100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CISEC Study for Exam | Q-Bank | Complete Accurate Quizzes with Verified Answers (Latest Update 2025 | 2026) A+ Graded.

Rating
-
Sold
-
Pages
46
Grade
A+
Uploaded on
22-09-2025
Written in
2025/2026

CISEC Study for Exam | Q-Bank | Complete Accurate Quizzes with Verified Answers (Latest Update 2025 | 2026) A+ Graded. Quiz_________________? True or False: The CGP states that inspections are to occur only during normal working hours. - Answer True Quiz_________________? True or False: The CGP does not mandate inspection of equipment storage and maintenance areas. - Answer False Quiz_________________? True or False: Since 1998, regulations require permits for Phase I (5 acres or more) projects. Since 2003, permits also required for Phase II (1 or more acres) projects. - Answer True Quiz_________________? True or False: Under the Clean Water Act (CWA), citizens can bring civil action against violators of statutes and regulations. - Answer True Quiz_________________? As of 2019, Class I Administrative penalties under the CWA are up to _________ per violation with a max. penalty of __________. a. $15,124; $68,477 b. $8,124; $52,570 c. $20,628; $51,570 d. $20,218; $51,174 - Answer c. $20,628; $51,570 Quiz_________________? Who has the responsibility to make sure that maintenance has been performed on the BMPs? a. Contractor b. Designer c. Inspector d. Contractor and Inspector e. all of the above - Answer d. Contractor and Inspector Quiz_________________? Who has the responsibility to make sure that control measures are properly selected, installed, and maintained? a. LRP b. Designer c. Designer, Inspector, and Contractor d. Contractor and Inspector e. all of the above - Answer c. Designer, Inspector, and Contractor Quiz_________________? True or False: The NPDES permit authorizes operators to discharge pollutants in the manner that makes most sense for the site. - Answer False Quiz_________________? True or False: The EPA must grant approval for cationic flocculants. - Answer True Quiz_________________? True or False: The goal of the NPDES permit is to eliminate all discharge of pollutants from a construction site. - Answer False. The goal is to minimize, not eliminate Quiz_________________? True or False: The EPA is adamant that BMPs only be installed during the early phases of construction site development. - Answer False Quiz_________________? Inspections must be done within 24 hours of a storm event which has had greater than ________ inches of rainfall. - Answer 0.25 inches Quiz_________________? True or False: The SWPPP should always include the frequency of inspections. - Answer True

Show more Read less
Institution
CISEC |
Course
CISEC |











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CISEC |
Course
CISEC |

Document information

Uploaded on
September 22, 2025
Number of pages
46
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Verified Answers (Latest Update 2025 |



Quiz_________________?

True or False: The CGP states that inspections are to occur only during normal working
hours. -

Answer✅

True



Quiz_________________?

True or False: The CGP does not mandate inspection of equipment storage and
maintenance areas. -

Answer✅

False



Quiz_________________?

True or False: Since 1998, regulations require permits for Phase I (5 acres or more)
projects. Since 2003, permits also required for Phase II (1 or more acres) projects. -

Answer✅

True



Quiz_________________?




1

,True or False: Under the Clean Water Act (CWA), citizens can bring civil action against
violators of statutes and regulations. -

Answer✅

True



Quiz_________________?

As of 2019, Class I Administrative penalties under the CWA are up to _________ per
violation with a max. penalty of __________.



a. $15,124; $68,477

b. $8,124; $52,570

c. $20,628; $51,570

d. $20,218; $51,174 -

Answer✅

c. $20,628; $51,570



Quiz_________________?

Who has the responsibility to make sure that maintenance has been performed on the
BMPs?



a. Contractor

b. Designer

c. Inspector

d. Contractor and Inspector

e. all of the above -

Answer✅

d. Contractor and Inspector



Quiz_________________?



2

,Who has the responsibility to make sure that control measures are properly selected,
installed, and maintained?



a. LRP

b. Designer

c. Designer, Inspector, and Contractor

d. Contractor and Inspector

e. all of the above -

Answer✅

c. Designer, Inspector, and Contractor



Quiz_________________?

True or False: The NPDES permit authorizes operators to discharge pollutants in the
manner that makes most sense for the site. -

Answer✅

False



Quiz_________________?

True or False: The EPA must grant approval for cationic flocculants. -

Answer✅

True



Quiz_________________?

True or False: The goal of the NPDES permit is to eliminate all discharge of pollutants from
a construction site. -

Answer✅

False. The goal is to minimize, not eliminate



Quiz_________________?


3

, True or False: The EPA is adamant that BMPs only be installed during the early phases of
construction site development. -

Answer✅

False



Quiz_________________?

Inspections must be done within 24 hours of a storm event which has had greater than
________ inches of rainfall. -

Answer✅

0.25 inches



Quiz_________________?

True or False: The SWPPP should always include the frequency of inspections. -

Answer✅

True



Quiz_________________?

True or False: Inspections should occur even in conditions that are unsafe for personnel. -

Answer✅

False



Quiz_________________?

After identifying issues, the SWPPP should be updated, and updates must occur within
______________ calendar days. -

Answer✅

7



Quiz_________________?

What method of erosion is marked by the bounding of soil particles? -


4
$3.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
Stuvialogin

Get to know the seller

Seller avatar
Stuvialogin Allegany College Of Maryland Somerset Campus
View profile
Follow You need to be logged in order to follow users or courses
Sold
1610
Member since
9 months
Number of followers
4
Documents
420
Last sold
2 weeks ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions