©THESTAR 2024/2025 ALL RIGHTS RESERVED 3:09PM. 1 FDOT Asphalt Paving Level 2 Exam Questions And Answers |Latest 2025 | Guaranteed Pass. What makes up a quality asphalt mixture? - AnswerA quality asphalt mixture is determined by the constructability, if it conforms to Specifications, and if it satisfies functional requirements. CQC - Answercontractor quality control Superpave - AnswerAsphalt mix design system since 1998 QCP - AnswerQuality control plan QCM - AnswerQuality control Manual QC - AnswerQuality Control (Contracting Testing and Inspection) VT - AnswerVerification Testing (FDOT or CEI Verification) CEI - AnswerConstruction Engineering and Inspection RT - AnswerResolution Testing (FDOT) IV - AnswerIndependent Verification Testing IA - AnswerIndependent Assurance Testing The decision-making authority on a job needs to be given to who? - AnswerNeeds to be given to the level closet to the work as specified in the specifications. It ensure a quick handle on situations and issues. The governing order of project documents from high (1) to low (7) starts with the highest being - AnswerSpecial Provisions The governing order of project documents from high to low (2) - AnswerTechnical Special Provisions ©THESTAR 2024/2025 ALL RIGHTS RESERVED 3:09PM. 2 The governing order of project documents from high to low (3) - AnswerPlans The governing order of project documents from high to low (4) - AnswerRoad design, structures, and traffic operations standards The governing order of project documents from high to low (5) - AnswerDevelopmental Specifications The governing order of project documents from high to low (6) - AnswerSupplemental Specifications The governing order of project documents from high to low (7) - AnswerStandard Specifications What are the key components in a pre-paving conferences? - AnswerKey Personnel (Paving superintendent) Contractor Input Agency Input QC Plan Review Discuss more specific key topics or issues Meeting Minutes Action items (what to do in situations, who to call) What are the key components in a pre-construction conferences? - AnswerAgency Input (FDOT) Contractor Input (Including the Prime) Project Personnel (Upper - Middle management) Testing Safety Utilities Cities or Municipalities (HOA, school boards) Suppliers What causes the compactive effort increase? - AnswerCrushed aggregate content Nominal maximum size Hardness of the aggrer

Show more Read less
Institution
FDOT
Course
FDOT









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
FDOT
Course
FDOT

Document information

Uploaded on
February 24, 2025
Number of pages
7
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

©THESTAR 2024/2025 ALL RIGHTS RESERVED 3:09PM.




FDOT Asphalt Paving Level 2 Exam
Questions And Answers |Latest 2025 |
Guaranteed Pass.


What makes up a quality asphalt mixture? - Answer✔A quality asphalt mixture is determined by
the constructability, if it conforms to Specifications, and if it satisfies functional requirements.

CQC - Answer✔contractor quality control

Superpave - Answer✔Asphalt mix design system since 1998

QCP - Answer✔Quality control plan

QCM - Answer✔Quality control Manual

QC - Answer✔Quality Control (Contracting Testing and Inspection)

VT - Answer✔Verification Testing (FDOT or CEI Verification)

CEI - Answer✔Construction Engineering and Inspection

RT - Answer✔Resolution Testing (FDOT)

IV - Answer✔Independent Verification Testing

IA - Answer✔Independent Assurance Testing

The decision-making authority on a job needs to be given to who? - Answer✔Needs to be given
to the level closet to the work as specified in the specifications. It ensure a quick handle on
situations and issues.
The governing order of project documents from high (1) to low (7) starts with the highest being
- Answer✔Special Provisions

The governing order of project documents from high to low (2) - Answer✔Technical Special
Provisions


1

, ©THESTAR 2024/2025 ALL RIGHTS RESERVED 3:09PM.


The governing order of project documents from high to low (3) - Answer✔Plans

The governing order of project documents from high to low (4) - Answer✔Road design,
structures, and traffic operations standards

The governing order of project documents from high to low (5) - Answer✔Developmental
Specifications

The governing order of project documents from high to low (6) - Answer✔Supplemental
Specifications

The governing order of project documents from high to low (7) - Answer✔Standard
Specifications

What are the key components in a pre-paving conferences? - Answer✔Key Personnel (Paving
superintendent)
Contractor Input
Agency Input
QC Plan Review
Discuss more specific key topics or issues
Meeting Minutes
Action items (what to do in situations, who to call)

What are the key components in a pre-construction conferences? - Answer✔Agency Input
(FDOT)
Contractor Input (Including the Prime)
Project Personnel (Upper - Middle management)
Testing
Safety
Utilities
Cities or Municipalities (HOA, school boards)
Suppliers

What causes the compactive effort increase? - Answer✔Crushed aggregate content
Nominal maximum size
Hardness of the aggrergate

2

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TheStar Florida State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
596
Member since
1 year
Number of followers
178
Documents
23585
Last sold
4 hours ago
Stuvia Prodigy

Tested, Verified and Updated Study Materials with 100% Guaranteed Success.

3.8

119 reviews

5
56
4
21
3
21
2
4
1
17

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions