logo-home

Exam ProMax

Welcome to Exam ProMax – Your Ultimate Source for Exam Q&As!

At Exam ProMax, I specialize in providing realistic exam questions and detailed answers to help you prepare smarter and perform better. Whether you're aiming for top grades or just need a confidence boost before the big day, my materials are built to reflect actual exam styles and formats.

Community

  • Followers
  • Following

751 items

Medical laboratory technician Questions and Correct Answers/ Latest Update / Already Graded

(0)
$14.49
0x  sold

Thermolabile Ans: affected or changed by heat Basophils Ans: WBC with dark purple staining granules Biological hazards Ans: Hazards capable of causing illness in humans 10% bleach (hypochlorite) Ans: Used to clean up biological spills Mutagen Ans: Substance or physical agent capable of causing sudden or lasting changes in hereditary features Dehydration

i x
  • Exam (elaborations)
  •  • 13 pages • 
  • by Exampromax • 
  • uploaded  2026
Quick View
i x

Microbio -gamlar spurningar + jfmed spurningar f/CT2 Questions and Correct Answers/ Latest Update / Already Graded

(0)
$14.49
0x  sold

Spherical bacteria arranged in chain are known as Ans: streptococci Spherical bacteria arranged in clusters are known as Ans: Staphylococci Rod shaped bacteria arranged in chain are known as Ans: Streptobacilli What is the shape of spirochetes Ans: Spiral shaped Commensal microorganism is a microorganisms that... Ans: benefits from the host, does not harm the host but does not help the host either

i x
  • Exam (elaborations)
  •  • 26 pages • 
  • by Exampromax • 
  • uploaded  2026
Quick View
i x

OCI Architect Practice Exams 1-3 Questions and Correct Answers/ Latest Update / Already Graded

(0)
$14.49
0x  sold

Which two statements are true about encryption on Oracle Cloud Infrastructure (OCI)? Ans: By default, object storage and block storage are encrypted at rest By default, DB systems offers an encrypted database You are deploying a highly available web application in Oracle Cloud Infrastructure and have decided to use a public load balancer. The back end web servers will be distributed across all three availability domains (ADS). How many subnets should you create to deliver a sec...

i x
  • Exam (elaborations)
  •  • 36 pages • 
  • by Exampromax • 
  • uploaded  2026
Quick View
i x

Procedure for Setting Up and Erecting Steel Structures Questions and Correct Answers/ Latest Update / Already Graded

(0)
$13.49
0x  sold

Tripod Setup Ans: Position legs evenly; use stabilizer on hard surfaces. Level/Transit Instrument Ans: Attach to tripod, level using 16-degree rotations. Level Rod Ans: Place bottom at desired elevation point. Instrument Head Rotation Ans: Rotate to 0°, 90°, 180°, 270°, and back. Gun Sight Ans: Align instrument head towards the Level Rod. Focus Dials

i x
  • Exam (elaborations)
  •  • 10 pages • 
  • by Exampromax • 
  • uploaded  2026
Quick View
i x

Public utilities test questions Questions and Correct Answers/ Latest Update / Already Graded

(0)
$14.49
0x  sold

Scaffold legs and posts should be supported on what? Ans: Mud sills. (OSHA) When dropping materials outside an exterior wall, a chute would be required over _____ feet Ans: 20 feet. (OSHA) Scaffold components must be able to support what without failure? Ans: Its own weight and four times the maximum intended load. (OSHA) Scaffold platforms greater than 10ft shall not extend over support greater than ____ inches Ans: 18 inches. (OSHA) Where scaffold platforms are lapped to ...

i x
  • Exam (elaborations)
  •  • 61 pages • 
  • by Exampromax • 
  • uploaded  2026
Quick View
i x

Public Utilities Problem Codes Questions and Correct Answers/ Latest Update / Already Graded

(0)
$13.49
0x  sold

UBN Ans: Utility Barricades Needed UCABLE Ans: Utility Cable TV Line Down UDIR Ans: Utility Debris in the Road UDSS Ans: Utility Social Services Request UPOWER Ans: Utility Electrical Wires Down/Pole Down UFLOOD

i x
  • Exam (elaborations)
  •  • 4 pages • 
  • by Exampromax • 
  • uploaded  2026
Quick View
i x

Public Works - California Contractors (Law and Business) Questions and Correct Answers/ Latest Update / Already Graded

(0)
$13.49
0x  sold

Which of the following costs are significant when bidding on public works projects? A. Bonds B. Wages C. Insurance D. Overhead cost Ans: B. Wages Of the following, who may NOT file a stop notice on a public works? A. The prime contractor B. Subcontractor C. Material supplier D. Surveyor Ans: A. The prime contractor

i x
  • Exam (elaborations)
  •  • 9 pages • 
  • by Exampromax • 
  • uploaded  2026
Quick View
i x

Residential fire sprinklers Questions and Correct Answers/ Latest Update / Already Graded

(0)
$13.49
0x  sold

Name 3 styles of automatic sprinkler system Ans: 1) dry 2) wet 3) preaction Association that developed new sprinkler concept for residential Ans: National fire protection association 7 advantages of residential system Ans: A) prevent loss of lives B) saves property C)part of overall overall fire protection D)good for business E) lower insurance F) increase value of property G) cost effective

i x
  • Exam (elaborations)
  •  • 12 pages • 
  • by Exampromax • 
  • uploaded  2026
Quick View
i x

Stats Exam #1: R Questions and Correct Answers/ Latest Update / Already Graded

(0)
$14.49
0x  sold

Console Ans: Interactive window that consists of the bottom left pane. This is where you type commands after the > prompt, one at a time Editor Ans: (script window) Window at the top left pane where collections of commands can be edited and saved Run button Ans: Can send code from the editor to console window by highlighting code and hitting this button. Workspace/history window Ans: top right pane that shows all objects you have typed in R. files/plots...

i x
  • Exam (elaborations)
  •  • 31 pages • 
  • by Exampromax • 
  • uploaded  2026
Quick View
i x

Steel and Iron: Extraction, Types, and Structural Uses Questions and Correct Answers/ Latest Update / Already Graded

(0)
$14.49
0x  sold

Iron Ore Ans: A natural mineral from which iron is extracted. Iron Ore Mining Ans: The process of extracting iron ore from the earth. Cast Iron Ans: A type of iron that has been melted and poured into a mold to create a specific shape. Cast Iron Construction Ans: The use of cast iron in building structures, exemplified by Joseph Paxton's Crystal Palace. Prefabricated Parts made with Cast Iron Ans: Components manufactured off-site using cast iron, such ...

i x
  • Exam (elaborations)
  •  • 55 pages • 
  • by Exampromax • 
  • uploaded  2026
Quick View
i x