- Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about ? On this page you'll find 184 study documents about .

All 184 results

Sort by

FINAL ESTIMATES LEVEL 2 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS
  • FINAL ESTIMATES LEVEL 2 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS

  • Exam (elaborations) • 16 pages • 2025
  • Available in package deal
  • FINAL ESTIMATES LEVEL 2 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS On multi FIN project numbers under one contract, the Asphalt is reported on the certification, by the CONTRACTOR, under what Project FIN Number? - Answer -The Contractor shows the Asphalt on the lead FIN project number A roadway is being constructed and has a Subsoil Excavation Quantity of 835 CY, a Regular Excavation Quantity of 250 CY and an embankment Quantity of 1040 CY. Based upon this information, th...
    (0)
  • $11.99
  • + learn more
FDOT FINAL ESTIMATES - LEVEL 1 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS
  • FDOT FINAL ESTIMATES - LEVEL 1 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS

  • Exam (elaborations) • 11 pages • 2025
  • Available in package deal
  • FDOT FINAL ESTIMATES - LEVEL 1 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS What two types of Estimates are needed to pay for the work performed by contractors? - Answer -Final & Progress Monthly In case of discrepancies among the contract documents, which document takes the highest precedence? - Answer -Special Provisions Contractors Recieve progress payments on the basis of? - Answer -Monthly Progress EstimatesNeed assistance on Online classes, Exams & Assignments? Reach...
    (0)
  • $11.99
  • + learn more
FINAL ESTIMATES LEVEL 1 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS
  • FINAL ESTIMATES LEVEL 1 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS

  • Exam (elaborations) • 39 pages • 2025
  • Available in package deal
  • FINAL ESTIMATES LEVEL 1 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS T/F: A major function of the DOT is to carry out Construction and Reconstruction programs to provide the public with adequate transportation service. - Answer -True For DOT management of construction and reconstruction projects includes the following specific responsibilities: A. Planning, Programming, and Design B. Contract Administrations C. Contractor Payments D. Design and Contract Management E. All...
    (0)
  • $12.49
  • + learn more
ELECTRICAL ESTIMATING 1-2 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS
  • ELECTRICAL ESTIMATING 1-2 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS

  • Exam (elaborations) • 10 pages • 2025
  • Available in package deal
  • ELECTRICAL ESTIMATING 1-2 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS Overhead costs represent between _______ percent of an electrical contractor's total sales. - Answer -20 and 40 Suppliers seldom acknowledge it, but they offer different prices to different contractors for the same material. - Answer -True When possible, try not to bid jobs that have more than _______ competitors. - Answer -fourNeed assistance on Online classes, Exams & Assignments? Reach out for in...
    (0)
  • $11.99
  • + learn more
FINAL ESTIMATES LEVEL 2 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS
  • FINAL ESTIMATES LEVEL 2 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS

  • Exam (elaborations) • 16 pages • 2025
  • Available in package deal
  • FINAL ESTIMATES LEVEL 2 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS On multi FIN project numbers under one contract, the Asphalt is reported on the certification, by the CONTRACTOR, under what Project FIN Number? - Answer -The Contractor shows the Asphalt on the lead FIN project number A roadway is being constructed and has a Subsoil Excavation Quantity of 835 CY, a Regular Excavation Quantity of 250 CY and an embankment Quantity of 1040 CY. Based upon this information, th...
    (0)
  • $12.49
  • + learn more
CTQP FINAL ESTIMATES LEVEL 1 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS
  • CTQP FINAL ESTIMATES LEVEL 1 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS

  • Exam (elaborations) • 18 pages • 2025
  • Available in package deal
  • CTQP FINAL ESTIMATES LEVEL 1 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS 1) A major function of the DOT is to carry out Construction and Reconstruction programs to provide the public with adequate transportation service. - Answer -True For the DOT, the management of Construction and reconstruction projects involves the following specific responsibilities: A. Planning, Programming and design B. Contract administration C. Contractor payments D. Design and Contract Managem...
    (0)
  • $12.49
  • + learn more
FDOT FINAL ESTIMATES - LEVEL 1 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS
  • FDOT FINAL ESTIMATES - LEVEL 1 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS

  • Exam (elaborations) • 11 pages • 2025
  • Available in package deal
  • FDOT FINAL ESTIMATES - LEVEL 1 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS What two types of Estimates are needed to pay for the work performed by contractors? - Answer -Final & Progress Monthly In case of discrepancies among the contract documents, which document takes the highest precedence? - Answer -Special Provisions Contractors Recieve progress payments on the basis of? - Answer -Monthly Progress EstimatesNeed assistance on Online classes, Exams & Assignments? Reach...
    (0)
  • $12.49
  • + learn more
FINAL ESTIMATES LEVEL 1 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS
  • FINAL ESTIMATES LEVEL 1 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS

  • Exam (elaborations) • 39 pages • 2025
  • Available in package deal
  • FINAL ESTIMATES LEVEL 1 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS T/F: A major function of the DOT is to carry out Construction and Reconstruction programs to provide the public with adequate transportation service. - Answer -True For DOT management of construction and reconstruction projects includes the following specific responsibilities: A. Planning, Programming, and Design B. Contract Administrations C. Contractor Payments D. Design and Contract Management E. All...
    (0)
  • $12.99
  • + learn more
ELECTRICAL ESTIMATING 1-2 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS
  • ELECTRICAL ESTIMATING 1-2 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS

  • Exam (elaborations) • 10 pages • 2025
  • Available in package deal
  • ELECTRICAL ESTIMATING 1-2 EXAM ACTUAL 2025/2026 QUESTIONS AND 100% CORRECT ANSWERS Overhead costs represent between _______ percent of an electrical contractor's total sales. - Answer -20 and 40 Suppliers seldom acknowledge it, but they offer different prices to different contractors for the same material. - Answer -True When possible, try not to bid jobs that have more than _______ competitors. - Answer -fourNeed assistance on Online classes, Exams & Assignments? Reach out for in...
    (0)
  • $12.49
  • + learn more
FINAL ESTIMATES EXAM QUESTIONS AND CORRECT ANSWERS
  • FINAL ESTIMATES EXAM QUESTIONS AND CORRECT ANSWERS

  • Exam (elaborations) • 16 pages • 2025
  • FINAL ESTIMATES EXAM QUESTIONS AND CORRECT ANSWERS "Perhaps the most important item considered at the estimate review is ____. - Correct Answer the amount of fee to include in the bid price" "While an experienced estimator will certainly know what to look for and assess when investigating the site, the presence of the ____ or a project superintendent on the visit will always be valuable if only to offer alternative viewpoints in the evaluation of the data obtained. - Correct Answe...
    (0)
  • $12.99
  • + learn more