Tank vent shall terminate Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Tank vent shall terminate? On this page you'll find 72 study documents about Tank vent shall terminate.

Page 3 out of 72 results

Sort by

Mass oil burner -NFPA 31 & NORA Exam Questions and Answers
  • Mass oil burner -NFPA 31 & NORA Exam Questions and Answers

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • Mass oil burner -NFPA 31 & NORA Exam Questions and Answers Cast iron fittings can be used in heating fuel systems? - Answer️️ - False Tank vent shall terminate - Answer️️ - Within 12 feet of the fill and visible from the fill Tanks exceeding 330 gallons must have - Answer️️ - Top supply connection Fuel return piping from an appliance shall - Answer️️ - Enter the top of the tank Oil appliances burning used oil shall only be installed - Answer️️ - In commercial or industr...
    (0)
  • $12.49
  • + learn more
Journeyman Plumbing Test Study Guide - Q & A with Complete Solutions
  • Journeyman Plumbing Test Study Guide - Q & A with Complete Solutions

  • Exam (elaborations) • 23 pages • 2024
  • Journeyman Plumbing Test Study Guide - Q & A with Complete Solutions Water heater discharge piping serving a pressure relief valve, temperature relief valve or combination thereof shall terminate not more than ______ above and not less than ______ above the floor or flood level rim of the waste receptor. 6 inches two times the discharge pipe diameter Where a storage tank-type water heater or a hot water heater storage tank is installed in a location where leakage will cause damage, the tank sh...
    (0)
  • $16.49
  • + learn more
Oil Burner License Exam Questions and Answers, Latest Updated 2024/2025 (Verified Answers)
  • Oil Burner License Exam Questions and Answers, Latest Updated 2024/2025 (Verified Answers)

  • Exam (elaborations) • 20 pages • 2024
  • Available in package deal
  • Oil Burner License Exam Questions and Answers, Latest Updated 2024/2025 (Verified Answers) What is the first thing a tech should do when arriving at a no combustion call? - AnswerAsk how many times the customer reset the unit. What is the best long term solution for preventing a clogged nozzle? - Answer- -Remove any underground storage tanks. -Install a quality oil filter. -Cut the suction line 10" above the tank outlet to prevent sludge. Hot water and steam valves are interchangeable. - A...
    (0)
  • $14.99
  • + learn more
Plumbing Year 3 Midterm Exam with Correct Answers 2023
  • Plumbing Year 3 Midterm Exam with Correct Answers 2023

  • Exam (elaborations) • 10 pages • 2023
  • Available in package deal
  • A mathematical process used to accomplish a specific task is known as ________. - Applied mathematics Combustion air ducts shall ________. - Serve a single space Combustion air ducts that terminate in an attic shall _________. - Not be screened Combustion air supplied by using the "standard method" requires a minimum volume of _______. - 50 cu ft per 1,000 btu/hr If the weight of a full tank of water in a water heater is 416.5 pounds, the volume of the tank is _______ gallons. - ...
    (0)
  • $11.99
  • + learn more
Mass oil burner / NFPA 31 & NORA Exam Questions and Answers
  • Mass oil burner / NFPA 31 & NORA Exam Questions and Answers

  • Exam (elaborations) • 13 pages • 2023
  • Available in package deal
  • Cast iron fittings can be used in heating fuel systems? - Answer- False Tank vent shall terminate - Answer- Within 12 feet of the fill and visible from the fill Tanks exceeding 330 gallons must have - Answer- Top supply connection Fuel return piping from an appliance shall - Answer- Enter the top of the tank Oil appliances burning used oil shall only be installed - Answer- In commercial or industrial occupancies Technician must be present for filling of new oil tank - Answer- Fals...
    (0)
  • $12.99
  • + learn more
Plumbing Practice Exam Questions With Complete Solutions
  • Plumbing Practice Exam Questions With Complete Solutions

  • Exam (elaborations) • 8 pages • 2023
  • Available in package deal
  • The minimum diameter for a dry vent is correct answer: 1 1/4 inches The minimum clearance from the center of a water closet to walls, partitions or fixtures on either side is: correct answer: 15 inches During a shower inspection you can determine compliance of safety glazing by correct answer: Looking for the manufacturer's label in the glass Clothes washer discharge into a laundry tub must be protected by correct answer: An air break A water heater inspection includes checking ...
    (0)
  • $10.99
  • + learn more
Oil Burner License Exam Questions and Answers, Latest Updated 2024/2025 (Verified Answers)
  • Oil Burner License Exam Questions and Answers, Latest Updated 2024/2025 (Verified Answers)

  • Exam (elaborations) • 20 pages • 2024
  • Available in package deal
  • Oil Burner License Exam Questions and Answers, Latest Updated 2024/2025 (Verified Answers) What is the first thing a tech should do when arriving at a no combustion call? - AnswerAsk how many times the customer reset the unit. What is the best long term solution for preventing a clogged nozzle? - Answer- -Remove any underground storage tanks. -Install a quality oil filter. -Cut the suction line 10" above the tank outlet to prevent sludge. Hot water and steam valves are interchangeable. - A...
    (0)
  • $13.99
  • + learn more
Journeyman Oil Exam Questions and Answers | Verified & Updated| 100% Correct
  • Journeyman Oil Exam Questions and Answers | Verified & Updated| 100% Correct

  • Exam (elaborations) • 30 pages • 2024
  • Journeyman Oil Exam Questions and Answers | Verified & Updated| 100% Correct The use of furnace cement or other materials to seal a cracked heat exchanger or parts which provide closure shall be for _________ repairs only. - Answer ️️ -Temporary repairs If a fuel storage tank is permanently removed from service for whatever reason, the tank and all the piping connected to it, including the outside fill and vent piping and any supply piping connected to the appliance, shall be: - Answer...
    (0)
  • $13.49
  • + learn more
2015(updated) IRC question correctly answered
  • 2015(updated) IRC question correctly answered

  • Exam (elaborations) • 17 pages • 2023
  • Available in package deal
  • 2015(updated) IRC question correctly answered Storm drainage sump pumps shall be of a capacity and head appropriate to _______ use requirements. - correct answer anticipated Electrical services within the scope of the IRC are limited to _____-volt, 0- to _____- ampere, single-phase systems. - correct answer 120/240 & 400 Boiler pressure-relief valve discharge shall be pipes to drains by gravity to within _____ inches of the floor or to an open receptor. - correct answer 18 Polyethylene ...
    (0)
  • $13.49
  • + learn more
2015 IRC(question with complete solution)rated A+
  • 2015 IRC(question with complete solution)rated A+

  • Exam (elaborations) • 17 pages • 2023
  • Available in package deal
  • 2015 IRC(question with complete solution)rated A+Storm drainage sump pumps shall be of a capacity and head appropriate to _______ use requirements. - correct answer anticipated Electrical services within the scope of the IRC are limited to _____-volt, 0- to _____- ampere, single-phase systems. - correct answer 120/240 & 400 Boiler pressure-relief valve discharge shall be pipes to drains by gravity to within _____ inches of the floor or to an open receptor. - correct answer 18 Polyethyle...
    (0)
  • $11.49
  • + learn more