Actual interchange Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Actual interchange? On this page you'll find 648 study documents about Actual interchange.
All 648 results
Sort by
-
FACHE Weeks 1-12 Combined | 304 Questions and Answers Latest Update 2023/2024 Graded 100%
- Exam (elaborations) • 161 pages • 2023
- Available in package deal
-
- $17.99
- 2x sold
- + learn more
FACHE Weeks 1-12 Combined | 304 Questions and Answers Latest Update 2023/2024 Graded 100%. Separate computer systems are often linked together in order to 
share data and information. When all components of the network 
are located within close proximity of one another, perhaps within 
a single facility, the network known as a: 
a) Wide Area Network (WAN) 
FACHE Weeks 1-12 Combined | 304 Questions and 
Answers 100% Verified Latest Latest Update 2023/2024 
b) World Wide Web (WWW) 
c) Local Area N...
-
NERC Prep - Bal, Int, & Trans Exam Questions and Answers 2023-2024 Graded A+
- Exam (elaborations) • 22 pages • 2023 Popular
- Available in package deal
-
- $15.49
- 1x sold
- + learn more
NERC Prep - Bal, Int, & Trans Exam Questions and Answers Graded A+. What group can approve a change in the 
Disturbance Recovery Period for an Interconnection? 
a. NERC Interconnection Working Group 
b. NERC Operating Committee 
c. NERC Regional Council 
d. NERC Disturbance Analysis Working Group 
c. Check targets and equipment - What is the first thing an operator should do after 
a relay operation? 
a. Check power system stabilizers 
b. Notify adjacent Transmission and Balancing areas 
c. Che...
-
NERC Final Assessment Exam Correct answers (Already GRADED A)
- Exam (elaborations) • 98 pages • 2023
- Available in package deal
-
- $11.99
- 1x sold
- + learn more
When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. 
A. 100 MW 
B. 10% 
C. 50 MW 
D. 25% 
B. 10% 
 
 
Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? 
A. Nuclear generators 
B. Combustion turbine generators 
C. Geothermal generators 
D. Hydroelectric generators 
C. Geothermal generators...
-
CSPR - Certified Specialist Payment Rep (HFMA) Exam 2023 with Complete Solutions
- Exam (elaborations) • 18 pages • 2023
-
- $13.49
- 9x sold
- + learn more
Steps used to control costs of managed care include: - ANSWER-Bundled codes 
Capitation 
Payer and Provider to agree on reasonable payment 
 
DRG is used to classify - ANSWER-Inpatient admissions for the purpose of reimbursing hospitals for each case in a given category w/a negotiated fixed fee, regardless of the actual costs incurred 
 
Identify the various types of private health plan coverage - ANSWER-HMO 
Conventional 
PPO and POS 
HDHP/SO plans - high-deductible health plans with a savings...
-
SOS NERC Prep - Reliability Exam Questions with Complete Solutions Rated A+
- Exam (elaborations) • 78 pages • 2023
- Available in package deal
-
- $14.49
- + learn more
The Reliability Coordinator just informed you of a slow time error correction which will begin at 
the top of the next hour. Your EMS system will not let you change your scheduled frequency. 
Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? 
A) Increase Net Interchange Schedule by 20 MWs. 
B) Inform the Reliability Coordinator that you cannot participate in the time error correction. 
C) Decrease Net Interchange Schedule by 20 MWs. 
D) Increase Net Interchange Schedule b...
Make study stress less painful
-
SOS NERC Prep - Reliability Exam questions with correct answers
- Exam (elaborations) • 91 pages • 2023
- Available in package deal
-
- $14.99
- + learn more
The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? 
 
A) Increase Net Interchange Schedule by 20 MWs. 
 
B) Inform the Reliability Coordinator that you cannot participate in the time error correction. 
 
C) Decrease Net Interchange Schedule by 20 MWs. 
 
D) Increase Net Interchange Sche...
-
SOS NERC Prep - RElIABILITY Exam / SOS NERC Prep - RElIABILITY Exam| 200 QUESTIONS AND ANSWERS | GRADED A+
- Exam (elaborations) • 131 pages • 2024
-
- $12.99
- + learn more
SOS NERC Prep - RElIABILITY 
Exam / SOS NERC Prep - 
RElIABILITY Exam| 200 
QUESTIONS AND ANSWERS | 
GRADED A+ 
The Reliability Coordinator just informed you of a slow time 
error correction which will begin at the top of the next hour. 
Your EMS system will not let you change your scheduled 
frequency. Your Frequency Bias Setting is -100 MW/.1Hz. 
What action should you take? 
A) Increase Net Interchange Schedule by 20 MWs. 
B) Inform the Reliability Coordinator that you cannot 
participate in ...
-
NERC Interchange Transaction Exam (100% Correct Answers)
- Exam (elaborations) • 17 pages • 2023
- Available in package deal
-
- $12.49
- + learn more
Generating units jointly owned by two or more Balancing Authorities may be modeled in the AGC systems as a "virtual" tie line flow (pseudo-tie). To properly account for the jointly owned unit as a pseudo-tie, each Balancing Authority must include a portion o fthe unit's MW output as an adjustment to the ________ in its ACE equation. 
net actual interchange (NIA) 
 
 
A dynamic schedule is commonly used for scheduling jointly-owned generation between Balancing Authority Areas. To properly acco...
-
SOS: NERC Terms and Definitions
- Exam (elaborations) • 32 pages • 2023
- Available in package deal
-
- $14.49
- + learn more
Area Control Error (ACE) CORRECT ANSWER-The instantaneous difference between a Balancing Authority's net actual and scheduled interchange, taking into account the effects of Frequency Bias, correction for meter error, and Automatic Time Error Correction (ATEC), if operating in the ATEC mode. ATEC is only applicable to Balancing Authorities in the Western Interconnection. 
 
Reporting ACE CORRECT ANSWER-The scan rate values of a Balancing Authority's ACE measured in MW, which includes the diffe...
-
SOS NERC Prep - Reliability Exam| 200Questions and Correct Answers.
- Exam (elaborations) • 54 pages • 2023
-
- $12.99
- + learn more
SOS NERC Prep - Reliability Exam| 200Questions and Correct Answers. 
The Reliability Coordinator just informed you of a slow time error correction which will 
begin at the top of the next hour. Your EMS system will not let you change your 
scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action 
should you take? 
A) Increase Net Interchange Schedule by 20 MWs. 
B) Inform the Reliability Coordinator that you cannot participate in the time error 
correction. 
C) Decrease Net ...