Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about ? On this page you'll find 596 study documents about .
Page 2 out of 596 results
Sort by
-
NCCCO Practice Exam | Questions With Complete Solution
- Exam (elaborations) • 11 pages • 2024
-
- $13.19
- + learn more
Crane configuration includes: 
A. reeving, boom length, counterweight, on outriggers, on rubbers, extensions or jibs stowed 
or mounted, off sets, wire rope type or construction 
B. hoist drum speeds, line pull, wire rope size and rigging C. load 
charts, LMI, axle weights and center of gravity 
D. drum rotation indicator, anti-two block, axle lock outs, and positive house lock A 
How does the operator determine the manufacturers recommended rope for the crane? A. count 
the sheaves in the boom ...
-
. NCCCO tower crane Exam Latest Update verified and ( Graded A+) Questions And Answers Updated Quaranteed 100% Score
- Exam (elaborations) • 42 pages • 2024
-
- $13.49
- + learn more
Splices in rall tracks shall have - 
ANSWER Smooth Joints 
Hydraulic systems should have their proper fluid level checked - 
ANSWER 
Daily 
If power fails during operations, the following shouldn't apply - 
ANSWER finish moving load where it was designated to go 
Do your best to 
If load is undetermined who is to find out if load weight does not exceed crane rating at 
radius at which the load is to be lifted - ANSWER Person responsible for lift
-
NCCCO Acronyms /89 Questions And Answers Graded (A+)
- Exam (elaborations) • 17 pages • 2024
-
- $13.49
- + learn more
Quiz :A&L - Answer :Antenna & Line Specialty 
A designation of the NWSA Telecommunication Program 
Quiz :ABC - Answer :Articulating Boom Crane 
A designation of the NCCCO Articulating Crane Program 
Quiz :ABL - Answer :Articulating Boom Loader 
A designation of the NCCCO Articulating Crane Program 
Quiz :ABW - Answer :Articulating Boom Crane w/ Winch
-
Nccco Test Questions With Complete Solution
- Exam (elaborations) • 9 pages • 2024
-
- $12.89
- + learn more
Boom up 
What action does a signal person intend the operator to perform if he extends his arm 
at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
1% 
When hoisting personnel, within what percentage of level must a telescopic boom crane 
be in order for the gross ratings in the load chart to remain valid? 
Stay in the cab until the lines are de-energized 
The load line of the crane you're operating contacts an energized power line. There's 
no sign of any other dange...
-
NCCCO (Getting to know OSHA 1926) Exam A+ Guaranteed.
- Exam (elaborations) • 9 pages • 2024
-
- $12.89
- + learn more
What OSHA regulations govern cranes for construction? correct answers 1926.1400 
What OSHA regulations govern cranes in general industry? correct answers 1910.180 
In running ropes ___ randomly distributed broken wires in one lay require removal from service 
correct answers 6 
In running ropes ____broken wires in one strand in one lay require removal from service. correct 
answers 3 
Wear of ______ the original diameter of outside individual wires the wire rope shall be removed 
from service. c...
-
NCCCO Tower Crane Exam Questions with Correct Answers
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
NCCCO Tower Crane Exam Questions with Correct Answers 
 
Splices in rall tracks shall have - Answer-Smooth Joints 
 
Hydraulic systems should have their proper fluid level checked - Answer-Daily 
If power fails during operations, the following shouldn't apply - Answer-Do your best to finish moving load where it was designated to go 
If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be lifted - Answer-Person responsible for l...
-
NCCCO Test 3 Questions with Correct Answers
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
NCCCO Test 3 Questions with Correct Answers 
The crane is out of level, you release the swing break, the boom swings downhill, your: - Answer-Load radius increases 
 
Blocking can be placed under the ends of tracks to: - Answer-Increase the cranes stability when Operating over front or back 
 
What quadrant produces the least amount of ground pressure on a lattice crawler: - Answer-Side 
 
On lattice boom crane's fitted with power load Lowering , a heavy load should be lowered by using the: - A...
-
NCCCO TEST 2 Questions with Complete Solutions
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- $13.29
- + learn more
NCCCO TEST 2 Questions with Complete Solutions 
When making a multiple crane lift, it is important for the operator to understand that: - Answer-The weight may increase if the other crane lands the load 
 
If a crane is not set-up level and the operator swings a load from the high side to the low side, the load radius will: - Answer-Increase 
 
Most crane manufacturers reduce load capacity for duty-cycle operations because: - Answer-Side loading forces may occur 
 
On who's recommendations shou...
-
NCCCO Test 1 Questions with Correct Answers
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- $13.59
- + learn more
NCCCO Test 1 Questions with Correct Answers 
Where is the best location for leveling a crane? - Answer-Upperworks 
 
When determining the "gross load" the best method is: - Answer-Get an accurate load weight and add the rigging. 
 
By order of hitch strength, which is the correct answer? - Answer-Basket, vertical, choker 
 
What is the purpose of using a jib? - Answer-Increase height 
 
When taking a side strain on a boom, what concerns the operator most? - Answer- Boom damage 
 
You should al...
-
NCCCO RIGGING 1 & 2 Exam Questions with Correct Answers
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- $12.89
- + learn more
NCCCO RIGGING 1 & 2 Exam Questions with Correct Answers 
OSHA 1910 - Answer-General Industry Standards 
 
OSHA 1926 - Answer-Construction Industry Standards 
 
OSHA 1910.180 - Answer-Crawler, Locomotive and Truck Cranes 
 
OSHA 1910.184 - Answer-Slings 
 
OSHA 1926.251 - Answer-Rigging Equipment used for material handling 
 
OSHA 1926.1400 - Answer-Cranes and Derricks used in construction 
 
ASME B30.3 - Answer-Tower Cranes 
 
ASME B30.5 - Answer-Mobile and Locomotive Cranes 
 
ASME B30.9 - Ans...