanic Exam Review Elevator Mechanic  Study Questions with COMPLETE SOLUTIONS  (LATEST)
  • Elevator Mechanic Exam Review Elevator Mechanic Study Questions with COMPLETE SOLUTIONS (LATEST)

  • Exam (elaborations) • 18 pages • 2024
  • Available in package deal
  • Elevator Mechanic Exam Review Elevator Mechanic Study Questions with COMPLETE SOLUTIONS (LATEST)
    (0)
  • $12.49
  • + learn more
Elevator Mechanic Exam Review Exam Study Questions with  COMPLETE SOLUTIONS (LATEST)
  • Elevator Mechanic Exam Review Exam Study Questions with COMPLETE SOLUTIONS (LATEST)

  • Exam (elaborations) • 80 pages • 2024
  • Available in package deal
  • Elevator Mechanic Exam Review Exam Study Questions with COMPLETE SOLUTIONS (LATEST) A Latching relay: Used for call registration,direction selection or as selector relays Two types are: Set/Rest are electrical and Mechanical Latching relays Need to know latching relay symbol, Its a box with shaded triangle in lower right hand corner. - CORRECT ANSWER Which relay do you need to Order 710 Pg, 7 RPM = 60 ∙ ƒ ÷ P÷2 = Step 1. 60 x Frequency (Hz.) = Step 2. Poles ÷ 2 = Take answe...
    (0)
  • $12.49
  • + learn more