LEED V4 AP BD+C PRACTICE TEST #1 EXAM 2024 WITH 100% CORRECT ANSWERS
A project's total site area is 280,000 SF (26,000 m2). The total previously developed area on site is 100,000 SF (9,290 m2). The building FAR is 1.7. How much financial support would an owner have to provide to ear SS credit Site Development - Protect or Restore Habitat? A) $112,000 B) $72,000 C) $122,400 D) $40,000 - correct answer A) $112,000 *Feedback:* This type of question will likely include additional, extraneous information to cause confusion. For Option 2 Financial Support, the requirement is as follows: $0.40/SF ($4/m2) for the total site area including the building footprint. 280,000 X $0.40 = $112,000 *#* Which *non-mandatory* steps could a project team take prior to conducting air-quality testing that would *improve* the test results for EQ Credit IAQ Assessment? (Choose 2) A) Vacuu
Written for
- Institution
- LEED V4 AP BD+C
- Course
- LEED V4 AP BD+C
Document information
- Uploaded on
- March 1, 2024
- Number of pages
- 43
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
leed v4 ap bdc practice test 1 exam 2024 with 10
-
leed v4 ap bdc practice test 1 exam