Contingency Response Plan - ANS-Which plan prepares us to react to unforseen
circumstances, such as an enemy attack, with an emphasis on restoring operations,
saving lives, reducing human suffering, and minimizing further damage?
Emergency Operations Center (EOC) - ANS-Which center is established as a command
and control element to direct and monitor pre-attack survival actions and post attack
recovery?
- ANS-
Support Group Commander - ANS-Who directs all base operability, surivability, and
recovery options within the emergency operations center (EOC)
Unit Control Center (UCC) - ANS-Which center does the damage assessment and
response team report hazards?
Structural Soundness - ANS-What must the damage assessment and response team
determine before entering a facility?
Emergency Operations Center (EOC) - ANS-Who controls the airfield damage
assessment team?
Base Civil Engineer (BCE) - ANS-Who normally oversees the minimum operating strip
selection process?
Emergency Operations Center (EOC) - ANS-Which center has the authority to
determine which airfield damage repairs are needed and in what priority?
Guys - ANS-Which type of shoring is particularly effective when damage has been
sustained to end o sidewalls yet roof members have been essentially untouched?
Braces - ANS-Which type of shoring is usually made of structural steel and heavy
timbers?
Jacks - ANS-The type of shoring used to stabilize the structural integrity of a facility
affected by vertical loads (the effects of gravity) is
,Splints - ANS-Which shoring method is particularly useful with reinforced concrete
columns that have not been seriously damaged yet show signs of cracking or minor
fractures?
Tension ties (stitching dogs) - ANS-Which shoring method restores some structural
integrity into a cracked concrete slab?
Ensuring adequate shoring and bracing - ANS-When performing expedient repairs to a
roof, what should your first efforts be towards?
scraping off the charred material and sistering a piece next to it - ANS-How are
emergency repairs made to a fire damaged truss?
ensure the roof still drains properly - ANS-After expedient patches have been made to a
flat roof, the next action you must take is
Shore and brace the area around the hole - ANS-What is the first action you should take
to repair a large hole in a load bearing masonry wall?
Crisis Action Team (CAT) - ANS-Who is responsible for controling sortie generation,
aircraft maintenance, base defense recovery, etc.
Emergency Operations Center (EOC) - ANS-Which center is the focal point for
determining and tracking base damage and repair efforts
CE Chief of Operations; Senior enlisted personnel from the CE organization - ANS-The
UCC is commanded by the ____________________________ and staffed by
__________________________________
Damage Assessment Team (DAT) - ANS-Who assess damage and can make expedient
repairs to the base during a contingency?
Damage Assessment and Response Team (DART) - ANS--Led by CE officer and is
composed of one HVAC/R, utilities, and electrical (officer usually replaced with
structures troop)
-Runs a preditermined route to assess damage and to make repair estimates
-May find UXO, chemical agents, ruptured gas lines, and down or broken power lines
-MUST ENSURE BUILDING IS STRUCTURALLY SOUND BEFORE ENTERING
,Airfield Damage Assessment Team (ADAT) - ANS--consist of one EOD member, an EA,
and one or more augmentees
-EOD member is responsible for team movement when UXOs are involved
-EA identifies spalls, craters, and other information needed for developing the minimup
airfield operation strip (MAOS)
Minimum Airfield Operation Selection Team - ANS--comprised of one EA (for data
plotting) and another CE member for radio operations and data recording
-The BCE normally oversees MAOS selection process and recommends possible
MAOS to the commander
Guys - ANS--usually fashioned out of wire rope and tensioned with turnbuckles
-function in opposing pairs to PROVIDE LATERAL RESTRAINT from wind or ice loading
(SSS)
-effective when end and sidewalls are damaged and roof is untouched
-Tighten in pairs concurrently
bracing - ANS--usually made of structural steel and heavy timbers
-could slide out of position resulting in further damage
Jacking - ANS--stabilizes the structural integrity of a building affected by VERTICAL
LOADS
-the need for this type of bracing is identified by deflected or cracked beams/girders that
need support or damaged columns
-brace them to keep them in place (cut timber 1/2" short then wedge into position)
Splinting - ANS--used to reinforce concrete columns that are not seriously damaged yet
show signs of cracking or minor fracture
-sandwich damaged column beweed two steel plates and secure with threaded rods
Tension Ties - ANS--provide compressive force to help prevent further cracking
-U-shaped and placed like staples (random lengths and placed variably along the crack)
If at least 90% of cross section is not charred and charring does not extend more than
1/16" into wood - ANS-When can charred wood be used in a damaged roof? (Scrape
and scab)
On the bottom; same side - ANS-When assembling and installing the arch assemlies on
the small shelter system (SSS) where are the red-coded arches placed?
, purlin sleeves (placed from the top down) - ANS-In order to secure the purlins to the
arches on a small shelter system (SSS) slip the purlins through the
4-5 inch overlap - ANS-When installing the main cover on a small shelter system (SSS),
you should work the cover over the ends until you have at least a
36 inches away from the side with the top of the anchor away from the shelter -
ANS-Approximately where and how are the guy anchors installed for the small shelter
system (SSS)
Mid liner, side liners, and end liners - ANS-Identify the proper sequence for installing
liners in the small shelter system. (SSS)
Ensure that all power is disconnected from the electrical system at the source -
ANS-What is the first step when disassembling the small shelter system?
Anchor the end base centers - ANS-When assembling a medium shelter syste's (MSS)
base fram, the four single-headed spikes are used to
Install the insulated floor pads first; then install the floor (black side down) - ANS-When
the cold weather kit iis used how is the medium shelter system's (MSS) floor installed?
Four - ANS-How many pullover ropes are used to install the top liner on the medium
shelter system (MSS) ?
Six - ANS-How many pullover ropes are used to install the main cover on the medium
shelter system (MSS)?
Installing the duckbill anchors - ANS-Which of the following procedures is not required
when a medium shelter system (MSS) is anchored to a 4-inch reinforced concrete slab?
47 inches - ANS-At which height above the floor are the receptacles installed in a
medium shelter system (MSS)?
Dome Shelter - ANS-The shelter that can be installed directly on concrete using thunder
studs is the
Aircraft Maintenance Hanger - ANS-Which shelter has a main structure that consist of 7
arches and two endwalls?