• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

Final Estimates Level 2| Exam Questions Solved 100% Correct | Verified Solutions

Document preview thumbnail
Preview 2 out of 9 pages

Final Estimates Level 2| Exam Questions Solved 100% Correct | Verified Solutions

Content preview

Final Estimates Level 2| Exam Questions Solved
100% Correct | Verified Solutions

Why is it important to run a progress estimate soon after Final Acceptance? - ✔✔So
the estimate can be paid through EED quickly to prevent interest.


On Financial Project No.000101-1-52-01, which is a conventional project, the notice to
proceed is dated December 1, 2015 and the contract time is to start 16 days after the
Notice to Proceed per the contract. The Contractor begins work on December 18, 2015
and the project is Final Accepted on December 31, 2015. There are no added weather or
other reasons. What is the 1st chargeable day and how many total days should be
recorded in the Contract Time File? - ✔✔12/17/2015 with 15 chargeable days.


On Lump Sum Contracts, upon Final Acceptance, the Project Administrator will send? -
✔✔The Offer of Final Payment



Field Records for multiple jobs, same contract, should be kept? - ✔✔In seperate Field
Books & In seperate files within Project Solve and EDMS


On Lump Sum Project, A Superpave Asphalt Course item requires a Composite Pay
Factor (CPF) adjustment. What is the total dollar adjustment amount?
Lot 1 with 2000 Tons and a CPF of 0.99
Lot 2 with 4000 Tons and CPF of 0.99
Lot 3 with 4000 Tons and CPF of 1.00

Lot 4 with 4000 Tons and a CPF of 1.00 - ✔✔$5425.20


Under the current Specifications for Lump Sum Projects, the Project Administrator will
approve and pay the Final Estimate? - ✔✔False

, Original Terrain line sections: - ✔✔A)Represent the terrain prior to Contruction
B) Are necessary to establish earthwork quantities
C) Must be shown on cross sections.
ALL OF THE ABOVE


The plans show the designer calculations for Clearing & Grubbing with a total of 3.2
Acres to be cleared and grubbed. During the Construction, a plan error was encountered
which required the clearing and grubbing of an additional 800 SY. This required an
adjustment to the original Lump Sum Pay Item. Calculate the adjusted Final Pay
Quantity. The secondary unit is in Acres not SY. Note 1 Acre= 4840 SY:
Pay Item= Clearing and grubbing

Original Quantity = 1.0 Lump Sum - ✔✔3.2 Ac x 4840 SY= 15488 SY
15488 + 800 SY = 16288 SY
16288 SY/15488 SY = 1.052 Lump Sum



The Prime Contractor is required to certify previous payments for? - ✔✔1st tier
Subcontractors and Suppliers



Borrow Excavation is paid for as a? - ✔✔Final Measurement


When should Liquidated Damages be reflected on a progress estimate? -
✔✔(**Begins after Contract time runs out up to the estimate cut off date. Liquidated
Damages are withheld monthly.)
ON SUBSEQUENT PROGRESS REPORTS


Final Measurements are to be documented on which of the following? -
✔✔A)Miscellaneous Forms

Document information

Uploaded on
January 13, 2025
Number of pages
9
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
QUINTER
3.6
(73)
Sold
420
Followers
105
Items
39867
Last sold
2 weeks ago


Reviews from verified buyers




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions