Contractor Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Contractor? On this page you'll find 19502 study documents about Contractor.

Page 2 out of 19.502 results

Sort by

CSLB B LICENSE GENERAL CONTRACTOR EXAM BANK
  • CSLB B LICENSE GENERAL CONTRACTOR EXAM BANK

  • Exam (elaborations) • 30 pages • 2023
  • CSLB B LICENSE GENERAL CONTRACTOR EXAM BANK If unused mortar stiffens due to hydration of cement, what must you do? What minimum time must you wait before caulking or grouting new tiles? How long should you wait before installing tile on a shower pan? Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: If 65 street lights are fed by a 2275 volt series circui...
    (0)
  • $9.49
  • 1x sold
  • + learn more
Utah Contractor Exam (Real)Questions + Answers Graded A+
  • Utah Contractor Exam (Real)Questions + Answers Graded A+

  • Exam (elaborations) • 132 pages • 2024
  • Available in package deal
  • Depreciation is taken on which of the company's assets? a. Loans b. Current assets c. Fixed assets d. None of the above - Answer-C ... Explanation: Depreciation is counted from fixed assets. A private employer who employs __ or more people as of July 1, 2010, may not hire a new employee unless the employer is registered with and uses a status verification system such as E -Verify to verify the federal legal working status of any new employee. a. 5 b. 10 c. 15 d. 1 - Answer-C ... Expl...
    (0)
  • $7.99
  • 1x sold
  • + learn more
Contractor's License Exam Questions  and Answers 100% Pass
  • Contractor's License Exam Questions and Answers 100% Pass

  • Exam (elaborations) • 34 pages • 2024
  • Available in package deal
  • Contractor's License Exam Questions and Answers 100% Pass Attachments to structural members The edges of lugs brackets, rivets and bolt heads attached to structural members shall be permitted to extend to within 1 inch of the surface of the fire protection Parapet construction The height of the parapet shall not be less than 30 inches above the point where the roof surface and the wall intersect. Combustible framing in fire walls Adjacent combustible members entering into a concret...
    (0)
  • $10.99
  • 1x sold
  • + learn more
California State Contractors License Law and Business Test Study Guide Newest Updated Questions and Answers (2024 / 2025) (Verified Answers)
  • California State Contractors License Law and Business Test Study Guide Newest Updated Questions and Answers (2024 / 2025) (Verified Answers)

  • Exam (elaborations) • 26 pages • 2023
  • California State Contractors License Law and Business Test Study Guide Newest Updated Questions and Answers (2024 / 2025) (Verified Answers)
    (0)
  • $12.99
  • 3x sold
  • + learn more
BNSF Roadway Worker Protection Contractor Safety and Security Training Quiz Questions with Correct Solutions, A+
  • BNSF Roadway Worker Protection Contractor Safety and Security Training Quiz Questions with Correct Solutions, A+

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • 1. Roadway Worker Protection training - C. Must be renewed annually. 2. The cardinal rule of railroading is: - B. Always expect a train or equipment to move on any track in either direction at any time. 3. "Fouling" the track means being within __ feet of the field side of the nearest rail. - A. 4 4. According to the FRA, when working in the foul: - B. A person or equipment could be struck by a train or on-track equipment. 5. The following are roadway workers. - A. C...
    (1)
  • $14.99
  • 3x sold
  • + learn more
VA Contractors: VA Advanced (Class A) Exam Questions and Answers
  • VA Contractors: VA Advanced (Class A) Exam Questions and Answers

  • Exam (elaborations) • 5 pages • 2023
  • Available in package deal
  • VA Contractors: VA Advanced (Class A) Exam Questions and Answers A lump sum contract on a project has a total contract price of $160,000. Retainage has been held back at 10%. The contractor has received progress payments for 75% of the project. The contractor submits a request for final payment for the new completed project. The final payment amount should be for... - ANS ️️ More than $50,000 What is the total value of current assets for an accrual basis company that has the followin...
    (1)
  • $10.49
  • 2x sold
  • + learn more
Virginia Contractor's Exam Questions  and Answers 100% Pass
  • Virginia Contractor's Exam Questions and Answers 100% Pass

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • Virginia Contractor's Exam Questions and Answers 100% Pass What is the MAXIMUM penalty for a contractor who undertakes work without the proper class of license? $500 fine per day for each day of violation plus penalties for a misdemeanor. What is the PRIMARY purpose of licensing? Protect the health and welfare of the public. The application for licensure MUST include the business address of the proposed designated employee. All of the following must be licensed EXCEPT a materia...
    (0)
  • $9.99
  • 1x sold
  • + learn more
VA Contractors: VA Advanced (Class A) 2024 Questions with 100% Correct Answers
  • VA Contractors: VA Advanced (Class A) 2024 Questions with 100% Correct Answers

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • A lump sum contract on a project has a total contract price of $160,000. Retainage has been held back at 10%. The contractor has received progress payments for 75% of the project. The contractor submits a request for final payment for the new completed project. The final payment amount should be for... - More than $50,000 What is the total value of current assets for an accrual basis company that has the following? Checking account cash balance is $4,800; materials inventory for work-in-pro...
    (1)
  • $7.99
  • 1x sold
  • + learn more
Virginia Contractor's Exam (Class A or B) Practice and VA General (Class A or B) Practice
  • Virginia Contractor's Exam (Class A or B) Practice and VA General (Class A or B) Practice

  • Exam (elaborations) • 7 pages • 2024
  • Available in package deal
  • What is the MAXIMUM penalty for a contractor who undertakes work without the proper class of license? - $500 fine per day for each day of violation plus penalties for a misdemeanor. What is the PRIMARY purpose of licensing? - Protect the health and welfare of the public. The application for licensure MUST include - the business address of the proposed designated employee. All of the following must be licensed EXCEPT - a material supplier who advises a contractor. When a claimant is paid fu...
    (0)
  • $7.99
  • 1x sold
  • + learn more