If your transmission path Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about If your transmission path? On this page you'll find 649 study documents about If your transmission path.
Page 3 out of 649 results
Sort by
-
Practice Test NERC Questions and Correct Answers (GRADED A+)
- Exam (elaborations) • 48 pages • 2023
- Available in package deal
-
- $11.99
- + learn more
A transmission line is operating with a voltage phase angle different of 30 degrees between the sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle difference will be? 
The phase angle will increase. When load is increased phase angle will increase. 
 
 
A load has a power factor of 0.9 lagging. If the load draws 100 MVA, what is the MW draw? 
90 pf= mw/mva 
 
 
The high side of a delta-wye connection transformer is connected to a power s...
-
SOS NERC Prep - RElIABILITY Exam| 200 QUESTIONS AND ANSWERS | GRADED A
- Exam (elaborations) • 109 pages • 2023
- Available in package deal
-
- $11.99
- + learn more
The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? 
 
A) Increase Net Interchange Schedule by 20 MWs. 
 
B) Inform the Reliability Coordinator that you cannot participate in the time error correction. 
 
C) Decrease Net Interchange Schedule by 20 MWs. 
 
D) Increase Net Interchange Sche...
-
NERC book quiz Questions and Answers (100% Correct Elaborations)
- Exam (elaborations) • 29 pages • 2023
- Available in package deal
-
- $10.49
- + learn more
You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? 
-4MW 
 
 
Net actual interchange minus Net scheduled interchange is what? 
Inadvertent interchange 
 
 
Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon and operate a...
-
NERC PREP TEST 101| 200 Questions| accurate Answers| Latest Update
- Exam (elaborations) • 38 pages • 2024
-
- $13.99
- + learn more
NERC PREP TEST 101| 200 Questions| accurate Answers| Latest Update 
 
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? 
 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system - ANSWER a. Generator MVAR output would increase 
 
2. When system conditions are s...
-
NERC PREP Exam Questions and Answers Latest Updated 2024/2025 | 100% Correct
- Exam (elaborations) • 54 pages • 2024
-
- $16.49
- + learn more
If a 500 kV transmission line with a surge impedance loading of 800 MW is 
currently loaded at 1400 MW, which of the following events would most likely 
occur? 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system - a. Generator MVAR output 
would increase 
2. When system conditions are such that emergency procedures are expected to be 
implemented, which of the follow...
Fear of missing out? Then don’t!
-
PJM Generation Dispatch Exam - Questions and Answers (Complete Solutions)
- Exam (elaborations) • 40 pages • 2024
- Available in package deal
-
- $27.49
- + learn more
PJM Generation Dispatch Exam - Questions and Answers (Complete Solutions) Which of the following statements is correct concerning PJM assuming frequency control of the restoration process? A) PJM assumes control once an external transmission tie has been established. B) Once an Area Control Error can be calculated, PJM will assume control. C) Whenever it becomes too much of a burden for any one Transmission Owner within the RTO D) Whenever the Transmission Owners within the RTO agree to let PJ...
-
NERC PREP TEST 101 QUESTIONS AND ANSWERS
- Exam (elaborations) • 38 pages • 2023
-
- $12.99
- + learn more
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? 
 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system - Answer- a. Generator MVAR output would increase 
 
2. When system conditions are such that emergency procedures are expected to be implemented, which of...
-
IOP2602 EXAM PACK 2023
- Exam (elaborations) • 342 pages • 2023
-
- $2.77
- 2x sold
- + learn more
(1) What stages do groups pass through? 
1. Idea generation, implementation and termination. 
2. Introduction, high productivity and decline. 
3. Initiation, evolution, maturation and decline. 
4. Forming, storming, norming, performing and adjourning. 
 
(2) How would you describe a work group? 
1. A group whose individual efforts result in a performance that is greater than the sum 
of the individual inputs. 
2. A group that primarily interacts to share information and to make decision...
-
NERC PREP TEST 101 | 200 QUESTIONS WITH 100 % CORRECT ANSWERS | VERIFIED
- Exam (elaborations) • 55 pages • 2023
- Available in package deal
-
- $15.49
- + learn more
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 
MW, which of the following events would most likely occur? 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system - a. Generator MVAR output would 
increase 
2. When system conditions are such that emergency procedures are expected to be implemented, which 
of the foll...
-
NERC PREP TEST 101 with Guaranteed Accurate Answers
- Exam (elaborations) • 55 pages • 2024
-
- $15.29
- + learn more
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? 
 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system - correct answer a. Generator MVAR output would increase 
 
2. When system conditions are such that emergency procedures are expected to be implemented, w...
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia