Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about ? On this page you'll find 42 study documents about .

Page 3 out of 42 results

Sort by

ACQ 1010 MODULE 1 SYSTEMS ACQUISITION MANAGEMENT OVERVIEW QUESTIONS WITH 100% CORRECT ANSWERS
  • ACQ 1010 MODULE 1 SYSTEMS ACQUISITION MANAGEMENT OVERVIEW QUESTIONS WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 7 pages • 2023
  • System Acquisition Management CORRECT ANSWER is the process used to acquire quality products which must satisfy the needs of operational users, provide measureable improvements in mission capabilities, and acquired in a timely manner at a fair and reasonable cost. Acquisition Laws CORRECT ANSWER Title 10 of the United States Code governs the organization. structure, and operation of the Armed Forces of the United States National Defense Authorization Act (NDAA) CORRECT ANSWER Is one of the...
    (0)
  • $7.99
  • + learn more
ACQ EXAM 1 QUESTIONS WITH CORRECT ANSWERS
  • ACQ EXAM 1 QUESTIONS WITH CORRECT ANSWERS

  • Exam (elaborations) • 8 pages • 2023
  • What is the last activity in the Life Cycle process CORRECT ANSWER Disposal What are the responsibilities of the DACM CORRECT ANSWER 1. Establish and monitor training requirements and DAWIA compliance 2. Certifies Dawia standards have been met What are the 3 Risk factors CORRECT ANSWER Cost, Performance, Schedule What is required for an Acquisition CORRECT ANSWER An Approved need Systems Engineering is responsible for CORRECT ANSWER integration throughout the entire life cycle Wha...
    (0)
  • $8.99
  • + learn more
ACQ 1300 Fundamentals of Technology Security/Transfer Full Text with 100% Correct Answers
  • ACQ 1300 Fundamentals of Technology Security/Transfer Full Text with 100% Correct Answers

  • Exam (elaborations) • 10 pages • 2022
  • ACQ 1300 Fundamentals of Technology Security/Transfer Full Text with 100% Correct Answers
    (0)
  • $13.99
  • + learn more
ACQ 1300 Fundamentals of Technology Security/Transfer
  • ACQ 1300 Fundamentals of Technology Security/Transfer

  • Exam (elaborations) • 9 pages • 2022
  • ACQ 1300 Fundamentals of Technology Security/Transfer What is technology security? ACQ 1300 Fundamentals of Technology Security/Transfer Exam 1 The total effort to safeguard information and technology in an international acquisition program What key activity must be accomplished as part of effective security planning in an international acquisition program? Documenting how the information/technology will be protected What type of international acquisition program is managed by the Defe...
    (0)
  • $9.49
  • + learn more
Module 3 Exam|ACQ 202:Part I QUESTIONS AND ANSWERS ALL CORRECT
  • Module 3 Exam|ACQ 202:Part I QUESTIONS AND ANSWERS ALL CORRECT

  • Exam (elaborations) • 2 pages • 2022
  • Which of the following is something you should NOT do during negoiations? Correct Answer: Established action items or issue inquiries if the contractor doesn't answer. The concept of _____________ is used to address the interplay between system performance, availability (reliability, maintainability, and supportability), process efficiency, and system life cycle cost. Correct Answer: Affordable System Operational Effectiveness (ASOE). Tracking Technical Performance Measures on high-ri...
    (0)
  • $2.99
  • + learn more
ACQ 202 QUESTIONS AND ANSWERS ALL CORRECT
  • ACQ 202 QUESTIONS AND ANSWERS ALL CORRECT

  • Exam (elaborations) • 4 pages • 2022
  • There are four basic techniques used by the DoD for creating cost estimates: Analogy, Parametric, and Actual Costs are three techniques. Correct Answer: Engineering Which appropriation category would fund the design of new equipment, material, or software? Correct Answer: Research, Development, Test and Evaluation What's the primary purpose of an Analysis of Alternatives (AoA)? Correct Answer: Provide decision-making aid in selecting a cost-effective material alternative When compari...
    (0)
  • $5.49
  • + learn more
Module Exam:ACQ 202|Fielding and Supporting the System QUESTIONS AND ANSWERS
  • Module Exam:ACQ 202|Fielding and Supporting the System QUESTIONS AND ANSWERS

  • Exam (elaborations) • 2 pages • 2022
  • Taking a contractual dispute to court should be the first step in attempting to resolve controversy between the disputing parties. Correct Answer: False Which core ethical value are you violating if you reject an opposing point of view during a disagreement and call it a shortsighted, uninformed way to look at the situation? Correct Answer: Respect What is the purpose of fielding/deployment planning? Correct Answer: To provide for a smooth introduction of the system to the user. Which of ...
    (0)
  • $3.07
  • + learn more
Module 4 Exam: Part 1|ACQ 202|QUESTIONS AND ANSWERS | GRADED A
  • Module 4 Exam: Part 1|ACQ 202|QUESTIONS AND ANSWERS | GRADED A

  • Exam (elaborations) • 8 pages • 2022
  • A configuration management program should focus on ensuring designs are traceable to capability needs, developmental changes are controlled and documented, interfaces are well-defined and understood, and _______________________________. Correct Answer: All product documentation is consistent with its supporting information. Which technical review is held during the Technology Maturation and Risk Reduction phase to ascertain progress in defining system technical requirements? Correct Answe...
    (0)
  • $5.99
  • + learn more
Module 4 Part 2|ACQ 202|QUESTIONS AND ANSWERS ALL CORRECT
  • Module 4 Part 2|ACQ 202|QUESTIONS AND ANSWERS ALL CORRECT

  • Exam (elaborations) • 3 pages • 2022
  • to minimize current and future funding risks program management offices use __________ to project and track obligations and expenditures Correct Answer: spending plans The Earned Value Management (EVM) ___________ reveals how much it will cost to complete the program based on current program status. Correct Answer: Not BCWP An over-target baseline (OTB) is a comprehensive rebaselining effort that is best categorized as an internal replanning effort. Correct Answer: FALSE Which of the fol...
    (0)
  • $3.99
  • + learn more
Module 4 Exam|ACQ 202|Part I Developing the System Q/A GRADED
  • Module 4 Exam|ACQ 202|Part I Developing the System Q/A GRADED

  • Exam (elaborations) • 4 pages • 2022
  • A program manager should normally look for opportunities to integrate developmental testing (DT) and operational testing (OT) in order to save time and money. Correct Answer: -*True* -False Program cost increases and schedules slips are most likely caused by __________________, changes to the design, and changes to the production processes. Correct Answer: -Changes to the number of systems ordered -Robust and accurate configuration management -Well-defined and documented technical data p...
    (0)
  • $3.99
  • + learn more