ARE 5.0 Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about ARE 5.0? On this page you'll find 104 study documents about ARE 5.0.
Page 2 out of 104 results
Sort by
-
ARE 5.0: Project Management Questions and Answers | Latest Updated Graded A+
- Exam (elaborations) • 55 pages • 2024
- Available in package deal
-
- $13.39
- + learn more
Application for Payment (A201; Article 9) - Submitted by the Contractor to the Architect. 
Itemized and prepared in accordance with Schedule of Values. Architect reviews and submits to 
the owner so that they can pay the contractor, or withholds for valid reasons. 
Partnering - Stakeholders in a project all participate in decision-making process. Can 
produce closer communication and shared responsibilities but requires more difficult 
management. 
Project Manager - Coordinates the activities of...
-
ARE 5.0 Project Management Questions and Answers | Latest Updated Graded A+
- Exam (elaborations) • 24 pages • 2024
- Available in package deal
-
- $11.98
- + learn more
Project Management - Includes project planning, scheduling, monitoring, coordinating and 
directing, updating documentation, closing out the job, and following up with clients. 
Partnering - Various stakeholders in a project (such as the architect, owner, contractor and 
vendors) all participate in the decision-making process. 
Bar Chart - Method commonly used for scheduling design and construction projects. Tasks 
are listed in chronological order on vertical access and time period is listed on...
-
ARE 5.0 PCM Questions and Answers | Latest Updated Graded A+
- Exam (elaborations) • 17 pages • 2024
- Available in package deal
-
- $11.98
- + learn more
CANNON 1 - GENERAL OBLIGATIONS: MAINTAIN & ADVANCE THEIR 
KNOWLEDGE OF THE ART & SCIENCE OF ARCHITECTURE, CONTRIBUTE TO ITS 
GROWTH, EXERCISE LEARNED AND COMPROMISED PROFESSIONAL JUDGEMENT. 
CANNON II - OBLIGATIONS TO THE PUBLIC: SERVE THE PUBLIC INTEREST IN 
THEIR PROFESSIONAL AND PERSONAL ACTIVITIES 
CANNON III - OBLIGATIONS TO THE CLIENT: SERVE CLIENTS COMPETENTLY 
AND IN A PROFESSIONAL MANNER. 
CANNON IV - OBLIGATIONS TO THE PROFESSION: UPHOLD THE INTEGRITY 
AND DIGNITY OF THE PROFESSION. 
C...
-
ARE 5.0 PCM Exam with 100% Correct | Latest Updated Graded A+
- Exam (elaborations) • 29 pages • 2024
- Available in package deal
-
- $12.44
- + learn more
Party Dispute - Problems that arise on a project (i.e. delays, failures, fee controversies) 
Administrative Proceeding - Problems that arise from civil statutes (i.e. licensing, code 
compliance, regulations) 
Standard of Care - What a reasonably prudent architect would do, in the same time and 
place, given the same or similar facts and circumstances. The law does not require perfection. 
Duty - A set of terms or requirements that defines what one person "owes" another in a 
particular relati...
-
ARE 5.0: PA Exam with 100% Correct | Latest Updated Graded A+
- Exam (elaborations) • 32 pages • 2024
- Available in package deal
-
- $12.44
- + learn more
3:1 = ___:10,000 
30,000/400 = 75 - A project site has 50,000 sf of land and 10,000 sf of gross building floor 
area. The zoning ordinance has a required ratio of 3 sf of parking area to 1 sf of gross building 
area. How many parking spaces are required at 400 sf/car? 
300-400 sqft 
(350 sqft is best to use in equations) - general amount of square footage dedicated to parking 
space 
24 feet - typical drive aisle width in a parking lot 
9' x 19' (WxL) - typical parking space dimensions 
SRI (S...
Fear of missing out? Then don’t!
-
ARE 5.0 PA Questions with 100% Correct | Latest Updated Graded A+
- Exam (elaborations) • 24 pages • 2024
- Available in package deal
-
- $12.44
- + learn more
Nadir (noun) - The direction pointing below a particular location 
Light Trespass - When unwanted light enters a neighboring property, for instance, by shining 
over a fence 
Light Pollution - The result of outdoor lighting that is not properly shielded, allowing light to 
be directed into the night sky 
Dark Sky - Reduce the light going up into the sky that reduces the visibility of the stars 
Longitude - The number of degrees east or west of the prime meridian on the earths surface 
Brownfield...
-
ARE 5.0 PPD Test with 100% Correct | Latest Updated Graded A+
- Exam (elaborations) • 38 pages • 2024
- Available in package deal
-
- $12.94
- + learn more
Annalemma - The figure 8 curve that represents the angular offset of the sun from its mean 
position at as viewed from the earth 
Balance Point Temperature - The outdoor temperature at which a building makes the 
transition from a heating to a cooling need 
Daylight autonomy - The percentage of an area that meets a minimum daylight illuminance 
level or specified fraction of the operating hours per year. also referred to as special daylight 
autonomy 
Daylight factor - The ratio expressed as a p...
-
ARE 5.0 PPD Test with 100% Correct | Latest Updated Graded A+
- Exam (elaborations) • 38 pages • 2024
- Available in package deal
-
- $12.44
- + learn more
Annalemma - The figure 8 curve that represents the angular offset of the sun from its mean 
position at as viewed from the earth 
Balance Point Temperature - The outdoor temperature at which a building makes the 
transition from a heating to a cooling need 
Daylight autonomy - The percentage of an area that meets a minimum daylight illuminance 
level or specified fraction of the operating hours per year. also referred to as special daylight 
autonomy 
Daylight factor - The ratio expressed as a p...
-
ARE 5.0 – PPD exam with 100% Correct | Latest Updated Graded A+
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $11.48
- + learn more
SITE DESIGN: BLDG LOCATION/IMPROVEMENTS - ALL BLDGS DISRUPT 
DRAINAGE. ACCOMMADATE INCREASED RUNOFF. POSITIVE DRAINAGE AWAY 
FROM BLDGS. 
SITE DESIGN: DRAINAGE TYPES - ABOVE GROUND OR BELOW GROUND. 
ABOVE: PERVIOUS PAVING, SHEET FLOW, GUTTERS, SWALES, CHANNELS, AND 
RUNOFFS. BELOW: PERFORATED DRAINS, ENCLOSED STORM SEWERS TO CITY 
LINES OR TO NATURAL FEATURE 
SITE DESIGN: PAVING - MINIMUM SITE PAVING TO BE 1.5% ABOVE GROUND. 
BELOW GROUND 0.3% 
SITE DESIGN: UNDERGROUND ITEMS - STORM DRAINS COLLE...
-
ARE 5.0 Programming & Analysis Exam with 100% Correct | Latest Updated Graded A+
- Exam (elaborations) • 34 pages • 2024
- Available in package deal
-
- $12.94
- + learn more
ARE 5.0 Programming & Analysis Exam with 100% 
Correct | Latest Updated Graded A+ 
Satellite Towns - Smaller towns dependent on larger towns nearby for business. 
New Town Concept - Started in Great Britain in the 1940's, it is an extension of the idea that 
entirely new communities can be built away from the crowding and ugliness of existing cities. 
New Urbanism - A more recent planning philosophy that attempts to counter the many 
undesirable aspects of city development, including suburban s...
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia