Insulation and Ventilation AHIT 2024 Exam with Correct Solutions
Insulation and Ventilation AHIT 2024 Exam with Correct Solutions Which of the following actions is required during the insulation, ventilation, and attic inspections? A. Required to observed insulation and vapor retarders in unfinished spaces. B. Required to enter the attic space when entry could damage property. C. Required to report on concealed insulation and vapor retarders. D. Required to report on venting equipment that is integral with household appliances. - Answer -A. Required to observed insulation and vapor retarders in unfinished spaces. A vapor barrier should be applied to the_______. A. Plumbing pipes only B. Inside of wall of interior walls C. Attic floor only D. Warm/livable side of the wall - Answer -D. Warm/livable side of the wall Which of the following actions is the home inspector not required to perform during the insulation and ventilation inspection? A. Report on concealed insulation and vapor retarders B. Describe insulation and vapor retarders in unfinished spaces C. Observe insulation and vapor retarders in unfinished spaces D. Observe ventilation of attics and foundation areas - Answer -A. Report on concealed insulation and vapor retarders Where foam board insulation is used: A. it should be covered with a noncombustible material.
Geschreven voor
- Instelling
- Home inspector
- Vak
- Home inspector
Documentinformatie
- Geüpload op
- 16 april 2024
- Aantal pagina's
- 8
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
insulation and ventilation ahit 2024 exam
-
insulation and ventilation ahit 2025 exam
-
which of the following actions is required during
Ook beschikbaar in voordeelbundel