Hvac contractor Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Hvac contractor? On this page you'll find 569 study documents about Hvac contractor.
Page 3 out of 569 results
Sort by
-
HVAC CONTRACTOR EXAM
- Exam (elaborations) • 15 pages • 2023
- Available in package deal
-
- $12.49
- + learn more
An instrument that measures potential differences between 2 points in an electrical circuit is called? 
 
A. potentiometer 
B. thermistor 
C. ohmeter 
D. voltmeter - Answer- voltmeter 
 
This device uses a thermal sensing bulb at the outlet of the evaporator to sense temperature and control superheat 
 
A. automatic expansion valve 
B. thermostatic expansion valve 
C. low side float 
D. schraeder valve - Answer- thermostatic expansion valve 
 
when installing a reversing valve on a heat pump, ho...
-
HVAC Contractor Test 1 Questions and Answers Graded A+
- Exam (elaborations) • 3 pages • 2024
- Available in package deal
-
- $8.49
- + learn more
HVAC Contractor Test 1 Questions and 
 
Answers Graded A+ 
 
An air conditioning and refrigeration contracting company must notify the department of all 
licensees who have assigned their licenses to the company and must notify the department within 
how many calendar days when any license whose license is assigned to the company has left the 
company 30 calendar days 
 
within ___ hours after a death of any employee as a result of a work related incident, you must 
report the fatality to the oc...
-
HVAC Contractor prep Test 2 Questions & 100% Verified Answers | Latest Update | Already Graded A+
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
The International Mechanical Code considers a "flammable Vapor" to be concentration 
of flammable constituents in the air which exceeds _____________ percent of its 
flammability limit. 
: 25% 
During installation or service of electrical controls, a digital multimeter set to voltage 
must be connected in what manner? 
: In parallell 
Unvented fuel-burning room heaters are NOT permitted in a Group ___________ 
occupancy? 
: A 
According to the Code, smoke detectors shall be installed in re...
-
HVAC Contractor Prep Test 2 Complete Questions And Answers Graded A+
- Exam (elaborations) • 7 pages • 2023
- Available in package deal
-
- $12.49
- + learn more
HVAC Contractor Prep Test 2 Complete Questions And Answers Graded A+ 
HVAC Contractor Prep Test 2 Complete Questions And Answers Graded A+ 
HVAC Contractor Prep Test 2 Complete Questions And Answers Graded A+
-
HVAC CONTRACTOR Exam | Questions & 100% Correct Answers (Verified) | Latest Update | GradeA+
- Exam (elaborations) • 33 pages • 2024
-
- $14.49
- + learn more
HVAC CONTRACTOR Exam | Questions & 
100% Correct Answers (Verified) | Latest 
Update | GradeA+ 
An instrument that measures potential differences between 2 points in an electrical 
circuit is called? 
A. potentiometer 
B. thermistor 
C. ohmeter 
D. voltmeter 
Correct Answer: voltmeter 
This device uses a thermal sensing bulb at the outlet of the evaporator to sense 
temperature and control superheat 
A. automatic expansion valve 
B. thermostatic expansion valve 
C. low side float 
D. schrae...
Fear of missing out? Then don’t!
-
CSLB B LICENSE GENERAL CONTRACTOR EXAM- QUESTIONS & ANSWERS (100% VERIFIED)
- Exam (elaborations) • 31 pages • 2023
- Available in package deal
-
- $12.99
- 1x sold
- + learn more
CSLB B LICENSE GENERAL CONTRACTOR EXAM- QUESTIONS & ANSWERS (100% VERIFIED) 
CSLB B LICENSE GENERAL CONTRACTOR EXAM- QUESTIONS & ANSWERS (100% VERIFIED) 
 
If unused mortar stiffens due to hydration of cement, what must you do? - ANSWER - Discard the mortar 
 
What minimum time must you wait before caulking or grouting new tiles? - ANSWER - 24-48 Hours 
 
How long should you wait before installing tile on a shower pan? - ANSWER - 24 Hours 
 
Unstable dry rock, angular gravel, sandy loam, and coh...
-
HVAC Contractor Test 1 100% Correct Solved
- Exam (elaborations) • 2 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
HVAC Contractor Test 1 100% Correct Solved 
An air conditioning and refrigeration contracting company must notify the department of 
all licensees who have assigned their licenses to the company and must notify the 
department within how many calendar days when any license whose license is 
assigned to the company has left the company - Correct Answer ️️ -30 calendar days 
within ___ hours after a death of any employee as a result of a work related incident, 
you must report the fatality to ...
-
Hvac Contractor Exam Questions And Answers With Verified Solutions
- Exam (elaborations) • 28 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
Hvac Contractor Exam Questions And Answers With Verified Solutions
-
HVAC Contractor Test 6 Complete Questions And Answers Graded A+
- Exam (elaborations) • 6 pages • 2023
- Available in package deal
-
- $11.49
- + learn more
HVAC Contractor Test 6 Complete Questions And Answers Graded A+ 
HVAC Contractor Test 6 Complete Questions And Answers Graded A+ 
HVAC Contractor Test 6 Complete Questions And Answers Graded A+
-
HVAC CONTRACTOR EXAM UPDATE WITH HIGHLY PREDICTED, CORRECT ANSWERS AND MULTIPLE QUESTIONS |A+ GRADED|
- Exam (elaborations) • 42 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
HVAC CONTRACTOR EXAM UPDATE WITH HIGHLY PREDICTED, CORRECT ANSWERS AND MULTIPLE QUESTIONS |A+ GRADED|
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia