[Meer zien]What role can the Project Manager additionally undertake? - Change Authority 
Complete this statement: PRINCE2 recommends three __________to reflect the needs of the different 
levels of management involved in a project. - Levels of plans 
The PRINCE2 principle 'continued business justification' s...
Voorbeeld 2 van de 6 pagina's
In winkelwagenWhat role can the Project Manager additionally undertake? - Change Authority 
Complete this statement: PRINCE2 recommends three __________to reflect the needs of the different 
levels of management involved in a project. - Levels of plans 
The PRINCE2 principle 'continued business justification' s...
Which is one of the four integrated elements within 
PRINCE2? 
a) Quality 
b) Role descriptions 
c) Processes 
d) Product descriptions - Answer c) Processes 
Identify the missing word in the following sentence. 
A purpose of the [ ? ] theme is to control any 
unacceptable deviations from the project...
Voorbeeld 4 van de 117 pagina's
In winkelwagenWhich is one of the four integrated elements within 
PRINCE2? 
a) Quality 
b) Role descriptions 
c) Processes 
d) Product descriptions - Answer c) Processes 
Identify the missing word in the following sentence. 
A purpose of the [ ? ] theme is to control any 
unacceptable deviations from the project...
According to PRINCE2, which are the six aspects of project performance to be managed? - Time, 
cost, scope, quality, benefits, risk 
According to PRINCE2, which of the following is a characteristic of a project compared to that of 
business operations? - Introduces business change 
Identify the miss...
Voorbeeld 2 van de 7 pagina's
In winkelwagenAccording to PRINCE2, which are the six aspects of project performance to be managed? - Time, 
cost, scope, quality, benefits, risk 
According to PRINCE2, which of the following is a characteristic of a project compared to that of 
business operations? - Introduces business change 
Identify the miss...
Variables to control / manage - Cost, Scope, Time, Benefits, Risk Quality (CST BRQ) 
List the 5 characteristics of a PRINCE2 project? - Change 
Unique 
Cross-functional 
Uncertainty 
Temporary 
(CUCUT) 
What are the "Integrated elements" of PRINCE2? - Principles 
Themes 
Processes 
Tailoring (PTPT...
Voorbeeld 4 van de 35 pagina's
In winkelwagenVariables to control / manage - Cost, Scope, Time, Benefits, Risk Quality (CST BRQ) 
List the 5 characteristics of a PRINCE2 project? - Change 
Unique 
Cross-functional 
Uncertainty 
Temporary 
(CUCUT) 
What are the "Integrated elements" of PRINCE2? - Principles 
Themes 
Processes 
Tailoring (PTPT...
The purpose of which plan is to provide a schedule for measuring the achievement of benefits? 
A - Benefits Review Plan 
B - Exception Plan 
C - Project Plan 
D - Initiation stage Plan - Answer A 
Which of the following is not part of the Closing a Project process ? 
A - Prepare planned closure 
B -...
Voorbeeld 3 van de 18 pagina's
In winkelwagenThe purpose of which plan is to provide a schedule for measuring the achievement of benefits? 
A - Benefits Review Plan 
B - Exception Plan 
C - Project Plan 
D - Initiation stage Plan - Answer A 
Which of the following is not part of the Closing a Project process ? 
A - Prepare planned closure 
B -...
OV - 6 aspects of project performance to be manage - 1.Costs 
2.TimeScale 
3.Quality 
4.Scope 
5.Risk 
6.Benefits 
OV - 5 characteristics of a project - 1.Change 
2.Temporary 
3.Cross functional 
4.Unique 
5.Uncertainty 
OV - 4 integrated elements on which Prince2 is based - iples 
s 
sses 
 project...
Voorbeeld 3 van de 25 pagina's
In winkelwagenOV - 6 aspects of project performance to be manage - 1.Costs 
2.TimeScale 
3.Quality 
4.Scope 
5.Risk 
6.Benefits 
OV - 5 characteristics of a project - 1.Change 
2.Temporary 
3.Cross functional 
4.Unique 
5.Uncertainty 
OV - 4 integrated elements on which Prince2 is based - iples 
s 
sses 
 project...
Project characteristics - 1. Change 
2. Temporary 
3. Cross-functional 
4. Unique 
5. Uncertainty 
Six variables involved in a project - 1. Costs 
2. Timescales 
3. Quality 
4. Scope 
5. Risk 
6. Benefits 
Four integrated elements -1. Principles 
2. Themes 
3. Processes 
4. Tailoring PRINCE2 to the ...
Voorbeeld 2 van de 6 pagina's
In winkelwagenProject characteristics - 1. Change 
2. Temporary 
3. Cross-functional 
4. Unique 
5. Uncertainty 
Six variables involved in a project - 1. Costs 
2. Timescales 
3. Quality 
4. Scope 
5. Risk 
6. Benefits 
Four integrated elements -1. Principles 
2. Themes 
3. Processes 
4. Tailoring PRINCE2 to the ...
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper PatrickKaylian. Stuvia faciliteert de betaling aan de verkoper.
Nee, je koopt alleen deze samenvatting voor €17,56. Je zit daarna nergens aan vast.
4,6 sterren op Google & Trustpilot (+1000 reviews)
Afgelopen 30 dagen zijn er 90042 samenvattingen verkocht
Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen