PJM

PJM

Here are the best resources to pass PJM. Find PJM study guides, notes, assignments, and much more.

Page 4 out of 73 results

Sort by

PJM Exam | Questions & 100% Correct  Answers (Verified) | Latest Update | Grade A+
  • PJM Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+

  • Exam (elaborations) • 27 pages • 2024
  • Available in package deal
  • During reactive testing, which entity must give approval to change an approved voltage schedule? PJM, TOP, MOC, GO : TO Generation available within 10 minutes for offline reserve units: Quick-start (hydro), manual, operating, supplemental : Quick-start (hydro) Minimum MVARs for an individual generator that is required to do reactive testing? : 20 MVA Minimum MVARs for an aggregate of generators that is required to do reactive testing? : 75 MVA Power transformer is connected to the g...
    (0)
  • $12.49
  • + learn more
PJM Generation Operation Exam | Questions &  100% Correct Answers (Verified) | Latest  Update | Grade A+
  • PJM Generation Operation Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • Control center facilities must have a minimum of how many days of fuel for the backup generator? : 5 days If PJM ACE shows overgeneration, actual imports are: : Less than scheduled Who should a generator contact at PJM to clear an outage ticket? : Master Coordinator To correct for a slow or fast clock, system frequency schedules are offset by: : +/-.02 Hz What frequency would PJM set to correct for fast-time error? : 59.98Hz 2 | P a g e What frequency would PJM set to correct for sl...
    (0)
  • $9.99
  • + learn more
PJM Transmission Exam Study Questions &  Correct Answers | Latest Update |Already  Graded A+PJM Transmission Exam Study Questions &  Correct Answers | Latest Update |Already  Graded A+
  • PJM Transmission Exam Study Questions & Correct Answers | Latest Update |Already Graded A+PJM Transmission Exam Study Questions & Correct Answers | Latest Update |Already Graded A+

  • Exam (elaborations) • 46 pages • 2024
  • During System Restoration, what is the optimal Frequency Range? : 59.75 - 61 Hz The 500 kV system has normal bus voltages between? : 500 to 550 kV When Connecting 2 islands, the operator must match? : Voltage, Phase Angle and Frequency What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) : 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV When will PJM issue a Minimum Generation Alert? (how many MW under normal operating limits) ...
    (0)
  • $13.29
  • + learn more
PJM Sample Test Review | 150 Questions with 100% Correct Answers | Verified
  • PJM Sample Test Review | 150 Questions with 100% Correct Answers | Verified

  • Exam (elaborations) • 15 pages • 2024
  • PJM Sample Test Review | 150 Questions with 100% Correct Answers | Verified | Latest Update 2024 Real time transmission constraints or contingencies may be alleviated with generators operating ______________ ANS-off cost out of merit. Monitoring ___________ may give insights into system constraints. ANS-Monitoring LMP's PJM calls for _____________ reserves to recover ace so that tie line schedules are maintained. ANS-PJM calls on synchronized reserves If not cancelled by PJM, the mini...
    (0)
  • $12.99
  • + learn more
PJM Practice Exam | Questions & 100%  Correct Answers (Verified) | Latest Update |  Grade A+
  • PJM Practice Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • Real time transmission constraints or contingencies may be alleviated with generators operating________. A. below 60 Hz. B. on a new price curve. C. on a new cost curve. D. off cost (out of merit). : off cost (out of merit) What is the minimum size for a solar park to be required to have real and reactive power telemetry? A. 1 MW. B. 3 MW C. 5 MW D. 7 MW : 3 MW PJM calls for which of the following to recover the ACE so that tie line schedules are maintained? A. instantaneous reserve...
    (0)
  • $9.99
  • + learn more
PJM Generator Exam | Questions & 100%  Correct Answers (Verified) | Latest Update |  Grade A+
  • PJM Generator Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • The purpose of the Deploy All Resources Action is to instruct all generating resources to be on line and at full output _________ : immediately upon receipt of dispatch instruction A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO. Generation Operators should: : Ensure all unit voltage regulators are in service PJM can issue the Deploy All Resources Action for________ : the entire RTO, specific Control Zones or a subset of a Control Zone if transmission limitations ...
    (0)
  • $9.99
  • + learn more
PJM Generator Exam 2024 with 100% correct answers
  • PJM Generator Exam 2024 with 100% correct answers

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • PJM Generation Operation Exam 2024 with 100% correct answers
    (0)
  • $16.49
  • + learn more
PJM Generation Dispatcher Sample Exam |  Questions & 100% Correct Answers (Verified) |  Latest Update | Grade A+
  • PJM Generation Dispatcher Sample Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • Real time transmission constraints or contingencies may be alleviated with generators operating : A. below 60 hertz B. on a new price curve C. on a new cost curve D. off cost ( out of merit) : D. off cost ( out of merit ) Monitoring LMP may give insights into : A. system constraints B. system voltage C. system frefuency D. time error : A. system constraints 2 | P a g e PJM calls for which of the following to recover the ACE so that tie line schedules are maintained ? A. IRC ( i...
    (0)
  • $10.49
  • + learn more
PJM Practice Exam 2019 Questions & Answers
  • PJM Practice Exam 2019 Questions & Answers

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • PJM Practice Exam 2019 Questions & Answers Real time transmission constraints or contingencies may be alleviated with generators operating________. A. below 60 Hz. B. on a new price curve. C. on a new cost curve. D. off cost (out of merit). - ANSWER-off cost (out of merit) What is the minimum size for a solar park to be required to have real and reactive power telemetry? A. 1 MW. B. 3 MW C. 5 MW D. 7 MW - ANSWER-3 MW PJM calls for which of the following to recover the ACE so that ti...
    (0)
  • $7.99
  • + learn more
PjM - 2024 Exam| with Questions and Complete Solutions
  • PjM - 2024 Exam| with Questions and Complete Solutions

  • Exam (elaborations) • 30 pages • 2024
  • During System Restoration, what is the optimal Frequency Range? - 59.75 - 61 Hz The 500 kV system has normal bus voltages between? - 500 to 550 kV When Connecting 2 islands, the operator must match? - Voltage, Phase Angle and Frequency What are the Minimum Source Requirements-(500kV+) for a 500 kV? - 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV
    (0)
  • $12.89
  • + learn more