PERSON TEST
when necessary to control platform - ANSWERS-when signaling a
personnel platform 1926.1431 states tag lines must be used
dangerous - ANSWERS-according to 1926.1431 while hoisting a
personnel platform what weather condition listed below will promptly
discontinue the operation
operator - ANSWERS-while hoisting employees in a personnel platform
direct communication must be maintained between the signalman and
who
pre lift meeting - ANSWERS-what must the operator signalman and the
crew attend before they hoist a personnel platform
osha 1926.1400 appendix a - ANSWERS-according to osha which hand
signal examples must be used to signal cranes
signal person - ANSWERS-prior to beginning lifting operations using
voice signals the signals shall be discussed and agreed upon by the lift
director crane operator and which person lift below
END OF
PAGE
1
, NCCCO SIGNAL LATEST
PERSON TEST
hand signals - ANSWERS-before commencing lifting operations the
operator and the signalperson shall contact and identify each other when
using which form of communication
test - ANSWERS-telephone,radios, or equivalent if used for voice
signals must have what performed on them prior to use
dedicated - ANSWERS-when directing a crane using voice signals the
transmission must be through a channel that is
lift supervisor - ANSWERS-according to asme b30.23 who is
responsible for assigning the signalperson prior to any hoisting
safety representative - ANSWERS-who is responsible for designating
the number of signalpersons required to hoist a personnel platform
safely
communicate with the operator - ANSWERS-according to asme b30.23
in a suspended personnel platform without boom motion controls
management shall designate one person to perform what task
END OF
PAGE
2