Building Matters Exam I Questions With
Complete Solutions
- Draw Buildings
- Model Buildings
- Design Buildings
- Construct Buildings
- Write about Buildings ...ANSWER...Making Buildings Question --- What do architects
do?
wall type ...ANSWER...The diamond tag in a CD plan refers to a....
- complete description of building systems (structural, mechanical, HVAC, plumbing, &
electrical), interior and exterior finishes and the building site ...ANSWER...Schematic
Design
3.) Client Approval
2.) Bidding Phase
1.) Schematic design phase
4.) Design development phase
5.) Construction documents phase ...ANSWER...Arrange typical project tasks (from
least time to most)
1.) Schematic design phase
2.) Bidding Phase
3.) Client Approval
4.) Design development phase
5.) Construction documents phase
A Vibrator ...ANSWER...Concrete Questions --- Concrete must be compacted in the
forms to eliminate trapped air and to fill completely around the reinforcing steel and into
all the corners of the formwork. What tool is used to accomplish this?
dropped from a substantial height ...ANSWER...Segregation will likely occur during
concrete placement if the concrete is...
, B.) Individually, each has a very high allowable tensile
strength ...ANSWER...Reinforcing steel and concrete are very compatible. Which of the
following is untrue?
A.) The two have similar coefficients of thermal expansion.
B.) Individually, each has a vey high allowable tensile strength.
C.) Concrete bonds well to reinforcing steel.
D.) They are chemically compatible; steel is protected from corrosion by the alkaline
chemistry of concrete
Delay hardening ...ANSWER...Admixtures are used in concrete to...
C.) Concrete left in the air after 7 days will have approximately 90 percent of its full
strength at 28 days. ...ANSWER...Which of these is a true statement?
A.) Concrete cured under water will have its full strength exactly at 90 days.
B.) Concrete left in the air as early as possible will reach full strength after several
years.
C.) Concrete left in the air after 7 days will have approximately 90 percent of its full
strength at 28 days.
D.) Concrete curing is not necessary for slabs, only walls.
E.) Concrete hardening continues at subfreezing temperatures, albeit slowly
- Drying shrinkage
- Loads placed on it
- Creep deformation ...ANSWER...Over time, concrete deforms because of:
the two-way concrete joist framing system ...ANSWER...Site Cast & Precast Concrete
Questions --- The waffle slab is:
Walls ...ANSWER...Form ties are associated with which concrete element?
One-way concrete joist system ...ANSWER...The accompanying sketch depicts a:
A control joint ...ANSWER...What is a continuous vertical joint filled with mortar, but with
a bond breaker on one side so that tensile stress cannot develop across the joint
Two-way flat plate ...ANSWER...Which of these concrete systems typically has the
smallest construction height (floors and beams)
Footing ...ANSWER...Which of the following concrete elements is least likely to be
precast?
weld plates embedded during casting & site-cast grounding and
rebar ...ANSWER...Precast elements are joined by:
Complete Solutions
- Draw Buildings
- Model Buildings
- Design Buildings
- Construct Buildings
- Write about Buildings ...ANSWER...Making Buildings Question --- What do architects
do?
wall type ...ANSWER...The diamond tag in a CD plan refers to a....
- complete description of building systems (structural, mechanical, HVAC, plumbing, &
electrical), interior and exterior finishes and the building site ...ANSWER...Schematic
Design
3.) Client Approval
2.) Bidding Phase
1.) Schematic design phase
4.) Design development phase
5.) Construction documents phase ...ANSWER...Arrange typical project tasks (from
least time to most)
1.) Schematic design phase
2.) Bidding Phase
3.) Client Approval
4.) Design development phase
5.) Construction documents phase
A Vibrator ...ANSWER...Concrete Questions --- Concrete must be compacted in the
forms to eliminate trapped air and to fill completely around the reinforcing steel and into
all the corners of the formwork. What tool is used to accomplish this?
dropped from a substantial height ...ANSWER...Segregation will likely occur during
concrete placement if the concrete is...
, B.) Individually, each has a very high allowable tensile
strength ...ANSWER...Reinforcing steel and concrete are very compatible. Which of the
following is untrue?
A.) The two have similar coefficients of thermal expansion.
B.) Individually, each has a vey high allowable tensile strength.
C.) Concrete bonds well to reinforcing steel.
D.) They are chemically compatible; steel is protected from corrosion by the alkaline
chemistry of concrete
Delay hardening ...ANSWER...Admixtures are used in concrete to...
C.) Concrete left in the air after 7 days will have approximately 90 percent of its full
strength at 28 days. ...ANSWER...Which of these is a true statement?
A.) Concrete cured under water will have its full strength exactly at 90 days.
B.) Concrete left in the air as early as possible will reach full strength after several
years.
C.) Concrete left in the air after 7 days will have approximately 90 percent of its full
strength at 28 days.
D.) Concrete curing is not necessary for slabs, only walls.
E.) Concrete hardening continues at subfreezing temperatures, albeit slowly
- Drying shrinkage
- Loads placed on it
- Creep deformation ...ANSWER...Over time, concrete deforms because of:
the two-way concrete joist framing system ...ANSWER...Site Cast & Precast Concrete
Questions --- The waffle slab is:
Walls ...ANSWER...Form ties are associated with which concrete element?
One-way concrete joist system ...ANSWER...The accompanying sketch depicts a:
A control joint ...ANSWER...What is a continuous vertical joint filled with mortar, but with
a bond breaker on one side so that tensile stress cannot develop across the joint
Two-way flat plate ...ANSWER...Which of these concrete systems typically has the
smallest construction height (floors and beams)
Footing ...ANSWER...Which of the following concrete elements is least likely to be
precast?
weld plates embedded during casting & site-cast grounding and
rebar ...ANSWER...Precast elements are joined by: