What is one characteristic of an effective Agile Team? - ANSWER✔✔-To provide steady, high quality,
incremental value
How does a Scrum Master lead a team's efforts in relentless improvement? - ANSWER✔✔-By facilitating
the Iteration Retrospective
How does the Scrum Master help teams address the challenges of modern Enterprises? - ANSWER✔✔-
By actively addressing impediments
Why are SAFe Scrum Masters challenged differently in an Enterprise? - ANSWER✔✔-The team is affected
by teams and stakeholders beyond their control
Which SAFe configuration requires having a Vision? - ANSWER✔✔-All SAFe configurations
Which SAFe organizational construct allows businesses to build large and complex systems which require
hundreds of people in a Lean-Agile manner? - ANSWER✔✔-Solution Train
Who is responsible for assisting to establish Continuous Integration in SAFe? - ANSWER✔✔-The System
Team
SAFe Scrum Masters interact with which level(s) of Framework? - ANSWER✔✔-All Levels
Copyright ©Stuvia International BV 2010-2024 Page 1/7
, Copyright © KAYLIN 2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED FIRST PUBLISH NOVEMBER, 2024
One of the Scrum Master's main responsibilities is to communicate with management and outside
stakeholders to help the team in what way? - ANSWER✔✔-Protect them from uncontrolled addition of
work
What provides objective evidence that the system is iterating? - ANSWER✔✔-System Demo
In complex systems development, what do local integration points ensure? - ANSWER✔✔-That each
Capability of the system is meeting its responsibilities in contributing to the overall Solution Intent
Which statement is true about the phase-gate Milestone model? - ANSWER✔✔-It does not mitigate risk
as intended
How can learning Milestones be used? - ANSWER✔✔-To test the concept of a new Feature or Capability
What are two reasons why too much work in process (WIP) is a problem? (Choose two.) - ANSWER✔✔-It
hides bottlenecks in the workflow;It shows that the overall system is inefficient;
What is the connection between feedback and optimum batch size? - ANSWER✔✔-Lack of feedback
contributes to higher holding cost
What is the value of periodic resynchronization? - ANSWER✔✔-It limits variance to a single time interval
How should decentralized decision-making be used with respect to system design? - ANSWER✔✔-When
Agile Teams are empowered, self-organized, and the design is allowed to emerge
During Iteration planning, the Product Owner (PO) introduces a new Story to the team. They cannot
come to a consensus on the size of the new Story and ask the PO for more details. - ANSWER✔✔-No; the
team left the Story in the Team Backlog for further refinement with the PO