The aia Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about The aia? On this page you'll find 388 study documents about The aia.
Page 4 out of 388 results
Sort by
-
CDT Exam 2018 Prep Questions & Answers 2024/2025
- Exam (elaborations) • 33 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
CDT Exam 2018 Prep Questions & Answers 2024/2025 
 
 
If the contractor is delayed in the progress of the Work by Owner, he should: 
a. Write Architect/Engineer protesting the changes 
b. Notify his bonding company 
c. Write the Architect/Engineer requesting a change order granting an extension of time 
d. Stop the Work until Owner makes up his mind. 
 
Review: AIA A201 8.3 , EJCDC C-700 Article 12 - ANSWERSc. Write the Architect/Engineer requesting a change order granting an extension of time...
-
MNO2608 Assignment 4 Semester 2 2024 | Due 25 September 2024
- Exam (elaborations) • 11 pages • 2024
-
- $2.95
- + learn more
MNO2608 Assignment 4 Semester 2 2024 | Due 25 September 2024. All questions answered. 
 
 Question 1 
1.1. An Approved Inspection Authority (AIA) conducts investigations using specialised 
knowledge and equipment. Advise the occupational hygienists of platinum refineries on criteria 
for evaluating AIA applications by the Department of Employment and Labour. 
1.2. Occupational hygiene risk assessment (OHRA) is a systematic method used to identify, 
assess, and manage workplace hazards that co...
-
CDT Test Questions 2024 Graded A+
- Exam (elaborations) • 33 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
CDT Test Questions 2024 Graded A+ 
 
 
1. What establishes the relationship between the Contractor and the Architect/Engineer (A/E)? 
 
A - National laws 
B - Signed agreements 
C - Third-party obligations 
D - Special conditions - ANSWERSAnswer: C - Third-party obligations. The Contractor and the A/E do not have any signed agreements, the general terms and conditions of their respective contracts with the Owner provide them with third party obligations to each other. 
 
Reference: See PDPG Sect...
-
CDT Exam questions and Answers 100% Correct
- Exam (elaborations) • 53 pages • 2024
- Available in package deal
-
- $18.49
- + learn more
CDT Exam questions and Answers 100% 
Correct 
Select the entity which is generally assigned the following duties and responsibilities by 
the Conditions of the Contract: Protection of job site workers and stored materials. 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 
7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CC...
-
CNST 2341 fInal Questions With 100% Correct Answers!!
- Exam (elaborations) • 37 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
`serve as one point of responsibility to who? - the owner 
`The 3 method of payment are ? - 1. Lump Sum 
2. Unit price 
3. Cost Plus 
`total float or simply "float" is also referred to as a what - "slack" 
`With OCIPs and CCIPs the disadvantages of the programs includes what? - increased 
administration burden by the owner or contractor 
`With Sole Proprietorship type of business entity, any debt that exceeds the company's assets must 
what? - Be paid for with private the owner. 
A certifi...
Want to regain your expenses?
-
DBIA 175 Exam Study Guide Questions with Complete Solutions
- Exam (elaborations) • 28 pages • 2024
-
- $10.49
- + learn more
DBIA 175 Exam Study Guide Questions with Complete Solutions 
DBIA Document 580 - Teaming Agreement - Correct Answers Between Design-Builder and teaming party 
 
Components of Teaming Agreement - Correct Answers qualifications, insurance, matrix of responsibilities, confidentiality and exclusivity, payment of stipend/honoarrium 
 
URS CORP v TRANSPO - does teaming agreement waiver survive if subcontract supersedes teaming agreement? - Correct Answers yes. subcontract was silent, waiver in prime f...
-
CDT Exam Prep chapter 1-4 Questions and Elaborated Answers
- Exam (elaborations) • 27 pages • 2024
- Available in package deal
-
- $16.49
- + learn more
CDT Exam Prep chapter 1-4 Questions 
and Elaborated Answers 
Bidding documents are considered legal documents? 
▪ True. 
▪ False. - CORRECT ANSWER-False 
Codes governing commercial construction and residential construction are different? 
▪ True. 
▪ False. - CORRECT ANSWER-True 
The A/E usually hires a construction manager? - CORRECT ANSWER-False 
The Owner, Contractor and A/E are parties to the construction agreement? 
▪ True. 
▪False. - CORRECT ANSWER-False 
There are no differenc...
-
CDT Exam Questions | 100% Correct Answers | Verified | Latest 2024 Version
- Exam (elaborations) • 65 pages • 2024
-
- $12.99
- + learn more
Select the entity which is generally assigned the following duties and responsibilities by the Conditions of 
the Contract: Protection of job site workers and stored materials. 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 
10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCPG 9.14. - Answer: C - Contractor. Safety provisi...
-
Proprac Exam 1
- Exam (elaborations) • 10 pages • 2024
-
- $9.99
- + learn more
Proprac Exam 1 
 
you are a licensed architect and you design a 1,000 sf chicken coop for your friend's farm. you 
do not seal the drawings and specifications before a contractor builds it. (Pick all that Apply) 
A. ETHICAL 
B. UNETHICAL 
C. AIA Code of Ethics, Rule 4.102 
D. NCARB Model Rules of Conduct, Rule 1.2 
E. NCARB Model Rules of Conduct, Rule 5.1 
F. NYS Rules of the Board of Regents, Section 29.3(a)(4) 
G. NYS Education Law Article 147, Section 7307(5)(a) 
H. NYS Education Law Articl...
-
CDT Exam Questions | 100% Correct Answers | Verified | Latest 2024 Version
- Exam (elaborations) • 65 pages • 2024
- Available in package deal
-
- $12.34
- + learn more
CDT Exam Questions | 100% Correct Answers | 
 
Verified | Latest 2024 Version 
 
Select the entity which is generally assigned the following duties and responsibilities by the Conditions of 
the Contract: Protection of job site workers and stored materials. 
 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 
10.1, 10...
How much did you already spend on Stuvia? Imagine there are plenty more of you out there paying for study notes, but this time YOU are the seller. Ka-ching! Discover all about earning on Stuvia