The aia Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about The aia? On this page you'll find 333 study documents about The aia.

Page 2 out of 333 results

Sort by

Professional Practice 482 / 582 Second Half UB ARC Pro Practice Questions With Complete Solutions
  • Professional Practice 482 / 582 Second Half UB ARC Pro Practice Questions With Complete Solutions

  • Exam (elaborations) • 16 pages • 2023
  • AIA Document C-401 refers to: correct answer: C. Architect-Consultant Agreement According to AIA Document C-401, The General Provisions (Articles 1.1 & 1.2), provide the following clarifications of the contract (Choose the one (1) which does not apply): correct answer: B. The architect can require the consultant to do whatever they believe is necessary. According to AIA Document C-401 (1.5), except as otherwise authorized by the Architect, all communications between the Consultant and th...
    (0)
  • $12.99
  • + learn more
CDT EXAM QUESTIONS AND ANSWERS
  • CDT EXAM QUESTIONS AND ANSWERS

  • Exam (elaborations) • 55 pages • 2023
  • Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCPG 9.14. - Answer- Answer: C - Contractor. Safe...
    (0)
  • $14.49
  • + learn more
CDT Exam Questions and Answers (Verified).
  • CDT Exam Questions and Answers (Verified).

  • Exam (elaborations) • 54 pages • 2023
  • CDT Exam Questions and Answers (Verified). Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCPG 9....
    (0)
  • $12.99
  • + learn more
CDT Exam Questions and Answers (Verified).
  • CDT Exam Questions and Answers (Verified).

  • Exam (elaborations) • 54 pages • 2023
  • CDT Exam Questions and Answers (Verified). Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCPG 9....
    (0)
  • $12.99
  • + learn more
ARE 5.0 Project Management exam 2024 with 100% correct answers
  • ARE 5.0 Project Management exam 2024 with 100% correct answers

  • Exam (elaborations) • 31 pages • 2024
  • Out of the following insurances which is not required by the architect to maintain by the owner architect agreement? General liability, automobile liability, workers compensation, general commercial liability - correct answer General commercial liability insurance is not required per AIA B101, but it is preferred Name 4 items that are effective organizational tools for a project manager at the beginning of a project; - correct answer - Project description - Internal project budget -...
    (0)
  • $16.49
  • + learn more
CDT Exam questions With Correct Answers 100% Solved
  • CDT Exam questions With Correct Answers 100% Solved

  • Exam (elaborations) • 66 pages • 2024
  • CDT Exam questions With Correct Answers 100% Solved Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6....
    (0)
  • $15.49
  • + learn more
CDT Exam Questions And Correct  Answers
  • CDT Exam Questions And Correct Answers

  • Exam (elaborations) • 82 pages • 2023
  • Available in package deal
  • CDT Exam Questions And Correct Answers Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCP...
    (0)
  • $15.49
  • + learn more
FL Business and Finance Practice Test exam 2023/2024 with 100% correct answers
  • FL Business and Finance Practice Test exam 2023/2024 with 100% correct answers

  • Exam (elaborations) • 14 pages • 2023
  • The owner must prove financial capability no later than ________ days prior to the expiration of the time for withdrawal of bids. A. 3 B. 5 C.7 D.30 - correct answer Answer: C. 7 - AIA 701.6.2 How many copies of the plans and specifications shall the contractor maintain on site? A. 1 B. 2 C. 3 D. 4 - correct answer Answer: A. 1 - AIA201 2.3.6 Contracts entered into by unlicensed contractors ________________. A. are immoral B.are illegal C. are enforceable D. are unenforceable - correc...
    (0)
  • $15.49
  • + learn more
CDT Exam Prep 1-4 Set Test  Questions And Revised Correct  Answers
  • CDT Exam Prep 1-4 Set Test Questions And Revised Correct Answers

  • Exam (elaborations) • 40 pages • 2024
  • Available in package deal
  • CDT Exam Prep 1-4 Set Test Questions And Revised Correct Answers Bidding documents are considered legal documents? ▪ True. ▪ False. - ANSWER False Codes governing commercial construction and residential construction are different? ▪ True. ▪ False. - ANSWER True The A/E usually hires a construction manager? - ANSWER False The Owner, Contractor and A/E are parties to the construction agreement? ▪ True. ▪False. - ANSWER False There are no differences between the AIA a...
    (0)
  • $12.99
  • + learn more
CDT Exam questions and Answers 100%  Correct
  • CDT Exam questions and Answers 100% Correct

  • Exam (elaborations) • 53 pages • 2024
  • Available in package deal
  • CDT Exam questions and Answers 100% Correct Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CC...
    (0)
  • $17.99
  • + learn more