COSC
COSC
Here are the best resources to pass COSC. Find COSC study guides, notes, assignments, and much more.
Page 4 out of 532 results
Sort by:
-
Exam (elaborations)
COSC 2436 Final Exam Review UPDATED ACTUAL Exam Questions and CORRECT Answers
-
--41December 20242024/2025A+Available in bundle
- COSC 2436 Final Exam Review UPDATED 
ACTUAL Exam Questions and CORRECT 
Answers 
Which one of the following are considered to be a benefit of using ADT Bag in Data Structure 
A. Simplified API 
B. Flexibility in element Type 
C. All of the above 
D. Dynamic Size - CORRECT ANSWER - All of the abov
-
$11.99 More Info
MGRADES
-
Exam (elaborations)
COSC 175 – Construction Print Reading | Exam 2 Q&A (100+ Questions) – Site Plans, Foundations, HVAC, Electrical
-
--12December 20252025/2026A+Available in bundle
- This document contains over 100 expertly answered and fully verified questions from Exam 2 of the COSC 175 2025/2026 course, focusing on advanced construction print reading and applied systems. The material spans essential construction components including site plans (plot plans, setbacks, benchmarks, contour lines), floor plans, foundation systems, and detailed building sections. 
 
Topics also include reinforcement techniques (rebar, welded wire fabric, slab-on-grade), types of foundation (cai...
-
$15.99 More Info
NinjaNerd
-
Exam (elaborations)
COSC Final Exam Questions and Answers
-
--9December 20252025/2026A+Available in bundle
- COSC Final Exam Questions and Answers
-
$10.99 More Info
Bensuda
-
Exam (elaborations)
COSC 153 EXAM 1 QUESTIONS AND ANSWERS
-
--9December 20252025/2026A+Available in bundle
- COSC 153 EXAM 1 QUESTIONS AND ANSWERS
-
$10.99 More Info
Bensuda
-
Exam (elaborations)
COSC Final Exam UPDATED Exam Questions and CORRECT Answers
-
---21December 20242024/2025A+
- COSC Final Exam UPDATED Exam 
Questions and CORRECT Answers 
Which would not be used to create a LAN? - CORRECT ANSWER - Monitor 
Which of the following can be most likely the difference between gamer and non-gamer's hard 
drives? - CORRECT ANSWER - RADI0
-
$11.49 More Info
MGRADES
-
Exam (elaborations)
COSC 2436 Final Exam UPDATED ACTUAL Exam Questions and CORRECT Answers
-
--21December 20242024/2025A+Available in bundle
- COSC 2436 Final Exam UPDATED 
ACTUAL Exam Questions and CORRECT 
Answers 
True and False statement: 
Algorithm upheap restores the heap-order property by swapping k along an upward path from the 
insertion node. - CORRECT ANSWER - tru
-
$10.99 More Info
MGRADES
-
Exam (elaborations)
COSC 275 Final Exam Palmer UPDATED ACTUAL Exam Questions and CORRECT Answers
-
--12February 20252024/2025A+Available in bundle
- COSC 275 Final Exam Palmer UPDATED 
ACTUAL Exam Questions and CORRECT 
Answers 
#3 Rebar - CORRECT ANSWER - Area- 0.11 
LB/LF- 0.376 
Diameter- 0.375" 
#4 Rebar - CORRECT ANSWER - Area- 0.20
-
$10.99 More Info
MGRADES
-
Exam (elaborations)
COSC 275 Exam 1 || A+ Guaranteed.
-
--9December 20252025/2026A+Available in bundle
- COSC 275 Exam 1 || A+ Guaranteed.
-
$11.79 More Info
SirAnton
-
Exam (elaborations)
COSC 475 – Construction Project Management | Exam 2 Q&A (100+ Questions) – Resource Leveling, Productivity, S-Curves
-
--11December 20252025/2026A+Available in bundle
- This document provides over 100 in-depth and professionally verified questions and answers from Exam 2 of the COSC 475 2025/2026 course on Construction Project Management. The material focuses on advanced scheduling strategies, resource management, and productivity optimization across multiple concurrent construction projects. Topics include resource allocation, resource leveling, manpower-loaded schedules, workspace constraints, and coordination of subcontractor labor across sites. 
 
It also e...
-
$15.99 More Info
NinjaNerd
-
Exam (elaborations)
Cosc 475 Final ACTUAL UPDATED Exam Questions and CORRECT Answers
-
--11April 20252024/2025A+Available in bundle
- Cosc 475 Final ACTUAL UPDATED Exam 
Questions and CORRECT Answers 
crtical path - CORRECT ANSWER - the longest continuous chain of activities through the 
network schedule that establishes the minimum overall project durations. 
Critical Path Characteristics - CORRECT ANSWER -must have a start and end date -path is continuous through to the end of the schedule -Convergence: activities have more than one predecessor -Divergence: activities have more than one successor 
Early start /...
-
$12.49 More Info
MGRADES