Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

CNST 1361 FINAL 120 QUESTIONS WITH COMPLETE SOLUTIONS.

Rating
-
Sold
-
Pages
14
Grade
A+
Uploaded on
19-11-2025
Written in
2025/2026

CNST 1361 FINAL 120 QUESTIONS WITH COMPLETE SOLUTIONS.

Institution
CNST 1361
Course
CNST 1361

Content preview

CNST 1361 FINAL 120 QUESTIONS WITH COMPLETE
SOLUTIONS.




Which type of estimate is the most accurate? Answer - Unit price estimate


What does AWP stand for? Answer - Advanced Work Packaging


Which of these is not a reported benefit of AWP by the industry? Answer -
Lower initial cost.


The portion of the plot plan that has been defined jointly by Engineering and
Construction that represents a logical physical envelope of work is called:
Answer - Construction Work Area


The portion of work that contains all the necessary elements for a single
construction crew to complete that portion of the work is called: Answer -
Installation Work Package.


The logical subdivision of a CWA construction scope into a defined geographic
area and discipline is called: Answer - Construction Work Package.


The framework that represents the way a project is defined, planned and
managed by breaking down the scope into manageable segments is called:
Answer - Work Breakdown Structure.

, The optimal construction sequence to assemble the facility is called the
__________________, and should be defined during the early planning stages
of a project: Answer - Path of Construction.


Which is NOT a potential result of AWP? Answer - Plant performance.


The Critical Path Method reveals the contiguous path of activities in a network
having the shortest total duration and thus defining the minimum duration of
the project Answer - False


What are some ways to accelerate a schedule (check all that apply)? Answer -
A-
Revise the schedules logic
B-
Use overtime
D-
Use substitute materials or equipment
E-
Increase crew size


What does RFI stand for? Answer - Request for information


Cost data provided by national firms (such as R.S.Means) must be adjusted to
the specific project location. Answer - True


Quality construction is good, and every designer should specify the highest-
quality project components. Answer - False

Written for

Institution
CNST 1361
Course
CNST 1361

Document information

Uploaded on
November 19, 2025
Number of pages
14
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$17.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EvaTee Phoenix University
View profile
Follow You need to be logged in order to follow users or courses
Sold
5144
Member since
4 year
Number of followers
3565
Documents
54167
Last sold
4 hours ago
TIGHT DEADLINE? I CAN HELP

Many students don\'t have the time to work on their academic papers due to balancing with other responsibilities, for example, part-time work. I can relate. kindly don\'t hesitate to contact me, my study guides, notes and exams or test banks, are 100% graded

3.8

938 reviews

5
447
4
166
3
170
2
47
1
108

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions