Ba 120 Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Ba 120? On this page you'll find 200 study documents about Ba 120.
Page 4 out of 200 results
Sort by
-
NERC SOS quiz Questions and Answers (Already GRADED A)
- Exam (elaborations) • 60 pages • 2023
- Available in package deal
-
- $11.49
- + learn more
If a Balancing Authority does not comply with the Control Performance Standard, the Balancing Authority is not permitted to provide which of the following for any other Balancing Authority entities? 
Regulation of other services related to control performance 
 
 
1. It is the obligation of each Balancing Authority to fulfill its commitment to the Interconnection and not ________ the other balancing Authorities in the Interconnection 
Burden 
 
 
A Balancing Authority is performing Overlap Regul...
-
NERC SOS QUIZ QUESTIONS WITH 100% CORRECT ANSWERS.
- Exam (elaborations) • 46 pages • 2023
-
- $14.49
- + learn more
If a Balancing Authority does not comply with the Control Performance Standard, the Balancing Authority is not permitted to provide which of the following for any other Balancing Authority entities? 
Regulation of other services related to control performance 
 
 
 
1. It is the obligation of each Balancing Authority to fulfill its commitment to the Interconnection and not ________ the other balancing Authorities in the Interconnection 
Burden 
 
 
 
A Balancing Authority is performing Overlap R...
-
NERC Prep Test Questions with 100% Correct Solutions| Rated A+
- Exam (elaborations) • 9 pages • 2023
- Available in package deal
-
- $11.99
- + learn more
How much load reduction to change frequency - 6-10% Load reduction = 1HZ Frequency change same direction 
 
Largest Load block to pick up during sys resto - 5% of online generation 
 
Ratio of Voltage change to load change - 5% change in Voltage=3% change in load (distribution only) 
 
Power Losses on Line - I squared * R 
 
DOE Reporting Conditions - 300 MW uncontrolled loss of load 
100MW Firm load shed 
50,000 customers out of power greater than 1 hr 
3% Voltage reduction 
Publ...
-
SOLUTION MANUAL FOR Business Mathematics In Canada
- Exam (elaborations) • 762 pages • 2024
-
- $39.59
- + learn more
SOLUTION MANUAL FOR Business Mathematics In 
Canada 
11th Edition By F. Ernest Jerome 
CHAPTER 1 Review and Applications of Basic Mathematics 
Appendix 1A: The Texas Instruments BA II PLUS 
CHAPTER 2 Review and Applications of Algebra 
CHAPTER 3 Percent and Percent Change 
CHAPTER 4 Ratios and Proportions 
CHAPTER 5 Mathematics of Merchandising 
5.2 Supplement: Other Notations for Terms of Payment (on Connect) 
5.3 Supplement: Diagram Model for Markup Problems (on Connect) 
CHAPTER 6 Applicatio...
-
Microeconomics 2nd Edition By Goolsbee - Test Bank
- Exam (elaborations) • 778 pages • 2023
-
- $22.61
- 1x sold
- + learn more
1. 
Which of the following is a key assumption of the supply and demand model? 
A) 
that the price and quantity sold are determined in a single market 
B) 
that the prices and quantities sold are simultaneously determined in all markets 
C) 
the way the whole economy achieves equilibrium 
D) 
that international markets affect domestic markets, which in turn affect local markets 
 
 
2. 
A key assumption of the supply and demand model is that: 
A) 
each firm's good is unique and cannot be duplic...
Get paid weekly? You can!
-
NERC Additional Test Questions With Correct Answers
- Exam (elaborations) • 21 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
1. Balancing Authority A is importing MW and has a tie-Iine flowing into them when the meter fails to zero. Which of the following statements is true? 
A) The Balancing Authority's frequency will drop 
B) The Balancing Authority's generators on AGC will decrease output 
C) The Balancing Authority's frequency will increase 
D) The Balancing Authority's ACE reading will decrease - Answer B) The Balancing Authority's generators on AGC will decrease output 
 
2. Balancing Authority A has tie-li...
-
SOLUTION MANUAL FOR Business Mathematics In Canada
- Exam (elaborations) • 762 pages • 2024
-
- $35.49
- + learn more
SOLUTION MANUAL FOR Business Mathematics In 
Canada 
11th Edition By F. Ernest Jerome 
CHAPTER 1 Review and Applications of Basic Mathematics 
Appendix 1A: The Texas Instruments BA II PLUS 
CHAPTER 2 Review and Applications of Algebra 
CHAPTER 3 Percent and Percent Change 
CHAPTER 4 Ratios and Proportions 
CHAPTER 5 Mathematics of Merchandising 
5.2 Supplement: Other Notations for Terms of Payment (on Connect) 
5.3 Supplement: Diagram Model for Markup Problems (on Connect) 
CHAPTER 6 Applicatio...
-
nerc ba test Questions and Correct Answers
- Exam (elaborations) • 35 pages • 2024
-
- $12.49
- + learn more
nerc ba test Questions and Correct Answers 
 
What is the purpose in accounting for Inadvertent Interchange among the Balancing Authorities? - Correct Answer: To ensure that Balancing Authorities do not excessively depend on other Balancing Authority Areas for meeting their demand or Interchange obligations. 
 
In your Interconnection, a generator tripped that was large enough to reduce the frequency from 60.00 Hz to 59.94 Hz. Your Balancing Authority's Frequency Bias is 200 MW/0.1 Hz. How many...
-
NERC SOS Pre-Assessment Questions With Answers Latest Updated 2024 (GRADED)
- Exam (elaborations) • 8 pages • 2024
-
- $16.49
- + learn more
NERC SOS Pre-Assessment Questions With Answers Latest Updated 2024 (GRADED) What are three primary AGC control models? - Answer :Tie-Line Bias, 
Constant Frequency, Constant Net Interchange 
Quiz :When a balancing Authority's ACE is zero, what is true? - Answer :The 
BA load-interchange-generation balancing while supporting Interconnection 
Frequency 
Quiz :In a 3-phase AC generator... - Answer :Each phase is physically offset by 
120 degrees 
Quiz :Inductance is a property of an electric circu...
-
NERC PREP TEST 101 QUESTIONS AND ANSWERS (100% CORRECT SOLUTIONS)
- Exam (elaborations) • 73 pages • 2023
- Available in package deal
-
- $11.49
- + learn more
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? 
 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system 
a. Generator MVAR output would increase 
 
 
2. When system conditions are such that emergency procedures are expected to be implemented, which of the fo...
That summary you just bought made someone very happy. Also get paid weekly? Sell your study resources on Stuvia! Discover all about earning on Stuvia