Timber skeleton Samenvattingen, Aantekeningen en Examens

Op zoek naar een samenvatting over Timber skeleton? Op deze pagina vind je 2 samenvattingen over Timber skeleton.

Alle 2 resultaten

Sorteer op

BDCS - K-Plan - Questions & Answers Verified 100% Correct!
  • BDCS - K-Plan - Questions & Answers Verified 100% Correct!

  • Tentamen (uitwerkingen) • 8 pagina's • 2022
  • 1. If the roof and ceiling assembly of a structure has a factor of thermal conductance (U-factor) of 0.04, what should be the R-value of the insulation used in this same assembly? A. 2.5 B. 10 c. 25 D. 40 1. C. The answer is 25. The U-factor is the thermal conductance of one square foot of an entire assembly. The reciprocal of U is R, which is the thermal resistance of the same square foot of construction. A U-factor of 0.04, therefore, corresponds to an R-value of 1/0.04 = 25 (choice C). ...
    (0)
  • €12,42
  • + meer info
Light structures - assignment week 2 BT
  • Light structures - assignment week 2 BT

  • Overig • 6 pagina's • 2023
  • Ook in voordeelbundel
  • This document contains 6 drawings made for the second assignment of the Building Technology course. The given exercises were: Timber skeleton with timber lignatur floor, Precast concrete skeleton with timber joist floor, and Steel skeleton with slimline floor + detailed drawings for the connection between floor slab and column
    (0)
  • €2,99
  • + meer info