NICET Highway Construction Inspector Level III Exam with Questions and Answers
NICET Highway Construction Inspector Level III Exam with Questions and Answers Which method should be considered when placing grouted rock riprap on steep channel slopes near structures? a) dump truck placement b) equipment placement c) geogrid placement d) hand placement ANSWER d) hand placement Prior to the fabricated structural steel being delivered, it was determined that the girder would not fit by 3/8 inches. How would this be corrected? a) change the backwall detail b) erect structural steel c) issue a field memo d) RFI to designer ANSWER d) RFI to designer Which two details should the contractor have prior to installation of support structures? (Chose two). a) design calculations b) inspector's contact information c) shop drawings d) special provisions ANSWER a) design calculations c) shop drawings
Document information
- Uploaded on
- June 1, 2026
- Number of pages
- 21
- Written in
- 2025/2026
- Type
- Exam (elaborations)
- Contains
- Questions & answers