NICET HIGHWAY CONSTRUCTION LEVEL 2 2025 COMPLETE REVIEW STUDY GUIDE & PRACTICE OUTLINE || LATEST VERSION Section 1: Project Administration & Communication (15 Questions)

Rating
-
Sold
-
Pages
54
Grade
A+
Uploaded on
08-12-2025
Written in
2025/2026

NICET HIGHWAY CONSTRUCTION LEVEL 2 2025 COMPLETE REVIEW STUDY GUIDE & PRACTICE OUTLINE || LATEST VERSION Section 1: Project Administration & Communication (15 Questions)

Institution
HESI Pharmacology
Course
HESI Pharmacology











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
HESI Pharmacology
Course
HESI Pharmacology

Document information

Uploaded on
December 8, 2025
Number of pages
54
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NICET HIGHWAY CONSTRUCTION LEVEL 2 2025
COMPLETE REVIEW STUDY GUIDE & PRACTICE
OUTLINE || LATEST VERSION
Section 1: Project Administration & Communication (15 Questions)

1. Q: What is the primary purpose of a Preconstruction Conference?
A: To establish lines of communication, review contract requirements, and discuss
schedules, submittals, and inspection procedures with all key project personnel.

2. Q: Which document formally authorizes the contractor to begin work on a specific
portion of the project?
A: A Notice to Proceed (NTP).

3. Q: What is the inspector's most important action when non-conforming work is
discovered?
A: Document the deficiency and notify the contractor's superintendent immediately to
initiate corrective action.

4. Q: "RFI" stands for what, and who typically initiates it?
A: Request for Information; initiated by the contractor to clarify design or specification
issues.

5. Q: What should a daily inspector's report always include?
A: Date, weather, personnel/equipment on site, work performed, materials used, and
any problems or delays.

6. Q: The project "Pay Item" list is found in what contract document section?
A: The Bid Schedule or Proposal.

7. Q: What is the difference between a "Change Order" and a "Field Order"?
A: A Change Order is a formal contract modification for scope/cost/time. A Field Order is
a directive for minor work, often pending a formal Change Order.

8. Q: Who has the ultimate authority to reject defective materials or workmanship on a
public works project?
A: The Project Engineer or the Owner's Authorized Representative.

, 9. Q: What is the purpose of a "Punch List"?
A: To itemize all incomplete or deficient work to be corrected prior to final project
acceptance.

10. Q: Verifying that work is performed in accordance with the contract is known as?
A: Compliance Inspection.

11. Q: What key information is found in the project's "Special Provisions"?
A: Requirements that modify, add to, or delete from the Standard Specifications for the
specific project.

12. Q: Photos used in inspection documentation should always include what?
A: A scale or reference object, a photo log with date/location/description, and should
show both overall context and specific detail.

13. Q: What does the acronym "MUTCD" stand for?
A: Manual on Uniform Traffic Control Devices.

14. Q: Who is responsible for providing and maintaining traffic control devices during
construction?
A: The Contractor, as detailed in their approved Traffic Control Plan (TCP).

15. Q: The formal process for resolving a contractor's disagreement over payment or
specification interpretation is called?
A: A Claims or Disputes Resolution process.

Section 2: Earthwork Inspection (20 Questions)

16. Q: What is the primary test to determine the maximum dry density and optimum
moisture content of soils for compaction?
A: The Proctor Test (Standard or Modified).

17. Q: Field compaction is most commonly measured by what method?
A: Nuclear density gauge or Sand Cone (ASTM D1556) test.

18. Q: A compaction test result of 98% of Modified Proctor indicates what?
A: The in-place soil density is 98% of the laboratory-determined maximum dry density
for that soil.

19. Q: What type of soil is described as "A-2-6" in the AASHTO Soil Classification System?
A: A silty or clayey gravel and sand soil.

,20. Q: "End haul" refers to?
A: Excavating material and transporting it to a disposal site not on the project.

21. Q: What is the primary purpose of proof-rolling a subgrade?
A: To detect soft or unstable areas that need correction before the next layer is placed.


22. Q: For embankment construction, soil should be placed in lifts not exceeding what
typical thickness?
A: 6 to 8 inches (150 to 200 mm) loose thickness.

23. Q: The difference between cut and fill volumes, accounting for shrinkage, is shown on
what plan?
A: The Mass Diagram.

24. Q: What is the minimum typical compaction requirement for a roadway subgrade?
A: 95% of Modified Proctor density.

25. Q: A slope of 2:1 (Horizontal:Vertical) is steeper than a slope of 3:1. (True/False)
A: False. 2:1 is steeper (0.5 slope ratio) than 3:1 (~0.33 slope ratio).

26. Q: What does a "CBR" (California Bearing Ratio) test measure?
A: The shear strength and bearing capacity of a subgrade soil relative to a standard
crushed rock.

27. Q: What is the primary function of a geotextile in a separation application?
A: To prevent the mixing of two dissimilar soil layers (e.g., subgrade and aggregate base).


28. Q: Rock excavation is typically defined as any material requiring what to remove?
A: Blasting or use of a ripper.

29. Q: What is the "optimum moisture content" for compaction?
A: The water content at which a soil can achieve its maximum dry density under a given
compactive effort.

30. Q: Standing water in an excavation prior to placing fill is a cause for rejection.
(True/False)
A: True. Water must be removed and the area dried or stabilized.

31. Q: A "bench" is cut into an existing slope to do what?
A: Provide a stable foundation for fill material on a hillside.

, 32. Q: What instrument is used to quickly check if aggregate base material is within
specification for moisture content prior to compaction?
A: A speedy moisture tester (calcium carbide gas pressure tester).

33. Q: What is "fluff factor" or "swell"?
A: The increase in volume of earth when it is excavated.

34. Q: The vertical height of a slope is called its?
A: Cut or Fill depth.

35. Q: What is the purpose of a "key" in embankment construction on a slope?
A: To prevent the fill from sliding along the natural ground surface.

Section 3: Base & Aggregate Surfaces (15 Questions)

36. Q: What is the primary function of an aggregate base course?
A: To provide stable support and distribute loads to the subgrade.

37. Q: The particle size distribution of an aggregate is determined by what test?
A: Sieve Analysis (Gradation Test).

38. Q: What does the "L.A. Abrasion" test measure?
A: The hardness and resistance to wear (degradation) of coarse aggregate.

39. Q: Aggregate for base course must typically have less than 1% passing the No. 200
sieve to control what?
A: The amount of fine, plastic soils that can retain water and reduce stability.

40. Q: What is the typical minimum compaction requirement for an aggregate base
course?
A: 100% of Modified Proctor density.

41. Q: "Dense Graded Aggregate" (DGA) is designed to do what?
A: Achieve maximum density and interlock by having a well-graded distribution of
particle sizes.

42. Q: What is a common field test for the plasticity of fines in an aggregate?
A: The plasticity index (PI) test, determined from Liquid and Plastic Limits (Atterberg
Limits).

43. Q: Segregation in stockpiled aggregate can be minimized by what method?
A: Stockpiling in layers and using proper placement techniques (not end-dumping).
$11.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
lecStudyNest

Also available in package deal

Thumbnail
Package deal
Public Safety, Licensing & Compliance SuperPrep Bundle — 10 Complete Certification Study Guides
-
9 2025
$ 103.41 More info

Get to know the seller

Seller avatar
lecStudyNest Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
1
Member since
1 month
Number of followers
0
Documents
175
Last sold
4 days ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions