Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 15 pages
Exam (elaborations)

PJM Sample Test Review | 150 Questions with 100% Correct Answers | Verified

Document preview thumbnail
Preview 2 out of 15 pages

PJM Sample Test Review | 150 Questions with 100% Correct Answers | Verified | Latest Update 2024 Real time transmission constraints or contingencies may be alleviated with generators operating ______________ ANS-off cost out of merit. Monitoring ___________ may give insights into system constraints. ANS-Monitoring LMP's PJM calls for _____________ reserves to recover ace so that tie line schedules are maintained. ANS-PJM calls on synchronized reserves If not cancelled by PJM, the minimum generation alert expires at the end of the specified ______________. ANS-light load period When PJM declares a hot weather alert, the generation dispatcher should determine if maintenance can be deferred and notify all generating stations and key personnel. ANS- During system restoration, the two categories of reserves are dynamic and spinning. ANS- During system restoration, frequency should be maintained between 59.75 and 61.00 Hertz. ANS- PJM issues a heavy load voltage schedule. Member companies who own generation facilities should ensure voltage regulators on generating units are in service & automatic. ANS- A unit being dispatched economically by PJM should set its megawatt output based on the unit's dispatch rate or desired megawatt level. ANS- A fossil steam unit is considered fuel limited when it is not capable of running at its maximum capacity for the next 72 hours ANS- During system restoration prior to synchronization of a unit, the dispatcher should ensure sufficient load is available to stabilize unit operation. ANS- A large unit in an external control area near PJM/PJM West trips. The PJM operator will see ace remain the same, frequency decrease. ANS- LMPs will change when marginal generator output changes ANS- The two control signals sent by the PJM E M S are regulation and dispatch rate (desired MW output). ANS- An all-call is the one-way communication system used to disseminate information to market operation centers. ANS- Real time bus prices may be monitored using data viewer. ANS- Not offer


Document information

Uploaded on
March 8, 2024
Number of pages
15
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
111
Followers
82
Items
2228
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.