FINAL ESTIMATES LEVEL 1 EXAM QUESTIONS AND CORRECT DETAILED ANSWERS.

Document preview thumbnail
Preview 3 out of 26 pages

FINAL ESTIMATES LEVEL 1 EXAM QUESTIONS AND CORRECT DETAILED ANSWERS.

Content preview

Page 1 of 26




FINAL ESTIMATES LEVEL 1 EXAM QUESTIONS
AND CORRECT DETAILED ANSWERS
>> T/F: A major function of the DOT is to carry out Construction and Reconstruction programs to
provide the public with adequate transportation service.
- correct answer- True



>> For DOT management of construction and reconstruction projects includes the following
specific responsibilities:

A. Planning, Programming, and Design

B. Contract Administrations

C. Contractor Payments

D. Design and Contract Management

E. All of the above
- correct answer- E. All of the above



>> T/F: To pay for work performed by contractors, progress and Final Estimates are needed?
- correct answer- True



>> Which of the following is not officially considered a "Contract Document"?

A. Supplemental Agreements and Work Orders

B. Notebooks and Estimates Procedure Manual.

C. Standard Specifications.

D .Construction Manual.

E. Answers B & D.
- correct answer- E. Answers B & D.

, Page 2 of 26



>> Between printings of the Standard Specifications, what does the Department publish to
identify and describe changes in the Specifications?

A. CPAM

B. Supplemental Specifications

C. Work Orders

D. Specification Changes
- correct answer- B. Supplemental Specifications



>> Select the correct sequence of documents in order of precedence, with the document
highest in authority listed first.

A. Contract Plans, Development Specifications, Standard Specifications, Special Provisions,
Technical Special Provisions, Supplemental Specifications, Design Standards.

B. Design Standards, Special Provisions, Technical Special Provisions, Supplemental
Specifications, Contract Plans, development Specifications, Standard Specifications.

C. Special Provisions, Technical Special Provisions, Contract Plans, Design Standards,
Development Specifications, Supplemental Specifications, Standard Specifications.

D. Supplemental Specifications, Special Provisions, Contract Plans, Development Specifications,
Standards Specifications, Technical Special Provisions, Design Standards.

E. None of the above.
- correct answer- C. Special Provisions, Technical Special Provisions, Contract Plans, Design
Standards, Development Specifications, Supplemental Specifications, Standard Specifications.



>> True or False. When checked and verified, final estimates serve as the basis for Final
Payment.
- correct answer- True



>> Which of the following sets for the Department's methods and Procedures for preparing and
checking final estimates?

, Page 3 of 26



A. Construction Inspection Mathematics

B. Project Engineer

C. Preparation and Documentation Manual

D. CPAM
- correct answer- C. Preparation and Documentation Manual



>> Please match the appropriate documentation name with the correct description below:

A. [Final Plans]: For reviewing contract time charges before clearing estimates for final payment;
[Computation Books]: Documents pertinent changes during construction and show the "as-
built' condition; [Field Books]: Contains alignment notes and cross section notes, etc.

B. [Construction Diaries]: For reviewing contract time charges before clearing estimates for final
payment; [Final Plans]: Documents pertinent changes during construction and show the "as-
built' conditions; [Field Books]: Contains alignment notes and cross section notes, etc.

C. [Final Plans]: For reviewing contract time charges before clearing estimates for final payment;
[Tabulation Forms]: Documents pertinent changes during construction and show the "as-built'
conditions; [Field Books]: Contains alignment notes and cross section notes, etc.

D. [Final Plans]: For r
- correct answer- B. [Construction Diaries]: For reviewing contract time charges before clearing
estimates for final payment; [Final Plans]: Documents pertinent changes during construction
and show the "as-built' conditions; [Field Books]: Contains alignment notes and cross section
notes, etc.



>> When using calculators or computers, you should use the:


A. Rules of rounding described in CONSTRUCTION MATH.

B. Full decimal capabilities of the machine

C. CPAM as a guide to rounding

D. Machine only as a backup to your manual computations

Document information

Uploaded on
July 31, 2025
Number of pages
26
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.29

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
1
Followers
0
Items
398
Last sold
7 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions