![PJM Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+](/docpics/5106970/662aa71cc38d7_5106970_121_171.jpeg)
-
PJM Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 27 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
During reactive testing, which entity must give approval to change an approved voltage 
schedule? 
PJM, TOP, MOC, GO 
: TO 
Generation available within 10 minutes for offline reserve units: 
Quick-start (hydro), manual, operating, supplemental 
: Quick-start (hydro) 
Minimum MVARs for an individual generator that is required to do reactive testing? 
: 20 MVA 
Minimum MVARs for an aggregate of generators that is required to do reactive testing? 
: 75 MVA 
Power transformer is connected to the g...
![PJM Generation Operation Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+](/docpics/5106949/662aa6a6cb0b9_5106949_121_171.jpeg)
-
PJM Generation Operation Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
Control center facilities must have a minimum of how many days of fuel for the backup 
generator? 
: 5 days 
If PJM ACE shows overgeneration, actual imports are: 
: Less than scheduled 
Who should a generator contact at PJM to clear an outage ticket? 
: Master Coordinator 
To correct for a slow or fast clock, system frequency schedules are offset by: 
: +/-.02 Hz 
What frequency would PJM set to correct for fast-time error? 
: 59.98Hz 
2 | P a g e 
What frequency would PJM set to correct for sl...
![PJM Transmission Exam Study Questions & Correct Answers | Latest Update |Already Graded A+PJM Transmission Exam Study Questions & Correct Answers | Latest Update |Already Graded A+](/docpics/5172596/663384bd262d2_5172596_121_171.jpeg)
-
PJM Transmission Exam Study Questions & Correct Answers | Latest Update |Already Graded A+PJM Transmission Exam Study Questions & Correct Answers | Latest Update |Already Graded A+
- Exam (elaborations) • 46 pages • 2024
-
- $13.29
- + learn more
During System Restoration, what is the optimal Frequency Range? 
: 59.75 - 61 Hz 
The 500 kV system has normal bus voltages between? 
: 500 to 550 kV 
When Connecting 2 islands, the operator must match? 
: Voltage, Phase Angle and Frequency 
What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) 
: 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV 
When will PJM issue a Minimum Generation Alert? (how many MW under normal 
operating limits) 
...
![PJM Sample Test Review | 150 Questions with 100% Correct Answers | Verified](/docpics/4699537/65eb64471496c_4699537_121_171.jpeg)
-
PJM Sample Test Review | 150 Questions with 100% Correct Answers | Verified
- Exam (elaborations) • 15 pages • 2024
-
- $12.99
- + learn more
PJM Sample Test Review | 150 Questions with 100% Correct Answers | Verified | Latest Update 2024 
Real time transmission constraints or contingencies may be alleviated with generators operating ______________ ANS-off cost out of merit. 
 
Monitoring ___________ may give insights into system constraints. ANS-Monitoring LMP's 
 
PJM calls for _____________ reserves to recover ace so that tie line schedules are maintained. ANS-PJM calls on synchronized reserves 
 
If not cancelled by PJM, the mini...
![PJM Practice Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+](/docpics/5106958/662aa6e8074d2_5106958_121_171.jpeg)
-
PJM Practice Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
Real time transmission constraints or contingencies may be alleviated with generators 
operating________. A. below 60 Hz. B. on a new price curve. C. on a new cost curve. 
D. off cost (out of merit). 
: off cost (out of merit) 
What is the minimum size for a solar park to be required to have real and reactive 
power 
telemetry? A. 1 MW. B. 3 MW C. 5 MW D. 7 MW 
: 3 MW 
PJM calls for which of the following to recover the ACE so that tie line schedules are 
maintained? A. instantaneous reserve...
![PJM Generator Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+](/docpics/5106904/662aa5c5ae6a3_5106904_121_171.jpeg)
-
PJM Generator Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
The purpose of the Deploy All Resources Action is to instruct all generating resources to 
be on line and at full output _________ 
: immediately upon receipt of dispatch instruction 
A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO. 
Generation Operators should: 
: Ensure all unit voltage regulators are in service 
PJM can issue the Deploy All Resources Action for________ 
: the entire RTO, specific Control Zones or a subset of a Control Zone if 
transmission limitations ...
![PJM Generator Exam 2024 with 100% correct answers](/docpics/4248032/65a6ef94b3789_4248032_121_171.jpeg)
-
PJM Generator Exam 2024 with 100% correct answers
- Exam (elaborations) • 6 pages • 2024
- Available in package deal
-
- $16.49
- + learn more
PJM Generation Operation Exam 2024 with 100% correct answers
![PJM Generation Dispatcher Sample Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+](/docpics/5106916/662aa5ef09135_5106916_121_171.jpeg)
-
PJM Generation Dispatcher Sample Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 15 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
Real time transmission constraints or contingencies may be alleviated with generators 
operating : 
A. below 60 hertz 
B. on a new price curve 
C. on a new cost curve 
D. off cost ( out of merit) 
: D. off cost ( out of merit ) 
Monitoring LMP may give insights into : 
A. system constraints 
B. system voltage 
C. system frefuency 
D. time error 
: A. system constraints 
2 | P a g e 
PJM calls for which of the following to recover the ACE so that tie line schedules are 
maintained ? 
A. IRC ( i...
![PJM Practice Exam 2019 Questions & Answers](/docpics/4135842/6595d0869e62b_4135842_121_171.jpeg)
-
PJM Practice Exam 2019 Questions & Answers
- Exam (elaborations) • 6 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
PJM Practice Exam 2019 Questions & Answers 
 
 
Real time transmission constraints or contingencies may be alleviated with generators operating________. A. below 60 Hz. B. on a new price curve. C. on a new cost curve. D. off cost (out of merit). - ANSWER-off cost (out of merit) 
 
What is the minimum size for a solar park to be required to have real and reactive power 
telemetry? A. 1 MW. B. 3 MW C. 5 MW D. 7 MW - ANSWER-3 MW 
 
PJM calls for which of the following to recover the ACE so that ti...
![PjM - 2024 Exam| with Questions and Complete Solutions](/docpics/5100613/6629e0c067623_5100613_121_171.jpeg)
-
PjM - 2024 Exam| with Questions and Complete Solutions
- Exam (elaborations) • 30 pages • 2024
-
- $12.89
- + learn more
During System Restoration, what is the optimal Frequency Range? - 59.75 - 61 Hz 
The 500 kV system has normal bus voltages between? - 500 to 550 kV 
When Connecting 2 islands, the operator must match? - Voltage, Phase Angle and 
Frequency 
What are the Minimum Source Requirements-(500kV+) for a 500 kV? - 30 MW Gen/mile of 
energized 500 kV and 20 MW Load/mile of energized 500 kV