Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about ? On this page you'll find 15455 study documents about .

Page 2 out of 15.455 results

Sort by

C783 Quizes with complete solutions
  • C783 Quizes with complete solutions

  • Exam (elaborations) • 16 pages • 2024
  • C783 Which data gathering technique is used for identifying a list of ideas in a short period of time in the Develop Project Charter process? - correct answer Brainstorming In the Develop Project Charter process, which technique is based on a set of criteria that has been acquired in a specific knowledge area or product area? - correct answer Expert judgment Which process in project integration management creates a formal record of the project and shows the organizational commitment to the...
    (0)
  • $17.99
  • + learn more
Project Management C783 Full Set with verified answers
  • Project Management C783 Full Set with verified answers

  • Exam (elaborations) • 58 pages • 2024
  • Available in package deal
  • Project Management C783 Full SetA Guide to the Project Management Body of Knowledge (PMBOK Guide) - correct answer The PMI publication that defines widely accepted project management practices. The CAPM and the PMP exam are based on this book. Application areas - correct answer The areas of expertise, industry, or function where a project is centered. Examples of application areas include architecture, IT, health care, and manufacturing. Business value - correct answer A quantifiable retur...
    (0)
  • $23.99
  • + learn more
WGU - Project Management fully solved
  • WGU - Project Management fully solved

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • WGU - Project ManagementName the steps in validating a project. - correct answer Validate the business case, and then identify and analyze stakeholders. Name the 9 knowledge areas outlined in the PMBOK Guide. - correct answer Scope, time, cost, quality, human resources, communications, risk, procurement and integration management Name the steps in validating a business case. - correct answer feasibility study, justification, and alignment to the strategic plan In which project process g...
    (0)
  • $15.99
  • + learn more
WGU C783 - Project Management - 49 Processes well answered graded A+
  • WGU C783 - Project Management - 49 Processes well answered graded A+

  • Exam (elaborations) • 123 pages • 2024
  • Available in package deal
  • WGU C783 - Project Management - 49 Processes Develop Project Charter Knowledge Area: Integration Management Process Group: Initiating Inputs: 1. Business documents • Business case 2. Agreements 3. Enterprise environmental factors 4. Organizational process assets Tools & Techniques: 1. Expert judgment 2. Data gathering • Brainstorming
    (0)
  • $22.99
  • + learn more
WGU C783 - Project Management - Terms well answered
  • WGU C783 - Project Management - Terms well answered

  • Exam (elaborations) • 95 pages • 2024
  • Available in package deal
  • WGU C783 - Project Management - TermsApplication areas The areas of expertise, industry, or function where a project is centered. Examples of application areas include architecture, IT, health care, and manufacturing. Business value A quantifiable return on investment. The return can be tangible, such as equipment, money, or market share. The return can also be intangible, such as brand recognition, trademarks, and reputation. Cultural and social environment Type of environment; D...
    (0)
  • $19.99
  • + learn more
C952 with complete solutions
  • C952 with complete solutions

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • C952What was the first general-purpose computer called? Who built it? When was it built? - correct answer ENIAC J. Presper Eckert and John Mauchly World War II The name of the machine built by Alan Turing - correct answer Colossus What was the first electro-mechanical computer called? Who built it? What was the architecture called? - correct answer Mark-I Howard Aiken Harvard architecture What project invented Magnetic cores served as the main memory technology? - correct an...
    (0)
  • $11.49
  • + learn more
WGU 952 - Computer Architecture well answered to pass
  • WGU 952 - Computer Architecture well answered to pass

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • WGU 952 - Computer ArchitectureAND operator - correct answer A logical bit- by-bit operation with two operands that calculates a 1 only if there is a 1 in both operands. OR operator - correct answer A logical bit-by-bit operation with two operands that calculates a 1 if there is a 1 in either operand. LDUR - correct answer Load into register instruction LDUR X9, [X22,#64] = load value at X22[64] into X9 STUR - correct answer store into register instruction STUR X9, [X22, #64] = ...
    (0)
  • $9.99
  • + learn more
WGU C952 - Instructions questions with 100% correct answers
  • WGU C952 - Instructions questions with 100% correct answers

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • WGU C952 - InstructionsInstruction Set - correct answer The vocabulary of commands understood by a given architecture. Stored-program Concept - correct answer The idea that instructions and data of many types can be stored in memory as numbers and thus be easy to change, leading to the stored-program concept. Word - correct answer A natural unit of access in a computer, usually a group of 32 bits. Doubleword - correct answer Another natural unit of access in a computer, usually a group ...
    (0)
  • $9.99
  • + learn more