100% ACCURATE ANSWERS LATEST UPDATE 2025/26 100% PASS
GRADED A+
Which of the following emergency procedures are issued in
advance of a scheduled load period to allow sufficient time for
the generation dispatcher to prepare for the anticipated capacity
shortages? - --ANSWERS----Alerts
The amount of synchronized reserves must be large enough to
cover the loss of - --ANSWERS----The largest single
contingency
PJM responds to capacity shortages by issuing alerts - --
ANSWERS----In advance of a scheduled load period to allow
sufficient time for members to prepare for anticipated initial
capacity shortages.
During black start restoration, priority access to cranking power
to given to - --ANSWERS----Hot units that can return to service
immediately
Severe cold weather conditions require which of the following to
be staffed, started, and available for loading? - --ANSWERS----
Combustion turbines and diesels
During system restoration, a generator should not be loaded
above the level of available - --ANSWERS----Dynamic reserve
The minimum passing score for a unit regulation test is - --
ANSWERS----75% compliance with the test signal
, A capacity resource that intends to be eligible to set real-time
LMP MUST: - --ANSWERS----Be modeled in the PJM EMS
Which of the following PJM systems are used to report unit
outages? - --ANSWERS----edart, Markets Gateway, and egads
Which of the following units is subject to offer capping? - --
ANSWERS----A unit running for transmission congestion
Edart is used for all of the following EXCEPT: - --ANSWERS----
LMP information
Which of the following generating units would be eligible to set
LMP? - --ANSWERS----A unit dispatched for constraint control
A tie line with MW flowing into the PJM control area trips. The
system operator will see which of the following occur? - --
ANSWERS----ACE and frequency will remain the same
A Minimum Generation Emergency Alert is initiated when - --
ANSWERS----Expected generation is within 2500MW of normal
minimum energy limits
The primary purpose of a Maximum Generation Emergency Alert
is to - --ANSWERS----Provide an early alert system conditions
may require PJM emergency procedures
A combustion turbine has 26 burn hours at maximum capacity.
How should this be offered into the Energy Market? - --
ANSWERS----Normally