- Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about ? On this page you'll find 15 study documents about .
All 15 results
Sort by:
-
Exam (elaborations)
NCCCO SIGNAL PERSON TEST Exam Questions with 100% Correct Answers | Verified | Latest Update 2025!!
-
--37November 20252025/2026A+
- NCCCO SIGNAL PERSON TEST Exam Questions with 100% Correct Answers | Verified | Latest Update 2025!!
-
Free More Info
Milestone
-
Exam (elaborations)
NCCCO SIGNAL PERSON TEST Exam Questions with 100% Correct Answers | Verified | Latest Update 2025!!
-
---7August 20252025/2026A+
- NCCCO SIGNAL PERSON TEST Exam Questions with 100% Correct Answers | Verified | Latest Update 2025!!
-
$15.49 More Info
TESTPOOL
-
Exam (elaborations)
Nccco Signal Person Test Questions With Correct Answers Graded A+
-
---10November 20242024/2025A+
- Nccco Signal Person Test Questions With Correct Answers 
Graded A+ 
tested☑️Correct Ans-according to osha 1926.1419 before lifting operations begin 
communication systems shall be 
identify each other☑️Correct Ans-prior to commencing a crane lift the operator and 
signalperson shall
-
$7.59 More Info
TutorNest
-
Exam (elaborations)
Nccco Signal Person Test Questions and Answers Graded A+
-
--14October 20242024/2025A+Available in bundle
- Nccco Signal Person Test Questions and 
 
Answers Graded A+ 
 
What is the primary role of a signal person on a job site? 
 The signal person's primary role is to communicate instructions to the crane operator and 
ensure safe lifting operations. 
 
What hand signal is used to indicate that a load should be lowered? 
 The signal to lower a load is typically made by moving one arm down in a sweeping motion. 
 
How should you signal a crane operator to stop the lift? 
 To signal a stop, raise b...
-
$10.49 More Info
BrilliantScores
-
Exam (elaborations)
Nccco signal person test Questions & Answers 100% Correct!!
-
--7October 20242024/2025A+Available in bundle
- continuously - ANSWERduring all crane movements, asme b30.5 states that communication shall be maintained 
 
stop crane movements - ANSWERif the communication is disrupted at any time while the crane is operation, the operator shall 
 
osha 1926.1400 appendix a - ANSWEROSHA's standard method crane hand signals would be located in the following 
 
designated person - ANSWERaccording to asme b30.5 prior to qualifying all signal persons they must be tested by? 
 
none - ANSWERwhat should be the ...
-
$13.99 More Info
papersbyjol
-
Package deal
EACH AND EVERY NCCCO AND NCCCO CORE BUNDLED EXAM INCLUDES DETAILED QUESTIONS AND VERIFIED ANSWERS WITH THE MOST RECENT UPDATE IN 2024-2025
-
---15July 2024
- EACH AND EVERY NCCCO AND NCCCO CORE BUNDLED EXAM INCLUDES DETAILED QUESTIONS AND VERIFIED ANSWERS WITH THE MOST RECENT UPDATE IN 2024-2025...
-
$28.50 More Info
luzlinkuz
-
Exam (elaborations)
NCCCO SIGNAL PERSON TEST 2024-2025
-
--7July 20242023/2024Available in bundle
- NCCCO SIGNAL PERSON TEST ...
-
$10.99 More Info
luzlinkuz
-
Exam (elaborations)
Nccco signal person test Questions and answers with 100% correct solutions | A+ Grade
-
---8April 20242023/2024A+
- continuously during all crane movements, asme b30.5 states that communication shall be 
maintained 
stop crane movements if the communication is disrupted at any time while the crane is operation, 
the operator shall 
osha 1926.1400 appendix a OSHA's standard method crane hand signals would be located in the 
following 
designated person according to asme b30.5 prior to qualifying all signal persons they must be tested 
by? 
none what should be the response of the operator if the signal is not ...
-
$9.49 More Info
FLYINGCOLORS