Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

APA Precast Concrete Batch Plant Operator Questions And Answers 2023

Document preview thumbnail
Preview 2 out of 5 pages

APA Precast Concrete Batch Plant Operator Questions And Answers 2023

Content preview

APA Precast Concrete Batch Plant Operator
Questions And Answers 2023




Stockpiles of aggregate shall be maintained in a well-drained condition in order
to: ...ANSWER...Minimize Free Water Content



Coarse aggregate stockpiles must be sprinkled for at lest how many hours prior to batch for
FDOT? ...ANSWER...24



Free moisture of the aggregate means: ...ANSWER...Moister on the surface of an aggregate that is above
and beyond the absorbed moister in the aggregate.



If the moister test is done other than by the cook-out method, how often shall the other methods be
verified? ...ANSWER...Each week



For drill shaft concrete, the quantity of cement replaced with fly ash shall be: ...ANSWER...33 thru 37%



In concrete, which material has a specific gravity of one? ...ANSWER...Water



What is the air content range for all classes of structural concrete except Class IV
Shaft? ...ANSWER...1.00 thru 6.00%



When can unmetered water be added to the concrete? ...ANSWER...Not at all.



Do not allow the total number of revolution at mixing speed to exceed: ...ANSWER...160 Revolutions

, After all materials have been charged into the transit mixer drum, the concrete must be mixed at how
many revolutions at the plant before leaving for the project? ...ANSWER...70 to 100



When the water meters / scales are calibrated, prior to production, at what frequency should they be
checked there after? ...ANSWER...3 moths



To what accuracy should the scales for weighing cement , pozzolan, slag and aggregates at the plant be
maintained ...ANSWER...0.5% of maximum load normally handled



For concrete containing a water-reducing retarding admixture, in an agitator truck, the maximum time
for depositing the concrete shall not exceed: ...ANSWER...90 minutes



If a load of concrete has been rejected due to excessive slump, the concrete may remain in the
transporting vehicle to reduce the slump. ...ANSWER...Is not allowed.



Who places the orders for concrete with the producer? ...ANSWER...The contractor



The minimum normal sampling frequency for the chloride content of structural concrete
is: ...ANSWER...1 per design mix in use from the first day of production and every 30 calendar days or
less thereafter.



In what moister condition are the aggregates on the approved concrete mix designs? ...ANSWER...SSD
condition



The specific gravity of an aggregate is the ratio of its unit weight to the weight of an equal absolute
volume of: ...ANSWER...Water



What is the weight of a bag of Portland cement in the USA? ...ANSWER...94 lbs



What is the maximum concrete temperature allowed when using a hot weather design
mix? ...ANSWER...100 degrees F

Document information

Uploaded on
June 1, 2025
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Lectcaptain
5.0
(1)
Sold
4
Followers
0
Items
1002
Last sold
3 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions