Leed ap bdc exam 2024 Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Leed ap bdc exam 2024? On this page you'll find 12 study documents about Leed ap bdc exam 2024.

All 12 results

Sort by

LEED BD+C AP EXAM 2024 WITH 100% CORRECT ANSWERS
  • LEED BD+C AP EXAM 2024 WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 36 pages • 2024
  • (MR Credit) Building Product Disclosure and Optimization- Environmental Product Declarations - Opt. 2 Multi-Attribute Optimization. Exemplary Performance requirements? - correct answer Option 1. Source at least 40 qualifying products from five manufacturers. Option 2. Purchase 75%, by cost, of permanently installed building products that meet the required attributes What must be true of EPDs to qualify for MR Credit Building Product Disclosure and Optimization EPD? - correct answer EPDs must...
    (0)
  • $16.49
  • + learn more
LEED AP BD+C PRACTICE EXAM 2024 WITH 100% CORRECT ANSWERS
  • LEED AP BD+C PRACTICE EXAM 2024 WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 34 pages • 2024
  • what are the 8 LEED AP BD+C adaptations? - correct answer New Construction and Major Renovations Core and Shell Development Schools Retail Data Centers Warehouses and Dist. Centers Hoslitality Healthcare what are the 8 LEED AP BD+C adaptations? - correct answer New Construction and Major Renovations Core and Shell Development Schools Retail Data Centers Warehouses and Dist. Centers Hospitality Healthcare
    (0)
  • $13.49
  • + learn more
LEED AP BD+C  EXAM 2024 WITH 100% CORRECT ANSWERS
  • LEED AP BD+C EXAM 2024 WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 28 pages • 2024
  • What must your erosion control plan adhere to?Answer - Erosion control plans must adhere to the 2003 EPA Construction General Permit (or local standards, whichever is more stringent). What is a Phase I Environmental Site Assessment?Answer - A Phase I Environmental Site Assessment is a report prepared for a real estate holding that identifies potential or existing environmental contamination liabilities. How is a Phase II Environmental Site Assessment more in depth?Answer - A Phase II En...
    (0)
  • $16.49
  • + learn more
LEED AP BD+C V4: LEED PROCESS (IP) EXAM 2024 WITH 100% CORRECT ANSWERS
  • LEED AP BD+C V4: LEED PROCESS (IP) EXAM 2024 WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 21 pages • 2024
  • The LEED reviewer response from a preliminary review indicates a project will be 1 point short of LEED Platinum. What should the project team do if they still want to pursue LEED Platinum? A. Exclude 10% of the gross floor area to try to improve the project's energy performance B. Install extra bicycle racks to earn exemplary performance for LT Credit Bicycle Facilities C. Submit new or revised documentation for credits that were denied or require more information, or attempt additional cr...
    (0)
  • $14.49
  • + learn more
LEED V4 AP BD+C PRACTICE TEST #1 EXAM 2024 WITH 100% CORRECT ANSWERS
  • LEED V4 AP BD+C PRACTICE TEST #1 EXAM 2024 WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 43 pages • 2024
  • A project's total site area is 280,000 SF (26,000 m2). The total previously developed area on site is 100,000 SF (9,290 m2). The building FAR is 1.7. How much financial support would an owner have to provide to ear SS credit Site Development - Protect or Restore Habitat? A) $112,000 B) $72,000 C) $122,400 D) $40,000 - correct answer A) $112,000 *Feedback:* This type of question will likely include additional, extraneous information to cause confusion. For Option 2 Financial Support,...
    (0)
  • $15.49
  • + learn more
LEED AP BD+C  EXAM 2024 WITH 100% CORRECT ANSWERS
  • LEED AP BD+C EXAM 2024 WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 28 pages • 2024
  • What must your erosion control plan adhere to?Answer - Erosion control plans must adhere to the 2003 EPA Construction General Permit (or local standards, whichever is more stringent). What is a Phase I Environmental Site Assessment?Answer - A Phase I Environmental Site Assessment is a report prepared for a real estate holding that identifies potential or existing environmental contamination liabilities. How is a Phase II Environmental Site Assessment more in depth?Answer - A Phase II En...
    (0)
  • $16.49
  • + learn more
LEED AP BD+C  EXAM 2024 WITH 100% CORRECT ANSWERS
  • LEED AP BD+C EXAM 2024 WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 11 pages • 2024
  • As of August 2015, ___% of all square footage pursuing LEED certification is outside of the U.S. - correct answer 43% There are no eligibility requirements for taking the LEED ___ exam. - correct answer Green Associate LEED ___ is the credential that designates the most exceptional professionals in the green building industry. - correct answer Fellow To be nominated as a LEED Fellow, nominees must have held a LEED professional credential for ___ or more years. - correct answer 8 A re...
    (0)
  • $16.49
  • + learn more
LEED AP BD+C v4 EXAM 2024 WITH 100% CORRECT ANSWERS
  • LEED AP BD+C v4 EXAM 2024 WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 12 pages • 2024
  • What does the acronym "LEED" stand for? - correct answer Leadership in Energy and Environmental Design What does the acronym "GBCI" stand for? - correct answer Green Business Certification Inc. Buildings are __________ and people are __________ - correct answer certified; credentialed What are the knowledge domains? - correct answer 1. LEED Process, 2. Integrative Strategies, 3. Location and Transportation, 4. Sustainable Sites, 5. Water Efficiency, 6. Energy and Atmosphere, 7. Mate...
    (0)
  • $16.49
  • + learn more
LEED AP BD+C STUDY EXAM 1 2024 WITH 100% CORRECT ANSWERS
  • LEED AP BD+C STUDY EXAM 1 2024 WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 13 pages • 2024
  • Which of the following factors influence the recycling efforts within buildings? A) Lack of education B) Non-availability of recycling programs in town C) ignorance about recycling D) lack of convenient, physical spaces for recycling - correct answer D) lack of convenient, physical spaces for recycling A project team for a school project will reuse the shell of an existing building and recycle the rest of the construction and demolition debris. Which of the following MR credits will thi...
    (0)
  • $15.49
  • + learn more
LEED AP BD+C Exam 2024 |Questions and 100% Correct Verified Answers| Latest Update
  • LEED AP BD+C Exam 2024 |Questions and 100% Correct Verified Answers| Latest Update

  • Exam (elaborations) • 29 pages • 2024
  • The project ________ process is designed to allow project teams to obtain technical guidance on how LEED requirements, including MPRs, prererqs and credits pertain to their projects. - ANSWER credit interpretation ruling process 3.15 ________ are precedent setting official answers to formal technical inquiries about implementing LEED on a project. - ANSWER LEED interpretations - are published to USGBC 3.16 ___________ incorporate changes and improvements to LEED rating systems and referen...
    (0)
  • $13.49
  • + learn more