100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

Nccco signal person test Questions & Answers 100% Correct!!

Rating
-
Sold
-
Pages
7
Grade
A+
Uploaded on
16-10-2024
Written in
2024/2025

continuously - ANSWERduring all crane movements, asme b30.5 states that communication shall be maintained stop crane movements - ANSWERif the communication is disrupted at any time while the crane is operation, the operator shall osha 1926.1400 appendix a - ANSWEROSHA's standard method crane hand signals would be located in the following designated person - ANSWERaccording to asme b30.5 prior to qualifying all signal persons they must be tested by? none - ANSWERwhat should be the response of the operator if the signal is not understood posted conspicuously - ANSWERaccording to asme b30.5 where must a hand signal chart be posted lift director, signalman and operator - ANSWERwhen using voice signals according to asme b30.5 who must be present for the pre lift discussion limitations - ANSWERa qualified signal person must have knowledge of the standard hand and voice signals along with a basic understanding of crane operations and tested - ANSWERaccording to osha 1926.1419 before lifting operations begin communication systems shall be standard signals - ANSWERaccording to asme b30.5 special signals cannot conflict with

Show more Read less
Institution
Nccco Signal Person
Course
Nccco signal person









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Nccco signal person
Course
Nccco signal person

Document information

Uploaded on
October 16, 2024
Number of pages
7
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Nccco signal person test Questions & Answers
100% Correct!!

continuously - ANSWERduring all crane movements, asme b30.5 states that communication shall be
maintained



stop crane movements - ANSWERif the communication is disrupted at any time while the crane is
operation, the operator shall



osha 1926.1400 appendix a - ANSWEROSHA's standard method crane hand signals would be located
in the following



designated person - ANSWERaccording to asme b30.5 prior to qualifying all signal persons they must
be tested by?



none - ANSWERwhat should be the response of the operator if the signal is not understood



posted conspicuously - ANSWERaccording to asme b30.5 where must a hand signal chart be posted



lift director, signalman and operator - ANSWERwhen using voice signals according to asme b30.5 who
must be present for the pre lift discussion



limitations - ANSWERa qualified signal person must have knowledge of the standard hand and voice
signals along with a basic understanding of crane operations and



tested - ANSWERaccording to osha 1926.1419 before lifting operations begin communication systems
shall be

standard signals - ANSWERaccording to asme b30.5 special signals cannot conflict with



back up - ANSWERif the operator sounds three short audible signals while loving the crane he/she
intends to



identify each other - ANSWERprior to commencing a crane lift the operator and signalperson shall

, perspective - ANSWERany direction given to the crane operator by the signal person shall be given
from the operator



function and direction - ANSWERwhat is the first element of voice signals given to a crane operator
prior to the lift



three - ANSWERaccording to osha and asme b30.5 each series of voice signals contain how many
elements



lift director - ANSWERfor lifting operations using voice signals who has the responsibility of
permitting multiple simultaneous crane functions




stop - ANSWERif the operator sounds one short audible signal while moving the crane he/she intends
to



job site location - ANSWERaccording to asme b30.5 ant audible emergency signal must be agreed
upon at each



go ahead - ANSWERif the operator sounds two short audible signals while move crane he/she
intends to



hard wire radio - ANSWERwhen signaling a tower crane which of the following is most reliable



anti two block - ANSWERaccording to osha 1926.1431 when signaling a crane that is lifting a
personnel platform which device listed below must be attached to the crane



hoist free fall - ANSWERaccording to osha 1926.1431 which of these hoist options is prohibited




asme b30.3 - ANSWERaccording to asme which volume listed below must be used to hand signal a
tower crane

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
papersbyjol West Virginia
View profile
Follow You need to be logged in order to follow users or courses
Sold
421
Member since
3 year
Number of followers
253
Documents
14027
Last sold
1 month ago

3.8

72 reviews

5
27
4
18
3
17
2
2
1
8

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions