Critical path analysis continued 9/1/2023
Calculating the float:
Float – the duration an activity can be extended or postponed so that the project still
finishes within the minimum time
Calculated as:
o LFT – Activity Duration – EST =
Calculating the float:
Float – the duration an activity can be extended or postponed so that the project still
finishes within the minimum time
Calculated as:
o LFT – Activity Duration – EST =