1. What is the primary purpose of a crane's load chart?
A) To list the phone numbers of the crane manufacturer.
B) To specify the correct operating procedures for the crane.
C) To provide information on the crane's capabilities and limitations.
D) To show the maintenance schedule for the crane.
2. Who is ultimately responsible for the safety of the lift and all
personnel on the job site?
A) The Signal Person
B) The Crane Operator
C) The Lift Director / Site Supervisor
D) The Oil Worker
3. What is the term for the weight of the crane itself, plus the weight
of all structural attachments and permanently mounted equipment?
A) Net Capacity
B) Gross Capacity
,C) Total Load
D) Deadweight
4. Before starting a lift, the crane operator must ensure the crane is:
A) On a firm, stable, and level surface.
B) As close to the load as possible.
C) On a slight incline for better visibility.
D) On the softest ground available to absorb shock.
5. A "Tagline" is primarily used for:
A) Tagging out defective equipment.
B) Controlling the swing and rotation of the load.
C) Measuring the length of the boom.
D) Connecting the hook to the sling.
6. What does EICA stand for in this context?
A) Electrical Industry Crane Association
B) Energy Industry Crane Association
C) European Institute of Crane Administration
D) Equipment Inspection and Certification Agency
7. The practice of using two or more cranes to lift a single load is called
a:
A) Tandem Lift
B) Double Lift
C) Buddy Lift
D) Complex Lift
8. What is the minimum number of wraps of wire rope that must
remain on the hoist drum at all times?
A) One wrap
, B) Two wraps
C) Three wraps
D) As many as possible
9. The area around the crane where the load is being moved is called
the:
A) Work Zone
B) Swing Radius
C) Danger Zone
D) All of the above are acceptable terms.
10. A "Jib" is an extension attached to the main boom that:
A) Increases the crane's lifting capacity at all radii.
B) Provides a place for the operator to stand.
C) Increases the crane's hook height and reach.
D) Is used for lifting personnel only.
11. What is the primary cause of crane accidents?
A) Mechanical failure
B) Operator error / Human factors
C) Weather conditions
D) Manufacturing defects
12. Before operating, the crane operator must perform a:
A) Pre-operational inspection
B) Full engine overhaul
C) Load test with 150% of capacity
D) Signal person certification test
13. The "Quadrant of Operation" for a crane refers to:
A) The four main gears of the transmission.
Exam fully solved & updated 2025-2026
(latest version verified for accuracy)
(Questions + Answers) Solved 100%
Correct!!
EICA Crane Certification Test Study Guide
100 Questions & Answers | Fully Solved & Updated 2025-2026
1. What is the primary purpose of a crane's load chart?
A) To list the phone numbers of the crane manufacturer.
B) To specify the correct operating procedures for the crane.
C) To provide information on the crane's capabilities and limitations.
D) To show the maintenance schedule for the crane.
2. Who is ultimately responsible for the safety of the lift and all
personnel on the job site?
A) The Signal Person
B) The Crane Operator
C) The Lift Director / Site Supervisor
D) The Oil Worker
3. What is the term for the weight of the crane itself, plus the weight
of all structural attachments and permanently mounted equipment?
A) Net Capacity
B) Gross Capacity
,C) Total Load
D) Deadweight
4. Before starting a lift, the crane operator must ensure the crane is:
A) On a firm, stable, and level surface.
B) As close to the load as possible.
C) On a slight incline for better visibility.
D) On the softest ground available to absorb shock.
5. A "Tagline" is primarily used for:
A) Tagging out defective equipment.
B) Controlling the swing and rotation of the load.
C) Measuring the length of the boom.
D) Connecting the hook to the sling.
6. What does EICA stand for in this context?
A) Electrical Industry Crane Association
B) Energy Industry Crane Association
C) European Institute of Crane Administration
D) Equipment Inspection and Certification Agency
7. The practice of using two or more cranes to lift a single load is called
a:
A) Tandem Lift
B) Double Lift
C) Buddy Lift
D) Complex Lift
8. What is the minimum number of wraps of wire rope that must
remain on the hoist drum at all times?
A) One wrap
, B) Two wraps
C) Three wraps
D) As many as possible
9. The area around the crane where the load is being moved is called
the:
A) Work Zone
B) Swing Radius
C) Danger Zone
D) All of the above are acceptable terms.
10. A "Jib" is an extension attached to the main boom that:
A) Increases the crane's lifting capacity at all radii.
B) Provides a place for the operator to stand.
C) Increases the crane's hook height and reach.
D) Is used for lifting personnel only.
11. What is the primary cause of crane accidents?
A) Mechanical failure
B) Operator error / Human factors
C) Weather conditions
D) Manufacturing defects
12. Before operating, the crane operator must perform a:
A) Pre-operational inspection
B) Full engine overhaul
C) Load test with 150% of capacity
D) Signal person certification test
13. The "Quadrant of Operation" for a crane refers to:
A) The four main gears of the transmission.